Category:INSPECTION REPORT
MONTHYEARIR 05000277/19990071999-10-19019 October 1999 Insp Rept 50-277/99-07 & 50-278/99-07 on 990810-0922.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19990051999-07-27027 July 1999 Insp Repts 50-277/99-05 & 50-278/99-05 on 990518-0628. Non-cited Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990041999-06-11011 June 1999 Insp Repts 50-277/99-04 & 50-278/99-04 on 990405-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990011999-03-25025 March 1999 Insp Repts 50-277/99-01 & 50-278/99-01 on 990105-0215.No Violations Noted.Major Areas Inspected:Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support Including Security & Safeguards Activities IR 05000277/19980111999-02-0101 February 1999 Insp Repts 50-277/98-11 & 50-278/98-11 on 981110-990104. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19980091999-02-0101 February 1999 Insp Repts 50-277/98-09 & 50-278/98-09 on 981116-1204. Violations Noted.Major Areas Inspected:Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operating Conditions IR 05000277/19980121998-12-16016 December 1998 Insp Repts 50-277/98-12 & 50-278/98-12 on 981116-19.No Violations Noted.Major Areas Inspected:Emergency Preparedness full-participation Exercise Evaluation IR 05000277/19980101998-12-11011 December 1998 Insp Repts 50-277/98-10 & 50-278/98-10 on 980922-1109. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support ML20155D4571998-10-28028 October 1998 Insp Repts 50-277/98-08 & 50-278/98-08 on 980811-0921. Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19980071998-09-15015 September 1998 Insp Repts 50-277/98-07 & 50-278/98-07 on 980623-0810.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000171/19980011998-08-0707 August 1998 Insp Rept 50-171/98-01 on 980612.No Violations Noted. Major Areas Inspected:Review of Facility Mgt & Control, Decommissioning Support Activities,Radiological Safety & Independent Measurements by Inspector ML20236R7661998-07-16016 July 1998 Insp Repts 50-277/98-06 & 50-278/98-06 on 980505-0622. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19980021998-06-0909 June 1998 Insp Repts 50-277/98-02 & 50-278/98-02 on 980315-0504. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19970041998-05-14014 May 1998 Insp Repts 50-277/97-04 & 50-278/98-04 on 980309-13 & 0330-0403 (Onsite) & 980314-0429 (Inoffice).Violation Noted. Major Areas Inspected:Licensed Operator Requalification Training & Evaluation & Maint Rule Implementation Areas IR 05000278/19980051998-05-0707 May 1998 Insp Rept 50-278/98-05 on 980330-0424.Violations Noted. Major Areas Inspected:Events Re Discovery of Foreign Matl in 3A Core Spray Pump on 980324 IR 05000277/19980011998-05-0101 May 1998 Insp Repts 50-277/98-01 & 50-278/98-01 on 980118-0314. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20217N3771998-03-30030 March 1998 Insp Rept 50-277/98-03 on 980212-0303.Violations Noted.Major Areas Inspected:Reviewed Events,Significance,Reportability & CAs for 2 'A' RFP Turbine High Level Trip Events Involving 3 1997 Failures & 1 Trip on 980206 ML20203E3701998-02-20020 February 1998 Insp Repts 50-277/97-08 & 50-278/97-08 on 971123-980117. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000277/19970071997-12-16016 December 1997 Insp Repts 50-277/97-07 & 50-278/97-07 on 970921-1122. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19970061997-10-15015 October 1997 Insp Repts 50-277/97-06 & 50-278/97-06 on 970810-0920.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000277/19970051997-09-12012 September 1997 Insp Repts 50-277/97-05 & 50-278/97-05 on 970608-0809. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20149L2951997-07-24024 July 1997 Insp Repts 50-277/97-04 & 50-278/97-04 on 970504-0607. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20140D2051997-06-0404 June 1997 Integrated Insp Repts 50-277/97-02 & 50-278/97-02 on 970308-0503.Violations Noted.Major Areas Inspected: Operations,Surveillance,Maint,Engineering,Technical Support & Plant Support IR 05000277/19970011997-04-14014 April 1997 Insp Repts 50-277/97-01 & 50-278/97-01 on 970112-0308.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support ML20138P2661997-02-10010 February 1997 Insp Repts 50-277/97-03 & 50-278/97-03 on 961209-970131. Violations Noted.Major Areas Inspected:Areas Involving Radiological Environ Monitoring Programs ML20134K2821997-02-0707 February 1997 Insp Repts 50-277/96-09 & 50-278/96-09 on 961110-970111.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support IR 05000277/19960121996-12-20020 December 1996 Insp Repts 50-277/96-12 & 50-278/96-12 on 961119-21.No Violations Noted.Major Areas Inspected:Erf Staffing, Procedure Implementation,Effectiveness of Mitigation Actions,Communications & Command & Control ML20132G4901996-12-20020 December 1996 Insp Repts 50-277/96-11,50-278/96-11,50-352/96-08 & 50-353/96-08 on 961003-1127.No Violations Noted.Major Areas Inspected:Documentations Containing Safeguards Info ML20132E9271996-12-18018 December 1996 Insp Repts 50-277/96-08 & 50-278/96-08 on 960908-1109. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20138G2791996-09-0707 September 1996 Insp Repts 50-277/96-06 & 50-278/96-06 on 960707-960907. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support IR 05000277/19940101994-08-0404 August 1994 Insp Repts 50-277/94-10 & 50-278/94-10 on 940605-0716.