MONTHYEARML20217N5521999-10-21021 October 1999 Forwards Operator Licensing Exam Rept 50-331/99-302(OL) for Tests Administered During Wk of 990920.Six Applicants Passed All Sections of Exam & Were Issued Operating Licenses ML20217H8921999-10-18018 October 1999 Forwards SER Accepting Eight of Licensee Relief Requests, NDE-R001,(Part a & B),NDE-R027,NDE-R028,NDE-R029,NDE-R030, NDE-R032 & NDE-R035,one Request Relief NDE-R036,denied & Relief Request NDE-R034 Unnecessary ML20217F4801999-10-14014 October 1999 Provides Individual Exam Results for Applicants Who Took Sept 1999 Initial License Exam.Informs That Info Considered Proprietary & That Listed Info,Supplements & Exam Rept Will Be Issued Shortly NG-99-1405, Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request1999-10-0808 October 1999 Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request NG-99-1383, Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs1999-10-0808 October 1999 Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs ML20217F7221999-10-0707 October 1999 Forwards Insp Rept 50-331/99-11 on 990820-0930.No Violations Noted ML20212L0411999-10-0505 October 1999 Informs That Privacy Info Identified in Util Re Duane Arnold Energy Center Emergency Telephone Book,Rev 61 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(a)(6) & Section 103(b) of Atomic Energy Act NG-99-1358, Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included1999-10-0505 October 1999 Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included NG-99-1378, Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 9910221999-10-0404 October 1999 Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022 NG-99-1327, Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval1999-10-0404 October 1999 Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval ML20212J8761999-09-30030 September 1999 Forwards RAI Re Util 990412 Request to Revise Duane Arnold Energy Ctr TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months ML20217A9331999-09-30030 September 1999 Informs That NRC Plan to Conduct Addl Insp by Resident Inspectors Beyond Core Insp Program Over Next 7 Months to Assess Preparation for Implementation of Refuel Outage Activities.Historical Listing of Plant Issues Encl ML20212H2121999-09-27027 September 1999 Forwards Request for Addl Info Re 990412 Licensee Request to Revise DAEC TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months ML20212H2151999-09-22022 September 1999 Forwards Amend 228 to License DPR-49 & Safety Evaluation. Amend Revises DAEC TS SR 3.4.3.1, Safety/Relief Valves & Safety Valves NG-99-1262, Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6)1999-09-20020 September 1999 Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6) NG-99-1214, Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 20031999-09-15015 September 1999 Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 2003 NG-99-1278, Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H1999-09-15015 September 1999 Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H ML20212A8711999-09-14014 September 1999 Informs That 990716 Application Which Submitted Affidavit & Attachment Re Addl Info Re Cycle Specific SLMCPR for Plant Cycle 17, June 1999,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) NG-99-1249, Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC1999-09-10010 September 1999 Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC NG-99-1252, Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations1999-09-0909 September 1999 Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations NG-99-1192, Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity1999-09-0808 September 1999 Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20211M5621999-09-0202 September 1999 Forwards Insp Rept 50-331/99-08 on 990712-16 & 0810-12.No Violations Noted.Insp Consisted of Review of Source Term Reduction & Integration of ALARA Into Work Planning & Execution,Calibration & Maint NG-99-1216, Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible1999-09-0101 September 1999 Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible NG-99-1182, Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6)1999-08-31031 August 1999 Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6) ML20211M5811999-08-31031 August 1999 Forwards Proprietary Version of Rev 61 to DAEC Emergency Telephone Book. Proprietary Encl Withheld