NG-98-1244, Forwards Refueling Outage 15 ISI Summary Rept for Duane Arnold Energy Center.Rept Addresses Examinations Performed During Time Period from 961116-980522

From kanterella
Jump to navigation Jump to search
Forwards Refueling Outage 15 ISI Summary Rept for Duane Arnold Energy Center.Rept Addresses Examinations Performed During Time Period from 961116-980522
ML20236T856
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/15/1998
From: Peveler K
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20236T857 List:
References
NG-98-1244, NUDOCS 9807290083
Download: ML20236T856 (2)


Text

___ _ _- - . _ _ _ _ _ _ _ _ _ .

u.

g UTILITIESALLi ANT 1ts uusiue. loc.

  • ^" "'"

lES Utilities

$$",t>A Palo IA 52324 97H5 Office: 319.851.761i Fax: 319.831.79M -

www.alliant energyxom NG-98-1244 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn: Document Control Desk >

Mail Station 0-PI-17 Washington, DC 20555-0001

~

Subject:

Duane Arnold Energy Center Docket No: 50-331 Op. License No: DPR-49 Inservice Inspection Report File: A-107a, A-286a, B-31c, SpF-118 In accordance with the requirements of Paragraph IWA-6230 in Section XI of the ASME Boiler and Pressure Vessel Code and 10 CFR Section 50.55a(g), IES Utilities herewith submits the refueling outage (RFO) 15 inservice inspection summary report (Attaclunent 1).

This report addresses examinations which were performed at the Duane Arnold Energy Center (DAEC) during the time period from November 16,1996 through May 22,1998.

Attachment 2 provides information regarding augmented inservice inspections performed during RFO 15. These inspections include those performed for NUREG-0313, Revision 2, .

L " Technical Report on Material Selection and Processing Guidelines for BWR Coolant -

Pressure Boundary Piping," NUREG-0619, "BWR Feedwater Nozzle and Control Rod Drive

- Return Line Nozzle Cracking" and Bulletin 80-13," Cracking in Core Spray Spargers."

IES Utilities' review of the inspection reports has determined that all examined items are acceptable. These inspection reports are on file and are available for your review upon request.

L

\\

4, 1

_ [v,, J>" g[l 9907290083 990715 I E

PDR ADOCK 05000331 G PDR w._ _ _ _ _ _ _ . _ _ _ _ _ ._. . . - _ _ . . _ _ _ _ _ _ . _ _ _ . . -- _ _ . _ _ - - - - - -

[ July 15,1998 NG-98-1244 Page 2 Should you have any questions regarding this matter, please contact this office.

Sincerely, 8 4 l Kenneth E. Peveler f

Manager, Regulatory Performance Attachments: 1). ASME Section XI Summary Report j Duane Arnold Energy Center Refueling Outage 15 l 2) Augmented Inspection Results RFO 15 cc: C. Rushworth (w/o)

E. Protsch (w/o)

J. Franz (w/o) .

' D. Wilson (w/o)

R. Lat'fer (NRC-NRR)

C. Paperiello (Region III)  !

L NRC Resident Office c-ANII(w/o)

.'DOCU 1

i i.

l l.

t-

_ _ _ . - - _ . _ _ _ - - _ _ - _ _ _ _ _ _ _ _ - - - . _ _ - - -