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Engineering & Technical Support ML20059C7791993-12-20020 December 1993 Enforcement Conference Repts 50-277/93-27 & 50-278/93-27 on 931210.Areas Discussed:Safety Significance of Three Events Re Entry Into Controlled Areas W/O Satisfying Radiological Safety Requirements During Period of 931027-29 IR 05000277/19930281993-12-20020 December 1993 Insp Repts 50-277/93-28 & 50-278/93-28 on 931115-19.No Violations Noted.Major Areas Inspected:Licensee Main Steam Safety Valve & Safety/Relief Valve Related Activities ML20058D3431993-11-23023 November 1993 Insp Repts 50-277/93-27 & 50-278/93-27 on 931004-10.No Violations Noted.Major Areas Inspected:Alara,Planning for Radiological Work,Radiation Worker Practices,Training & Qualifications & Shipping of LLW for Disposal IR 05000277/19930241993-11-22022 November 1993 Insp Repts 50-277/93-24 & 50-278/93-24 on 930914-1030. Violation Noted.Major Areas Inspected:Operations,Refueling Maint,Surveillance,Engineering & Technical Support IR 05000277/19930261993-11-0808 November 1993 Insp Repts 50-277/93-26 & 50-278/93-26 on 930920-30.Major Areas Inspected:Isi Program & Related Activities IR 05000277/19930301993-11-0808 November 1993 Insp Repts 50-277/93-30 & 50-278/93-30 on 931018-22.No Violations Noted.Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs IR 05000277/19930291993-11-0101 November 1993 Insp Repts 50-277/93-29 & 50-278/93-29 on 931012-15.No Violations Noted.Major Areas Inspected:Review of Pims Interface W/Maintenance Including Work Order Development & Maintenance trending,Unit-3 Arts/Mell Mod Training ML20058M2461993-10-19019 October 1993 Insp Repts 50-277/PA-93-02 & 50-278/PA-93-02 on 930913-14. No Violations Noted.Major Areas Inspected:Llrw Shipment to Burial Site Including,Shipping Documentation,Package Insp, Labeling,Marking,Placarding,Vehicle Insp IR 05000277/19930231993-10-13013 October 1993 Insp Repts 50-277/93-23 & 50-278/93-23 on 930913-17.No Violations Noted.Major Areas Inspected:Security Audits, Detection & Assessment Aids,Access Control of Personnel, Packages & Vehicles,Vital Key Area Control & Alarm Stations ML20057E7921993-10-0101 October 1993 Insp Repts 50-277/93-19 & 50-278/93-19 on 930802-06.No Violations Noted.Major Areas Inspected:Alara,External Dosimetry,Nuclear Quality Assurance Audits & Shipping of low-level Wastes for Disposal ML20057E2731993-09-27027 September 1993 Insp Repts 50-277/93-18 & 50-278/93-18 on 930802-06.No Violations Noted.Major Areas Inspected:Operational Objectives & Goals,Effectiveness of Performance & Self Assessment ML20057C2281993-09-22022 September 1993 Insp Repts 50-277/93-17 & 50-278/93-17 on 930803-0913.No Violations Noted.Major Areas Inspected:Util Staff & Mgt Response to Plant Events to Verify Proper Identification of Root Causes ML20057C1121993-09-16016 September 1993 Insp Repts 50-277/93-10 & 50-278/93-10 on 930628-30.Onsite Response to Exercise Scenario Very Good.Major Areas inspected:annual,partial-participation Emergency Preparedness Exercise IR 05000277/19930161993-08-0505 August 1993 Insp Repts 50-277/93-16 & 50-278/93-16 on 930712-15.Actions Taken to Strengthen Perceived Weaknesses Noted.Major Areas Inspected:Erosion/Corrosion Program,Per GL 89-08 ML20127N6521993-01-25025 January 1993 Insp Repts 50-277/92-32 & 50-278/92-32 on 921215-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Technical Support, Qa,Radiological Controls & Physical Security IR 05000277/19920321993-01-25025 January 1993 Insp Repts 50-277/92-32 & 50-278/92-32 on 921215-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Technical Support, Qa,Radiological Controls & Physical Security IR 05000277/19920821993-01-11011 January 1993 Insp Repts 50-277/92-82 & 50-278/92-82 on 921019-23 & 1130. Violations Noted.Major Areas Inspected:Licensee GL 89-10 Program & Walkdown IR 05000277/19920291992-12-24024 December 1992 Insp Repts 50-277/92-29 & 50-278/92-29 on 921101-1214.Minor Safety Significance Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance,Engineering & Technical Support & Assurance of Quality IR 05000277/19920311992-12-15015 December 1992 Insp Repts 50-277/92-31 & 50-278/92-31 on 921116-20.No Violations Noted.Major Areas Inspected:Design & Procedures Used to Mitigate Consequences of Cable Spreading Room Fire 1999-07-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000277/19990071999-10-19019 October 1999 Insp Rept 50-277/99-07 & 50-278/99-07 on 990810-0922.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19990051999-07-27027 July 1999 Insp Repts 50-277/99-05 & 50-278/99-05 on 990518-0628. Non-cited Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990041999-06-11011 June 1999 Insp Repts 50-277/99-04 & 50-278/99-04 on 990405-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990011999-03-25025 March 1999 Insp Repts 50-277/99-01 & 50-278/99-01 on 990105-0215.No Violations Noted.Major Areas Inspected:Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support Including Security & Safeguards Activities IR 05000277/19980111999-02-0101 February 1999 Insp Repts 50-277/98-11 & 50-278/98-11 on 981110-990104. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19980091999-02-0101 February 1999 Insp Repts 50-277/98-09 & 50-278/98-09 on 981116-1204. Violations Noted.Major Areas Inspected:Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operating Conditions IR 05000277/19980121998-12-16016 December 1998 Insp Repts 50-277/98-12 & 50-278/98-12 on 981116-19.No Violations Noted.Major Areas Inspected:Emergency Preparedness full-participation Exercise Evaluation IR 05000277/19980101998-12-11011 December 1998 Insp Repts 50-277/98-10 & 50-278/98-10 on 980922-1109. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support ML20155D4571998-10-28028 October 1998 Insp Repts 50-277/98-08 & 50-278/98-08 on 980811-0921. Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19980071998-09-15015 September 1998 Insp Repts 50-277/98-07 & 50-278/98-07 on 980623-0810.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000171/19980011998-08-0707 August 1998 Insp Rept 50-171/98-01 on 980612.No Violations Noted. Major Areas Inspected:Review of Facility Mgt & Control, Decommissioning Support Activities,Radiological Safety & Independent Measurements by Inspector ML20236R7661998-07-16016 July 1998 Insp Repts 50-277/98-06 & 50-278/98-06 on 980505-0622. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19980021998-06-0909 June 1998 Insp Repts 50-277/98-02 & 50-278/98-02 on 980315-0504. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19970041998-05-14014 May 1998 Insp Repts 50-277/97-04 & 50-278/98-04 on 980309-13 & 0330-0403 (Onsite) & 980314-0429 (Inoffice).Violation Noted. Major Areas Inspected:Licensed Operator Requalification Training & Evaluation & Maint Rule Implementation Areas IR 05000278/19980051998-05-0707 May 1998 Insp Rept 50-278/98-05 on 980330-0424.Violations Noted. Major Areas Inspected:Events Re Discovery of Foreign Matl in 3A Core Spray Pump on 980324 IR 05000277/19980011998-05-0101 May 1998 Insp Repts 50-277/98-01 & 50-278/98-01 on 980118-0314. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20217N3771998-03-30030 March 1998 Insp Rept 50-277/98-03 on 980212-0303.Violations Noted.Major Areas Inspected:Reviewed Events,Significance,Reportability & CAs for 2 'A' RFP Turbine High Level Trip Events Involving 3 1997 Failures & 1 Trip on 980206 ML20203E3701998-02-20020 February 1998 Insp Repts 50-277/97-08 & 50-278/97-08 on 971123-980117. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000277/19970071997-12-16016 December 1997 Insp Repts 50-277/97-07 & 50-278/97-07 on 970921-1122. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19970061997-10-15015 October 1997 Insp Repts 50-277/97-06 & 50-278/97-06 on 970810-0920.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000277/19970051997-09-12012 September 1997 Insp Repts 50-277/97-05 & 50-278/97-05 on 970608-0809. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20149L2951997-07-24024 July 1997 Insp Repts 50-277/97-04 & 50-278/97-04 on 970504-0607. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20140D2051997-06-0404 June 1997 Integrated Insp Repts 50-277/97-02 & 50-278/97-02 on 970308-0503.Violations Noted.Major Areas Inspected: Operations,Surveillance,Maint,Engineering,Technical Support & Plant Support IR 05000277/19970011997-04-14014 April 1997 Insp Repts 50-277/97-01 & 50-278/97-01 on 970112-0308.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support ML20138P2661997-02-10010 February 1997 Insp Repts 50-277/97-03 & 50-278/97-03 on 961209-970131. Violations Noted.Major Areas Inspected:Areas Involving Radiological Environ Monitoring Programs ML20134K2821997-02-0707 February 1997 Insp Repts 50-277/96-09 & 50-278/96-09 on 961110-970111.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support IR 05000277/19960121996-12-20020 December 1996 Insp Repts 50-277/96-12 & 50-278/96-12 on 961119-21.No Violations Noted.Major Areas Inspected:Erf Staffing, Procedure Implementation,Effectiveness of Mitigation Actions,Communications & Command & Control ML20132G4901996-12-20020 December 1996 Insp Repts 50-277/96-11,50-278/96-11,50-352/96-08 & 50-353/96-08 on 961003-1127.No Violations Noted.Major Areas Inspected:Documentations Containing Safeguards Info ML20132E9271996-12-18018 December 1996 Insp Repts 50-277/96-08 & 50-278/96-08 on 960908-1109. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20138G2791996-09-0707 September 1996 Insp Repts 50-277/96-06 & 50-278/96-06 on 960707-960907. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support IR 05000277/19940101994-08-0404 August 1994 Insp Repts 50-277/94-10 & 50-278/94-10 on 940605-0716.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Engineering & Technical Support ML20059C7791993-12-20020 December 1993 Enforcement Conference Repts 50-277/93-27 & 50-278/93-27 on 931210.Areas Discussed:Safety Significance of Three Events Re Entry Into Controlled Areas W/O Satisfying Radiological Safety Requirements During Period of 931027-29 IR 05000277/19930281993-12-20020 December 1993 Insp Repts 50-277/93-28 & 50-278/93-28 on 931115-19.No Violations Noted.Major Areas Inspected:Licensee Main Steam Safety Valve & Safety/Relief Valve Related Activities ML20058D3431993-11-23023 November 1993 Insp Repts 50-277/93-27 & 50-278/93-27 on 931004-10.No Violations Noted.Major Areas Inspected:Alara,Planning for Radiological Work,Radiation Worker Practices,Training & Qualifications & Shipping of LLW for Disposal IR 05000277/19930241993-11-22022 November 1993 Insp Repts 50-277/93-24 & 50-278/93-24 on 930914-1030. Violation Noted.Major Areas Inspected:Operations,Refueling Maint,Surveillance,Engineering & Technical Support IR 05000277/19930261993-11-0808 November 1993 Insp Repts 50-277/93-26 & 50-278/93-26 on 930920-30.Major Areas Inspected:Isi Program & Related Activities IR 05000277/19930301993-11-0808 November 1993 Insp Repts 50-277/93-30 & 50-278/93-30 on 931018-22.No Violations Noted.Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs IR 05000277/19930291993-11-0101 November 1993 Insp Repts 50-277/93-29 & 50-278/93-29 on 931012-15.No Violations Noted.Major Areas Inspected:Review of Pims Interface W/Maintenance Including Work Order Development & Maintenance trending,Unit-3 Arts/Mell Mod Training ML20058M2461993-10-19019 October 1993 Insp Repts 50-277/PA-93-02 & 50-278/PA-93-02 on 930913-14. No Violations Noted.Major Areas Inspected:Llrw Shipment to Burial Site Including,Shipping Documentation,Package Insp, Labeling,Marking,Placarding,Vehicle Insp IR 05000277/19930231993-10-13013 October 1993 Insp Repts 50-277/93-23 & 50-278/93-23 on 930913-17.No Violations Noted.Major Areas Inspected:Security Audits, Detection & Assessment Aids,Access Control of Personnel, Packages & Vehicles,Vital Key Area Control & Alarm Stations ML20057E7921993-10-0101 October 1993 Insp Repts 50-277/93-19 & 50-278/93-19 on 930802-06.No Violations Noted.Major Areas Inspected:Alara,External Dosimetry,Nuclear Quality Assurance Audits & Shipping of low-level Wastes for Disposal ML20057E2731993-09-27027 September 1993 Insp Repts 50-277/93-18 & 50-278/93-18 on 930802-06.No Violations Noted.Major Areas Inspected:Operational Objectives & Goals,Effectiveness of Performance & Self Assessment ML20057C2281993-09-22022 September 1993 Insp Repts 50-277/93-17 & 50-278/93-17 on 930803-0913.No Violations Noted.Major Areas Inspected:Util Staff & Mgt Response to Plant Events to Verify Proper Identification of Root Causes ML20057C1121993-09-16016 September 1993 Insp Repts 50-277/93-10 & 50-278/93-10 on 930628-30.Onsite Response to Exercise Scenario Very Good.Major Areas inspected:annual,partial-participation Emergency Preparedness Exercise IR 05000277/19930161993-08-0505 August 1993 Insp Repts 50-277/93-16 & 50-278/93-16 on 930712-15.Actions Taken to Strengthen Perceived Weaknesses Noted.Major Areas Inspected:Erosion/Corrosion Program,Per GL 89-08 ML20127N6521993-01-25025 January 1993 Insp Repts 50-277/92-32 & 50-278/92-32 on 921215-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Technical Support, Qa,Radiological Controls & Physical Security IR 05000277/19920321993-01-25025 January 1993 Insp Repts 50-277/92-32 & 50-278/92-32 on 921215-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Technical Support, Qa,Radiological Controls & Physical Security IR 05000277/19920821993-01-11011 January 1993 Insp Repts 50-277/92-82 & 50-278/92-82 on 921019-23 & 1130. Violations Noted.Major Areas Inspected:Licensee GL 89-10 Program & Walkdown IR 05000277/19920291992-12-24024 December 1992 Insp Repts 50-277/92-29 & 50-278/92-29 on 921101-1214.Minor Safety Significance Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance,Engineering & Technical Support & Assurance of Quality IR 05000277/19920311992-12-15015 December 1992 Insp Repts 50-277/92-31 & 50-278/92-31 on 921116-20.No Violations Noted.Major Areas Inspected:Design & Procedures Used to Mitigate Consequences of Cable Spreading Room Fire 1999-07-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000277/19990071999-10-19019 October 1999 Insp Rept 50-277/99-07 & 50-278/99-07 on 990810-0922.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19993021999-10-13013 October 1999 NRC Operator Licensing Exam Repts 50-277/99-302OL & 50-278/99-302OL (Including Completed & Graded Tests) for Tests Administered on 990913-16.All Applicants Passed All Portions of Exams IR 05000277/19993011999-08-0404 August 1999 NRC Operator Licensing Exam Repts 50-277/99-301 & 50-278/99-301 Administered on 990702-14 (Administration) & 990715-22 (Grading).Six of Six Limited SROs Passed All Portions of Exams IR 05000277/19990051999-07-27027 July 1999 Insp Repts 50-277/99-05 & 50-278/99-05 on 990518-0628. Non-cited Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990041999-06-11011 June 1999 Insp Repts 50-277/99-04 & 50-278/99-04 on 990405-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990011999-03-25025 March 1999 Insp Repts 50-277/99-01 & 50-278/99-01 on 990105-0215.No Violations Noted.Major Areas Inspected:Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support Including Security & Safeguards Activities PNO-I-99-011, on 990208,operators Experienced lock-up of Unit 2 Plant Monitoring Sys Computers While Performing Testing for Y2K Mod of Rod Worth Minimizer Sys.Region I Public Affairs Prepared to Respond to Media Inquiries1999-03-0303 March 1999 PNO-I-99-011:on 990208,operators Experienced lock-up of Unit 2 Plant Monitoring Sys Computers While Performing Testing for Y2K Mod of Rod Worth Minimizer Sys.Region I Public Affairs Prepared to Respond to Media Inquiries ML20202J8241999-02-0101 February 1999 Notice of Violation from Insp on 981116-1204.Violation Noted:On 981204 There Were Two Instances Where PECO Had Failed to Properly Translate Design Info Into Procedures Used for safety-related Activities IR 05000277/19980091999-02-0101 February 1999 Insp Repts 50-277/98-09 & 50-278/98-09 on 981116-1204. Violations Noted.Major Areas Inspected:Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operating Conditions IR 05000277/19980111999-02-0101 February 1999 Insp Repts 50-277/98-11 & 50-278/98-11 on 981110-990104. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20202J5361999-01-29029 January 1999 Notice of Violation from Insp on 980309-1222.Violation Noted:Three Licensee Operators Failed to Successfully Complete Requalification Program for Facility for Which License Being Sought IR 05000277/19980121998-12-16016 December 1998 Insp Repts 50-277/98-12 & 50-278/98-12 on 981116-19.No Violations Noted.Major Areas Inspected:Emergency Preparedness full-participation Exercise Evaluation IR 05000277/19980101998-12-11011 December 1998 Insp Repts 50-277/98-10 & 50-278/98-10 on 980922-1109. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support ML20206N6821998-12-11011 December 1998 Notice of Violation from Insp on 980922-1109.Violation Noted:On 980810,chemistry Technicians Failed to Properly Perform Required Actions of Step 4.4.3 When D Detector, RIS-2-17-458D Went Downscale During Test ML20155F7571998-10-30030 October 1998 NRC Operator Licensing Exam Repts 50-277/98-301OL & 50-278/98-301(OL) (Including Completed & Graded Tests) for Exams Administered on 980914-22.All Applicants Passed Exam ML20155D4141998-10-28028 October 1998 Notice of Violation from Insp on 980811-0921.Violation Noted:Prior to 980912,PECO Failed to Properly Maintain Sys Operation Procedure 12.1.A-3,rev 19,resulting in Two RWCU Sys Events in August 1998 ML20155D4571998-10-28028 October 1998 Insp Repts 50-277/98-08 & 50-278/98-08 on 980811-0921. Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19980071998-09-15015 September 1998 Insp Repts 50-277/98-07 & 50-278/98-07 on 980623-0810.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000171/19980011998-08-0707 August 1998 Insp Rept 50-171/98-01 on 980612.No Violations Noted. Major Areas Inspected:Review of Facility Mgt & Control, Decommissioning Support Activities,Radiological Safety & Independent Measurements by Inspector ML20236R7661998-07-16016 July 1998 Insp Repts 50-277/98-06 & 50-278/98-06 on 980505-0622. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236R7511998-07-16016 July 1998 Notice of Violations from Insp on 980505-0622.Violations Noted:On 980515,inoperable B Channel Had Not Been Placed in Tripped Condition for Approx 28 H ML20249A4841998-06-11011 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:During Eecs Suction Strainer Replacement Mod in Oct 1997,licensee Did Not Establish Instructions & Procedures to Prevent Foreign Matl IR 05000277/19980021998-06-0909 June 1998 Insp Repts 50-277/98-02 & 50-278/98-02 on 980315-0504. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20249A0781998-06-0909 June 1998 Notice of Violation from Insp on 980315-0504.Violation Noted:Radiation Area Signs Were Not Visible Nor Conspicuous ML20237E6931998-06-0808 June 1998 EN-98-045:on 980611,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Two Violations Re Failure to Implement Adequate Foreign Matls Exclusion Program at Facility,Which Led to Debris ML20247L2791998-05-14014 May 1998 Notice of Violation from Insp on 980309-13 & 0330-0403. Violation Noted:From January 1998 to 980313,facility Licensee Administered Annual Operating Test to Operators in Manner That Sample Not Sufficiently Comprehensive IR 05000277/19970041998-05-14014 May 1998 Insp Repts 50-277/97-04 & 50-278/98-04 on 980309-13 & 0330-0403 (Onsite) & 980314-0429 (Inoffice).Violation Noted. Major Areas Inspected:Licensed Operator Requalification Training & Evaluation & Maint Rule Implementation Areas IR 05000278/19980051998-05-0707 May 1998 Insp Rept 50-278/98-05 on 980330-0424.Violations Noted. Major Areas Inspected:Events Re Discovery of Foreign Matl in 3A Core Spray Pump on 980324 IR 05000277/19980011998-05-0101 May 1998 Insp Repts 50-277/98-01 & 50-278/98-01 on 980118-0314. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20217P7281998-05-0101 May 1998 Notice of Violation from Insp on 980118-0314.Violation Noted:Nrc Identified That Control Room Supervisor Did Not Visually or Verbally Communicate Alarm Ack of an Expected Alarm That Come in on Unit 3 ML20217N3771998-03-30030 March 1998 Insp Rept 50-277/98-03 on 980212-0303.Violations Noted.Major Areas Inspected:Reviewed Events,Significance,Reportability & CAs for 2 'A' RFP Turbine High Level Trip Events Involving 3 1997 Failures & 1 Trip on 980206 ML20217N3651998-03-30030 March 1998 Notice of Violation from Insp on 980212-0303.Violation Noted:Nrc Identified That as of 980303,LER Had Not Been Submitted for Event of 970401,involving Condition Prohibited by TS Section 3.3.2.2 IR 05000277/19970091998-02-26026 February 1998 NRC Operator Licensing Exam Repts 50-277/97-09OL & 50-278/97-09OL Conducted on 970922-26.Exam Results:Two RO & Seven SRO Applicants Passed Exam.One SRO Applicant Failed Operating Portion of Exam ML20203E3701998-02-20020 February 1998 Insp Repts 50-277/97-08 & 50-278/97-08 on 971123-980117. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support ML20203E3601998-02-20020 February 1998 Notice of Violation from Insp on 971123-980117.Violation Noted:In Nov 1997,operations Personnel Did Not Fully Adhere to Routine Test Procedure RT-O-040-620-2,Rev 4, Outstanding HVAC & Outer Screen Insp for Winter Operation ML20197H0431997-12-16016 December 1997 Notice of Violation from Insp on 970921-1122.Violation Noted:Peco Did Not Properly Implement Written Procedures on Three Separate Occasions.Specifically,Between July 1997 & 0922,personnel Did Not Follow Instructions for Work Order IR 05000277/19970071997-12-16016 December 1997 Insp Repts 50-277/97-07 & 50-278/97-07 on 970921-1122. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19970061997-10-15015 October 1997 Insp Repts 50-277/97-06 & 50-278/97-06 on 970810-0920.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support ML20217A6461997-09-12012 September 1997 Notice of Violation from Insp on 970608-0809.Violation Noted:Licensee Did Not Properly Maintain Written Procedures for Bypass of MCR Ventilation Sys When Div 1 MCR Radiation Monitor Was Inoperable IR 05000277/19970051997-09-12012 September 1997 Insp Repts 50-277/97-05 & 50-278/97-05 on 970608-0809. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20149L2951997-07-24024 July 1997 Insp Repts 50-277/97-04 & 50-278/97-04 on 970504-0607. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20149L2911997-07-24024 July 1997 Notice of Violation from Insp on 970504-0607.Violation Noted:Between mid-1993 & Nov 1996,grand Master Keys That Could Be Used to Open Locked High Radiation Areas Not Maintained Under Administrative Control ML20149H1931997-07-17017 July 1997 SALP Repts 50-277/97-99 & 50-278/97-99 for 951015-970607 ML20140D2051997-06-0404 June 1997 Integrated Insp Repts 50-277/97-02 & 50-278/97-02 on 970308-0503.Violations Noted.Major Areas Inspected: Operations,Surveillance,Maint,Engineering,Technical Support & Plant Support ML20140D1841997-06-0404 June 1997 Notice of Violation from Insp on 970308-0503.Violation Noted:Between 970321-26,PECO Failed to Maintain Measures to Assure That Design Quality Std Deviations for safety-related Rhr,Hpci & HPSW Were Controlled IR 05000277/19970011997-04-14014 April 1997 Insp Repts 50-277/97-01 & 50-278/97-01 on 970112-0308.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support ML20138P2571997-02-10010 February 1997 Notice of Violation from Insp on 961208-970131.Violation Noted:From 960718-29,during Mod to Turbine Bldg,Licensee Did Not Assure That Turbine Bldg Atmosphere Exhausted Through Penetrations in Bldg Wall ML20138P2661997-02-10010 February 1997 Insp Repts 50-277/97-03 & 50-278/97-03 on 961209-970131. Violations Noted.Major Areas Inspected:Areas Involving Radiological Environ Monitoring Programs ML20134K2821997-02-0707 February 1997 Insp Repts 50-277/96-09 & 50-278/96-09 on 961110-970111.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20134F9051997-02-0303 February 1997 Notice of Violation from Insp on 960305 & 0506 & Between 1003 & 1127.Violation Noted:Electronic Copy of Limerick Physical Security Plan,Located on PECO Nuclear Local Area Network & Document Not Under Control 1999-08-04
[Table view] |
Text
- _ _ _ _ _ _ _ . _ _ . _ _ . _ . _ _ _ -
,
U.S. NUCLEAR REGULATORY COMMISSION REGION I i l
- i l
l
'
Docket No.: 50-171 .
i License No.: DPR-12 ,
l Report No.: 50-171/98-001 Ucensee: PECO Energy l i
Location: Peach Bottom Atomic Power Station Unit 1 Dek.. PA
- Date: June 12,1998 -
f1
}
l inspector:
c
. . lb 6/Ffy8 Anthony Djpdtriadis, Health Physicist Approved by: % b- O ~ 8 ~ 7'N Mark C. Roberts, Chief Decommissioning and Laboratory Branch
9808240225 980817 25 gDR ADOCK 05000171 PDR
_-.
c., -- , ,
i EXECUTIVE SUMMARY Peach Bottom Atomic Power Gtation Unit 1 NRC Inspection Report 50-171/98-001 '
This routine decommissioning inspection included a review of the facility management and control, decommissioning support activities, radiological safety, and independent measurements
.
by the inspecto Site History i
- ~ Peach Bottom Atomic Power Station Unit 1 was the first prototype high-temperature gas-
cooled reactor built in the United States. It began power operation in January 1967, and i- operated for seven years until October 31,1974. At that time, the plant ceased operations and the licensee initiated limited decommissioning activities. Peach Bottom Unit 1 is located
- about 80 miles southwest of Philadelphia on the west shore of the Susquehanna Rive There is no longer any nuclear fuel at the facilit ;
Facility Manaaement and Control i
The organizational structure and staffing levels of the facility appeared capable of conducting the decommissioning and surveillance activities currently in place. The Radiation Protection group conducts the nctual surveillance activities, which are reported to the Plant manage Decommissi'>nina Support Activities The licentee does not plan to decommission this Unit until the 2015 time frame. Some decomn'estioning work was done from 1974 through 1978 during shutdown and shipment of fuel. Cl rrent emphasis is on assuting that the site is free from structural deficiencies and
' that no .ibnormal conditions exist. The licensee has adequately characterized the boundaries of the atfected areas and took good precautions in identifying areas that were cleared of obvious lazard Radioloalcal Safety
. Radiological Safety Staffina The organizational structure and staffing levels of the facility appeared effective in ;
conducting the surveillance activities currently in place. Licensee management appears to be expending adequate resources on planning and execution of surveillance activitie .- Radiological Safety Audi+s.,
~
The licemee has a Nuclear Quality Assurance (NQA) program that is designed to audit v:- is aspects of radiation protection of the entire Peach Dottom Atomic Power ( Station.
!'
I
-_ -
__ _ _ _ _ _ - - _ _ _ _ _ _ _ _ - - _ . _ _ _ - _ _ _ - _ - _ _ - _ _ ____-_______
-, .,
i
!
.
Personnel Radiation Protection and Contamination Control l
'
The licensee provided good radiological controls for access to Unit 1 and all work in l the restricted and unrestricted areas. Licensee surveys of restricted and unrestricted
'
areas were performed in a vieil planned and organized manner. The inspection
- verified that the licensee uses properly calibrated radiation detection instrumentatio !
Personnel checked and maintained appropriate survey equipment. No safety L concems were identifie . As-Low-As-Reasonably-Achievable Proaram (ALARA)
The ALARA program is overseen by the ALARA Council which reviews and approves !