NG-99-1205, Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-06301999-08-30030 August 1999 Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-0630 ML20211F7831999-08-26026 August 1999 Forwards Insp Rept 50-331/99-09 on 990708-0819.Violation Re Failure to Log Entry Into TS Limiting Condition for Operation When Power Lost to Drywell Sump Pump Level Switches,Noted & Being Treated as NCV ML20210V1231999-08-17017 August 1999 Forwards Insp Rept 50-331/99-10 on 990802-06.No Violations Noted.Insp Examined Activities Conducted Under Emergency Preparedness Program ML20211A8731999-08-16016 August 1999 Ack Receipt of 990212 & 0402 Ltrs,Which Transmitted Changes Identified as Revs 39 & 40 to DAEC Security Plan,Submitted Under Provisions of 10CFR50.54(p).NRC Review Comments for Subject Plans,Encl NG-99-1146, Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 19991999-08-16016 August 1999 Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999 NG-99-1126, Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 19991999-08-13013 August 1999 Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 1999 NG-99-1050, Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable1999-07-28028 July 1999 Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable ML20210L8311999-07-27027 July 1999 Forwards Insp Rept 50-331/99-05 on 990601-0701.Violations Noted.Insp Included Assessment & Evaluation of Engineering Support,Design Change & Mod Activities Including 10CFR50.59 Safety Evaluations,Applicability Reviews & C/As ML20210E9781999-07-26026 July 1999 Informs That Info Submitted by Ltr (Nep 99-0067), Ies Utilities,Inc,Will Be Withheld from Public Disclosure, Per 10CFR2.790(a)(6) ML20210E1431999-07-22022 July 1999 Provides Summary of 990715 Meeting with Alliant Utilities & Duane Arnold Energy Ctr Mgt Re Recent Plant Performance Review Issued by NRC for Duane Arnold Energy Ctr.Associated Meeting Summary & Alliant Utilities Meeting Handout Encl NG-99-0993, Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a)1999-07-21021 July 1999 Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a) ML20210B7161999-07-20020 July 1999 Forwards Audit Rept on Y2K Contingency Planning Program at Duane Arnold Energy Center Conducted on 990615-16 as follow-up to NRC GL 98-01 ML20210B5271999-07-16016 July 1999 Forwards Insp Rept 50-331/99-07 on 990526-0707.Two Violations Being Treated as Noncited Violations NG-99-0989, Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-16016 July 1999 Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20209E8401999-07-13013 July 1999 Discusses Completion of NRC GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps for Plant NG-99-0990, Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.7901999-07-13013 July 1999 Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.790 ML20209G4991999-07-12012 July 1999 Forwards Insp Rept 50-331/98-05 on 990622-24.No Violations Noted ML20207H6741999-07-0606 July 1999 Forwards Operating Licensing Exam Rept 50-331/99-301(OL) on 990525.Staff Administered Written Exam to One Reactor Operator Applicant Previously Demonstrating Unsatisfactory Results During Jul 1998 Exam NG-99-0928, Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-041999-07-0101 July 1999 Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-04 NG-99-0859, Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl1999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl ML20212J4521999-06-25025 June 1999 Discusses Closure of TAC MA1188 Re Response to RAI to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity NG-99-0880, Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests1999-06-23023 June 1999 Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests ML20196F9531999-06-21021 June 1999 Forwards Proprietary Rev 60 to Duane Arnold Energy Center Emergency Telephone Book.Proprietary Info Withheld ML20196A1431999-06-18018 June 1999 Confirms Discussion Between Members of Staffs to Have Meeting on 990715 at Training Ctr at Duane Arnold Energy Ctr to Discuss Results of Plant Performance Review Process ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNG-99-1383, Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs1999-10-0808 October 1999 Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs NG-99-1405, Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request1999-10-0808 October 1999 Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request