- objectives and action plans. The ALARA Council has met its dose goals and i adequate resources and capital expenditures have ensured success of the ALARA i concep l
. Radioactive Waste Manaaement
<
This inspection verified that the licensee does not generate any radioactive waste from this Uni . Postina and Labelina j
'
The licensee provided appropriate posting and labeling throughout the site in a manner that clearly informed all occupants of the hazard i l
IndeDondent Measurements independent radiological measurements made by the NRC inspector, confirmed
'
exposure-rates measured by the licensee. Smear samples collected by the inspector in clean L areas of the plant and analyzed in the Region i Analytical Laboratory indicated no removable
'
activit Within the scope of this inspection, no safety items or violations of NRC requirements were identified.
l' ,
i I
!
l l'
- - _ - - _ - - - - - - _ _ - - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _
,
l l
REPORT DETAILS l
Summary of Plant Activities ;
I The Peach Bottom, Unit i facility is presently in a SAFSTOR condition and final decommissioning will not occur until 2015 when the Peach Bottom Units 2 and 3 are l
tentatively scheduled for shutdown and decommissioning. The Unit i reactor is defueled and !
no fuel remains on site. Few radiological concems exist for the licensee. The facility has been shut down for over 24 years. Licensee management appears to be expending adequate resources on the execution of surveillance activitie j i Facility Management and Control Organization. Facility Manaaement and Control The inspector reviewed ongoing as well as planned future plant activities and discussed these activities with licensee representatives in order to assess overall facility management and controls. Specific events and findings are detailed in the sections belo l Inspection Scope (36801)
The inspector reviewed the licensee's systems for overall management and control of the decommissioning process. The licensee's organization, staffing, and qualifications were reviewed and evaluated to verify that licensing commitments were being me Observations and Findinas The organizational structure of Peach Bottom Atomic Power Station is headed by the Vice President, who has the overall responsibility of Unit The only radioactivity associated with the facility is contamination that resulted from the operating phase of the reactor. Because the majority of the contamination is sealed in the reactor vessel, the radiological issues at the Peach Bottom Unit i facility are relatively minor. The estimated total curie inventory is currently less than 30 Curie Discussions with members of the Experience Assessment team indicated that they were very knowledgeable in their subject areas. One of the team members had extensive operational work experience with the Peach Bottom Unit 1 facilit Conclusions The licensee's organization appeared to be effectively structured for planning and managing the adivities that contribute to the overall decommissioning of the facilit The presence of the staff member with Unit 1 institutional knowledge provides important background information (corporate memory). No concems were noted.
(
I
< _ _
_ _ - - - _ - _ . _ _ _ _ _ _ _ _ _ _ _ _ _
,
-
c.
L
!
1.2 Self-Assessment. Auditina and Corrective Actions Insoection' Scope (40801)
The licensee's controls for identifying, resolving and preventing issues that may
"
d(grade safety or. quality were examined, including self-assessments, auditing, and corrective action Observations and Findinos The inspector reviewed and discussed the licerisee's self-assessment audit program, otherwise known as the Nuclear Quality Assurance program, (NQA program), which
- includes activities occurring in the Unit 1 facility. The audit team typically covers l activities being conducted in Units 2 & 3, but an suds may review work being done in Unit 1. The audits are typically broad in scope and have addressed the major non-radiological aspects of the facility as weH as any radiological concems.
t i Conclusions l
L The licensee's self-assessment (NQA) program for Peach Bottom, including Unit 1, appears to be effective. No corrective actions or safety concems were identifie .3 Decommissioning Performance and Status Re_yiew at Permanently Shut Down Beactors Inspection Scope (71801)
The inspector toured the facility and evaluated the fire protection system.
- Observations and Findinql All areas were generally clean and well maintained for a facility that has been shut L down for 24 years. The areas were adequately posted and controlled. No combustible materials were observed. Fire protection is under the Peach Bottom Unit 2 program including fire extinguisher inspections and hydrant testing. There is no separate program for Peach Bottom External hydrants which are part of the Peach Bottom i general service water system are capable of providing water for fighting fires. PECO Energy has a Peach Bottom fire origade, made up of equipment operators who are trained in fire fighting. These individuals are ready to respond to the Peach Bottom Unit 1 facility in the event of a fire. Backup fire protection is available from the Delta Cardiff Fire Company, a local Volunteer Fire Compan Conclusions i
The licensee's fire protection program appeared well developed and established to meet the existing hazards at Peach Bottom Unit l
,
i L
I-
!
I Y____-__-____________ _-- _ _ _ _ _ - _ _ _ _ _ _ _
- _ _ _ _ __ _ -__- - - .__ - - _ _ _ _
l i
l Decommissioning Support Activities
- Maintenance and Su:veillance (82801)
Peach Bottom 1 is in SAFSTOR and therefore surveillance activities are conducted every 6 months. Surveillance is primarily focused on radiation protection issues and are discussed in Section .2 Cold weather Preparations (71714)
The inspector noted that the majority of the building areas in Unit 1 are unheate However, water is not present in the systems which could potentially freez ' Radiological Safety Radioloalcal Safety Staffino Insoection Scope (83750)
Staffing levels along with the organizational structure are described above in Section The inspector reviewed the licensee's system for overall management and control of
- 'the decommissioning process. The licensee's organization, staffing and qualifications were reviewed and discussed to verify that licensing commitments were being me Observations and Findinas
'
The Radiological Protection and Health Physics programs are managed by the Radiation Protection group, which reports directly to the Plant Manager. In addition, l' the Experience Assessment group also has responsibilities for Unit 1, and reports directly to the Plant Manager. The P! ant Manager reports to the Vice President of the ;
'
,
site. The Health Physics coverage is provided by the Peach Bottom 2 & 3 staff, which l' has an average of at least 10 years of experience in health physics and decommissioning. The staff is provided on-site health physics re-training.