NG-99-1358, Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included1999-10-0505 October 1999 Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included NG-99-1327, Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval1999-10-0404 October 1999 Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval NG-99-1378, Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 9910221999-10-0404 October 1999 Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022 NG-99-1262, Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6)1999-09-20020 September 1999 Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6) NG-99-1278, Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H1999-09-15015 September 1999 Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H NG-99-1214, Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 20031999-09-15015 September 1999 Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 2003 NG-99-1249, Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC1999-09-10010 September 1999 Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC NG-99-1252, Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations1999-09-0909 September 1999 Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations NG-99-1192, Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity1999-09-0808 September 1999 Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity NG-99-1216, Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible1999-09-0101 September 1999 Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible ML20211M5811999-08-31031 August 1999 Forwards Proprietary Version of Rev 61 to DAEC Emergency Telephone Book. Proprietary Encl Withheld NG-99-1182, Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6)1999-08-31031 August 1999 Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6) NG-99-1205, Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-06301999-08-30030 August 1999 Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-0630 NG-99-1146, Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 19991999-08-16016 August 1999 Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999 NG-99-1126, Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 19991999-08-13013 August 1999 Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 1999 NG-99-1050, Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable1999-07-28028 July 1999 Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable NG-99-0993, Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a)1999-07-21021 July 1999 Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a) NG-99-0989, Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-16016 July 1999 Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates NG-99-0990, Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.7901999-07-13013 July 1999 Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.790 NG-99-0928, Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-041999-07-0101 July 1999 Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-04 NG-99-0859, Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl1999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl NG-99-0880, Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests1999-06-23023 June 1999 Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests ML20196F9531999-06-21021 June 1999 Forwards Proprietary Rev 60 to Duane Arnold Energy Center Emergency Telephone Book.Proprietary Info Withheld NG-99-0468, Informs That There Have Been No Changes in Organizational Structure or Ownership from That Previously Submitted in .Ies Util Remains Owner & Operator of Duane Arnold Energy Center1999-06-0303 June 1999 Informs That There Have Been No Changes in Organizational Structure or Ownership from That Previously Submitted in .Ies Util Remains Owner & Operator of Duane Arnold Energy Center NG-99-0625, Informs NRC That SRO License for B Westcot & SRO License SOP 30772 for T Zimmerman Should Be Modified to Require Corrective Lenses for Near & Distant Vision While Performing Licensed Duties.Nrc Forms 396,withheld,per 10CFR2.790(a)(b)1999-05-24024 May 1999 Informs NRC That SRO License for B Westcot & SRO License SOP 30772 for T Zimmerman Should Be Modified to Require Corrective Lenses for Near & Distant Vision While Performing Licensed Duties.Nrc Forms 396,withheld,per 10CFR2.790(a)(b) NG-99-0741, Forwards Remaining Validated Exam Matls for Initial License Exam to Be Administered at Licensee Facility Week of 990524. Exam Matls Should Be Withheld from Public Disclosure Until After Exam Completed1999-05-19019 May 1999 Forwards Remaining Validated Exam Matls for Initial License Exam to Be Administered at Licensee Facility Week of 990524. Exam Matls Should Be Withheld from Public Disclosure Until After Exam Completed NG-99-0700, Forwards License Renewal Applications for SA Brewer OP-30975,EE Harrison SOP-31293 & SD Kottenstette SOP-31294. Encls Withheld Per 10CFR2.790(a)(6)1999-05-17017 May 1999 Forwards License Renewal Applications for SA Brewer OP-30975,EE Harrison SOP-31293 & SD Kottenstette SOP-31294. Encls Withheld Per 10CFR2.790(a)(6) ML20206S7951999-05-11011 May 1999 Informs That Temporary Addendum to DAEC Security Plan Is No Longer Required & Should Be Removed.Addendum Was Transmitted to NRC in 981015 Licensee Ltr NG-99-0664, Forwards Certified Application Re Reactor Operator License Reapplication IAW Provisions of Examiner Standard (ES)-201 for Ma Ruchko.Examination Is Scheduled for 990525.Encl Withheld Per 10CFR2.7901999-05-10010 May 1999 Forwards Certified Application Re Reactor Operator License Reapplication IAW Provisions of Examiner Standard (ES)-201 for Ma Ruchko.Examination Is Scheduled for 990525.Encl Withheld Per 10CFR2.790 NG-99-0636, Forwards Radiological Environ Monitoring Program (REMP) for DAEC for Jan-Dec 1998, IAW TS Section 5.6.2 Reporting Requirements1999-04-29029 April 1999 Forwards Radiological Environ Monitoring Program (REMP) for DAEC for Jan-Dec 1998, IAW TS Section 5.6.2 Reporting Requirements NG-99-0633, Forwards DAEC 1998 Annual Radioactive Matls Release Rept for Jan-Dec 1998. Rept Satisfies Requirements for Annual Radioactive Matl Release Rept,As Stated in Section 5.6.3 of Tech Specs1999-04-29029 April 1999 Forwards DAEC 1998 Annual Radioactive Matls Release Rept for Jan-Dec 1998. Rept Satisfies Requirements for Annual Radioactive Matl Release Rept,As Stated in Section 5.6.3 of Tech Specs NG-99-0622, Forwards Validated Exam Matls for Initial License Exam to Be Administered During Week of 990524,per NUREG-1021.Without Encl1999-04-28028 April 1999 Forwards Validated Exam Matls for Initial License Exam to Be Administered During Week of 990524,per NUREG-1021.Without Encl NG-99-0605, Forwards Response to NRC Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Duane Arnold Energy Center1999-04-28028 April 1999 Forwards Response to NRC Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Duane Arnold Energy Center NG-99-0493, Forwards non-certified Application Re Reactor License Reapplication in Accordance with Provisions of Examiner Std (ES)-201 for Ma Ruchko.Nrc License Exam Scheduled for 990525.Without Encl1999-04-19019 April 1999 Forwards non-certified Application Re Reactor License Reapplication in Accordance with Provisions of Examiner Std (ES)-201 for Ma Ruchko.Nrc License Exam Scheduled for 990525.Without Encl NG-99-0495, Informs NRC That RW Pfeil Did Not Take BWR Generic Fundamentals Exam Section of Written Operator Licensing Exam Administered on 990407.R Pfeil Is No Longer Enrolled in DAEC Operator Licensing Training Program1999-04-19019 April 1999 Informs NRC That RW Pfeil Did Not Take BWR Generic Fundamentals Exam Section of Written Operator Licensing Exam Administered on 990407.R Pfeil Is No Longer Enrolled in DAEC Operator Licensing Training Program NG-99-0529, Forwards Outline of Exam to Be Given Week of 990524 as Requested in Telcon with G Thullen & Requests Exam Matls Be Withheld from Public Disclosure Until After Exam Completed on 9905281999-04-0808 April 1999 Forwards Outline of Exam to Be Given Week of 990524 as Requested in Telcon with G Thullen & Requests Exam Matls Be Withheld from Public Disclosure Until After Exam Completed on 990528 ML20205M2471999-04-0202 April 1999 Transmits Change 40 to DAEC Security Plan,Per Requirements of 10CFR50.54(p).Changes Are Intended to Enhance Capability of Onsite Security Force to Defend Against Design Basis Threat.Plan Withheld,Per 10CFR73.21 NG-99-0491, Requests Relief from Noted Requirements,For Relief Requests MC-R002 Through MC-R006,MC-P001 & NDE-R015,rev 1.Approval Is Requested Prior to Refueling Outage 16,scheduled to Begin on 9910081999-04-0202 April 1999 Requests Relief from Noted Requirements,For Relief Requests MC-R002 Through MC-R006,MC-P001 & NDE-R015,rev 1.Approval Is Requested Prior to Refueling Outage 16,scheduled to Begin on 991008 NG-99-0281, Forwards Decommissioning