p Etadioloaical Safety Audits Inspection Scope (83750)
The inspector discussed the licensee's Nuclear Quality Assurance (NQA) program and l its applicability to Unit 1 functions.
l l Qbagrvations and Findincs The Nuclear Quality Assurance program is an audit program designed to review and focus on all aspects of radiation protection at the entire Peach Bottom Atomic Power Station. While the audit is designed to focus on Peach Bottom 2 & 3, it also includes activities performed for Unit _
!, .
i j Personnel Radiation Protection Insoection Scope (83750)
l The inspector reviewed and discussed radiation exposure of workers.
l- Observations and Findinas i
All dosimetry is controlled through the PECO Energy Peach Bottom Units 2 & 3. The
' dosimetry program includes both thermoluminescent dosimeters (TLDs) and ;
direct-reading dosimeters, (DRDs). TLDs are issued quarterly and the program is NAVLAP certified. The dosimetry supplied to individuals entering Unit 1 is not l
differentiated from dosimetry issued for Units 2 & 3. However, on two separate i
occasions, the inspector toured Unit 1 with dosimetry dedicated for use for entry into i Unit 1. A review of the dosimetry results for the inspector and for Health Physics technicians performing the surveillance activiti 4 for the previous 12 months, revealed ;
that the dose received was O millire Based on the information gained during the inspection, the inspector concluded that
- the source term for the Peach Bottom Unit 1 facility is small. There appears to be l
'
good job planning, work practices and attention to the ALARA program. There was no i report or evidence of intemal exposures due to intakes of radioactive material during
' surveillance operations for the past yea .4 Surveys and Contamination Control Inspection Scope (83750)
The inspector reviewed select direct radiation surveys and wipe test results for the past twelve months. The inspector also performed general area dose rate measurements I and performed three wipe tests in selected locations to determine if any loose contamination was present. Independent measurements are covered in section 4.0 of this repor Observations and Findinas
!
Facility surveys had been performed every 6 months, as required by the Technical
'
- Specifications. A review of select records from the past 12 months indicated that area dose rates were less than 2 millirem per hour. Contamination levels were less than 1,000 disintegrations per minute (dpm) per 100 square centimeters of beta / gamma activit . All personnel leaving potentially contaminated areas were required to survey l themselves at the exit points using survey instruments brought into the area for this
'
purpose. The inspector observed individuals using the exit point survey instruments and performing exit surveys on themselves when exiting the restricted area. No problems or safety concems were noted.
i
- - _ _ _ - _ - _ _ _ . - . _ _ _ _ _ _ --
g .
-
.
!
, As Low As is Reasonably Achievable Proaram (?f. ARA) inspection Scope (8375j1 The inspect 7r reviewed the licensee's ALARA program as applied to this site, which is intended to limit radiation exposures to levels As Low As is Reasonably Achievable, Observations and Findinas The ALARA program is designed to be a program that applies to the entire Peach Bottom Atomic Power Station. The ALARA program is directly managed by the Station ALARA Council, which reviews and approves dose goals and action plans. It also monitors dose goal progress and assigns corrective actions, as needed. The Station ALARA Council also reviews and approves the allocation of resources and capital expenditures to ensure success of the site ALARA program. The Unit i program is not separated from the rest of the Units and is an integral part of the program established at Peach Bottom Units 2 & 3. A general Radiation Work Permit is used to perform work in Unit 1. This includes routine tours, surveillance, escorting, inspections, and minor equipment repair .6 Transportation and Radioactive Waste ' Insoection Scoce (86750).
The inspector toured the restricted area to determine if the licensee was storing radioactive waste in accordance with the regulation Observations and Findinas No radioactive waste was observed during the facility tour. A licensee representative stated that no radioactive waste had been generated since the last radioactive waste shipment in 197 Radiological Safety Conclusions The radiological safety program appeared to be effective in implementing the requirements set under the Technical Specifications in Appendix A to License N DPR-12. The semi-annual inspections are being carried out in accordance with the technical specifications. The staff are limiting their doses to minimal levels. There is
-
no radioactive wasta stored in Unit 1 and no material has been shipped from this Unit since 1978. There were tio safety concems identifie .0 Ir* dependent Measurements Inspection Scope The inspector acquired numerous independent measurements and thtue wipe samples te verify that the licensee's results are valid and reproducible
!
!
- , .
. Observations and findinas The inspector took gamma exposure rate measurements in the waste storage room ,
l and on the refueling floor. The measurements were made with a Ludlum Micro-R i
meter (NRC Serial No. 033515) calibrated to cesium-13 Background exposure rates were measured at three locations outside the restricted areas and ranged from 5 to 7 microroentgens per hour (pR/hr). Exposure rates in the i radioactive waste room and the refueling floor were also measured at this site. Typical exposure levels measured with thh instrument were 5-8 m!aoroentgens per hour (pR/hr). The wipe samples taken by the NRC showed no activit _Qonclualsns The general area exposure rates measured by the inspector were consistent with the licensee's measurements, i
-
5.0 Exit Meeting Summary The inspector presented the inspection results to members of licensee management at the conclusion of the inspection on June 12,1998, and during a telephone call on July 16,1998. The licensee acknowledged the findings presented. The licensee did not identify any of the documents reviewed by the inspector as proprietary.
!
I l
!
!
!
l 1 i
I
.
'. .
Partial List of Persons Contacted l
- Marlene Taylor, Physicist, Experience Assessment, PECO Energy George Lengye!, Manger, Experience Assessment, PECO Energy !
- Dennis Burgard, Experience Assessment, PECO Energy I
- Jerry Phillabaum, Licensing Engineer, PECO Energy ;
The asterisk denotes the individuals present at the Exit Meeting conducted on j June 12,191 l
!
j
..