Funding Rept for Daec,Iaw 10CFR50.75(f)(1).Rept Is Being Submitted by DAEC Joint Owners Ies Utilities,Inc,Central IA Power Cooperative & Corn Belt Cooperative1999-03-31031 March 1999 Forwards Decommissioning Funding Rept for Daec,Iaw 10CFR50.75(f)(1).Rept Is Being Submitted by DAEC Joint Owners Ies Utilities,Inc,Central IA Power Cooperative & Corn Belt Cooperative NG-99-0273, Forwards 1999 DAEC Simulator Certification Rept, Per 10CFR55.45 Every Four Years on Anniversary of Certification. Required Info Contained in Attachments 1-71999-03-24024 March 1999 Forwards 1999 DAEC Simulator Certification Rept, Per 10CFR55.45 Every Four Years on Anniversary of Certification. Required Info Contained in Attachments 1-7 ML20207L8351999-03-10010 March 1999 Forwards Proprietary Rev 59A to Deac Emergency Telephone Book & non-proprietary Rev 20 to Section H of DAEC Emergency Plan, IAW 10CFR50,App E.Proprietary Info Withheld NRC-99-0300, Forwards Rev 15 to Pump & Valve IST Program for Daec1999-03-0101 March 1999 Forwards Rev 15 to Pump & Valve IST Program for Daec NG-99-0302, Forwards Fitness for Duty Program Performance for DAEC During Six Month Period Jul-Dec 1998 in Accordance with 10CFR26.71(d)1999-02-28028 February 1999 Forwards Fitness for Duty Program Performance for DAEC During Six Month Period Jul-Dec 1998 in Accordance with 10CFR26.71(d) ML20203G3041999-02-12012 February 1999 Informs of Rev to Security Plan for DAEC to Improve Flexibility in Deployment of Members of Security Force. Security Plan Change 39,reflecting Changes,Encl.Encl Withheld NG-99-0115, Submits Request for Enforcement Discretion to Tech Spec Surveillance Requirement 3.8.1.7 for Edgs.Listed New Commitment Being Made by Ltr1999-01-21021 January 1999 Submits Request for Enforcement Discretion to Tech Spec Surveillance Requirement 3.8.1.7 for Edgs.Listed New Commitment Being Made by Ltr ML20206S1691999-01-18018 January 1999 Forwards Proprietary Rev 59 to DAEC Emergency Telephone Book. Proprietary Encl Withheld NG-98-2102, Informs That Util Completed Commitment to Assess & Implement Severe Accident Mgt Guidelines at Daec,Based Upon Generic Guidelines Developed by BWROG1998-12-31031 December 1998 Informs That Util Completed Commitment to Assess & Implement Severe Accident Mgt Guidelines at Daec,Based Upon Generic Guidelines Developed by BWROG NG-98-2059, Provides Response to NRC Request for Background Summary of TS Change (TSCR-006), Revise TS 3.6.1.3 Condition E & Add TS for Control Bldg/Standby Gas Treatment (Cb/Sbgt) Instrument Air Sys1998-12-21021 December 1998 Provides Response to NRC Request for Background Summary of TS Change (TSCR-006), Revise TS 3.6.1.3 Condition E & Add TS for Control Bldg/Standby Gas Treatment (Cb/Sbgt) Instrument Air Sys 1999-09-09
[Table view] |
Text
'
i l . m t
H
.- J UTILITIES INC.
John F. Franz, Jr.
Vice President, Nuclear September 15,1994 ,
NG-94-3144 l hir. William T. Russell, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station PI-137 Washington, DC 20555
Subject:
Duane Arnold Energy Center Docket No: 50-331 Op. License No: DPR-49 Relief Request for CV 4421, "D" Outboard MSIV, RR-002, Revision 2 l
l
References:
- 1) Letter from J. Franz (IES) to T. Murley (NRC) dated l September 18,1993 (NG-93-4013) l
- 2) NRC Safety Evaluation for RR-002, Revision 1, dated September 24,1993 File: A-100, A-286, B-21, N-11
Dear Mr. Russell:
During refueling outage (RFO) 12, a non-Code repair was performed on the "D" outboard main steam isolation valve (MSIV) body. We requested (Reference 1) and were subsequently granted (Reference 2) relief from Code requirements for this repair on the condition that we perform radiographic examinations (RTs) on the valve body during the next two RFOs. We have reviewed the basis for this relief and propose to modify the examination schedule. One RT would be performed in either RFO 13 or RFO 14, and another RT would be performed in either RFO 15 or RFO 16, with the interval between RTs not to exceed two cycles.
The basis for this revised schedule is discussed in Attachment 1. The revised relief request, RR-002, revision 2, is provided as Attachment 2.
c c. - - -
l 9409290148 940915 )
PDR ADOCK 05000331 37}
p PDR ;qU t General O'fice
- 319/398-4411 An IES INDUSTRIES Company
1 M,r. William T. Russell September 15,1994 NG-94-3144 Page 2 i
! Should you have any additional questions or concerns regarding this submittal, please contact this omce.
1 Vey truly yours, C '
John F. Franz Vice President, Nuclear JFF/CJR/pjv~
Attachments: 1) Supporting Information for Relief Request RR-002, Revision 2
- 2) Relief Request RR-002, Revision 2
, cc: C. Rushworth l L. Liu L. Root i R. Pulsifer (NRC-NRR)
J. Martin (Region III)
NRC Resident 05ce !
Docu l
l i
I l
l
[
Attachment I to NG-94-3144 ,
Page1of5 SUPPORTING INFORhiATION FOR RELIEF REQUEST RR-002, REVISION 2 BACKGROUND:
In September 1993, relief was requested for indications on the upper bore of the 'D' outboard main steam isolation valve (MSIV), CV 4421 (Reference 1). This request was required since a Code repair would require post weld heat treatment, which is undesirable since excessive valve l
body distortion may occur and degrade the valve performance. Information was provided to demonstrate the acceptability of the repair technique used and the condition of the indications as-left. A fatigue crack growth analysis was also performed,in accordance with ASME Section XI, to demonstrate that growth of the indication by fatigue will not significantly impact the structural integrity of the MSIV body over the remaining service lifetime.
Relief was granted by the NRC Staff on the condition that a radiographic inspection of the MSIV body is accomplished during each of the next two scheduled refueling outages (RFOs) to ensure adequate structural integrity of the non-Code repair (Reference 2).
DESCRIPTION OF CONCERN:
Although radiographic inspection of the MSIV body to ensure adequate structural integrity of the non-Code repair is prudent, the schedule provided for these inspections in Reference 2 may not be appropriate.
l l This is based on reviews performed in the following areas:
l 1) The susceptibility of the indications to grow,
- 2) The welding technique used to perform the repair,
- 3) The inspection techniques required to perform the radiography, l 4) The potential impact of valve disassembly, and
- 5) The ASME Code precedent for performing Section XI valve internal inspections only when disassembly occurs for maintenance.
Based on these reviews, IES Utilities Inc. proposes to revise the schedule for the radiographic inspections. A radiographic examination of the "D" outboard MSIV would be performed once during either RFO 13 or RFO 14, and once during either RFO 15 or RFO 16, with the interval between RTs not to exceed 2 cycles.
SUSCEPTIBILITY OF THE INDICATIONS TO GROW:
The probability of propagation of existing indications has been evaluated. We have concluded that the existing indications in the repaired area are acceptable and propagation is very unlikely based on the following.
4 l .' .
Attachment 1 i to NG-94-3144 j Page 2 of 5 i
I 1 After the weld repair, radiographs of the repaired area were compared with reference radiographs l and construction radiographs. This comparison showed that the valve meets construction j requirements and provided confirmation that the existing defects did not increase in size during j the repair process; no new indications occurred. The radiographs of the repaired area also j showed that CV4421 met the requirement of ASME Section XI paragraph IWB-3518 to be used i inservice with acceptable internal defects and no defect open to the surface.
1 4
j The probability for propagation of shdnkage defects to grow or cracking to occur is highly t unlikely because of several factors:
{
- SA216 WCB is a mild carbon steel with very ductile properties (22 -33% elongation) and
] is not crack sensitive.
1 i - In order for a crack to grow, there must be associated stresses.
1 j - This valve was stress relieved after casting. The stresses due to repair welding are insignificant due to the welding techniques utilized (discussed below).
The minimum wall thickness by design in the area where the indications exist is j 1.29" and the actual wall thickness is 3.175" The actual thickness is significantly j more than required by design, consequently, the applied stresses are very low.
I i An analytical flaw evaluation was performed in accordance with ASME Section XI, IWB-3600 l requirements. This analysis demonstrates that the flaws in the MSIV body are bounded by the
- postulated initial flaw geometries and were within the ASME Section XI, IWB-3612 requirements j for normal and faulted conditions. The fatigue crack growth analysis demonstrates that growth by
] fatigue will not significantly impact the integrity of the MSIV body over the remaining service i lifetime.
l J
} The analysis and reviews performed indicate that radiographic inspection to ensure adequate j structural int grity of the non-Code repair is not urgent. Disassembly based on projected j structural integrity failure is not warranted.
1 k WELDING TECHNIOUE USED TO PERFORM THE REPAIR:
1 i
j The welding technique used to perform the repair was selected to minimize the stresses associated i with the welding process, to prevent the deposition of casting impurities, and to eliminate the
) introduction of hydrogen which could lead to delayed cracking.
i
< 1
4 1
- Attachment I to NG-94-3144 Page 3 of 5 i
l The welding technique used compares favorably with the temperbead welding technique.
The Shielded Metal Arc Welding (SMAW) process was used for weld repairs because the fluxing action of the electrodes allows the casting impurities to be deposited as slag which was removed after each pass.
I The welding electrode used to make the repair had been stored in a holding oven over 8 months at a temperature of 350 degrees. This time / temperature would be sufficient to bake out any existing hydrogen; therefore, it is not credible that these electrodes would contain enough hydrogen to attribute to delayed cracking. l E7018 welding electrodes of 3/32" diameter were used, and the first layer was ground to remove the crown before the next layer was deposited.
Magnetic Particle inspection (MT) was performed on each layer.
INSPECTION TECHNIOUES:
Possible techniques for inspecting the repair area without valve disassembly have been considered.
These include radiographic inspection through two walls, radiographic inspection using an inserted source, and ultrasonic inspection.
1 1
Radiographic inspection through two walls would require a radioactive source strong enough to penetrate the upper valve bore at the indication locati and opposite that location.
The valve configuration is such that about half of the repair area would be covered by the piston l with the valve in the closed position or by the disk in the full open position. The source would then have to penetrate about 22" of metal. With the valve in an intermediate position, the source would have to penetrate about 14" of metal, including 8" for the neck of the disk / piston assembly. i Standard industrial radiographic inspection sources, such as Iridium 192 and Cobalt 60, have practical thickness limits well below the minimum metal penetration thickness of 14" (Cobalt 60 ;
has a practical thickness limit of 9"). Special radiographic inspection sources are impractical due to equipment size and steam tunnel space limitations. In all configurations, discrimination of this indication would be very difficult and unreliable with the valve assembled.
Radiographic inspection using an inserted source would require insertion of the source into the test connection, through a 90 degree elbow, through three globe valves, into the MSIV above the seat, around the disk and into the area between the disk and piston with the valve in an intermediate position. The source size and guide tube flexibility would not be available for this torturous path. In addition, there would be a high risk of the source becoming lodged in the valve.
I
~
\
i Attachinent I to NG-94-3144 Page 4 of 5 Ultrasonic inspections from the external surface could be performed. However, due to the grain structure of the casting and the wall thickness of the material, this type of examination may not provide an accurate sizing of the indication.
1 These techniques, as well as other possible techniques, have been discussed with several industry experts with similar conclusions. Externalinspection is not practical, In order to perform a meaningful inspection, the valve must be disassembled.
i POTENTIAL IMPACT OF VALVE DISASSEMBLY:
1 NUREG 1169, " Resolution of Generic Issue C An Evaluation of BWR MSIV Leakage and !
the Effectiveness of Leakage Treatment Methods," includes the following technical findings in '
section 6.1.
" ..By not having to open the valves and refurbish them for minor leakage, the utility may have avoided introducing the root causes ofrecurrent leakage problems. Industry ;
experience suggests that by attempting to maintain these large, fast-acting valves to such a l stringent leakage specification, utilities have conducted numerous disassembly and refurbishment operations on valves that have no substantive defects. By attempting to correct nonexistent or minimal defects in the valves under less-than-optimum field maintenance conditions, it is likely that some actual defects have been introduced that led to later leak test failures."
Although this finding is associated with leakage problems, it would be applicable to disassemblies l performed for other reasons, such as for inspections. Disassembly of the MSIV solely to perform l radiographic inspections could be detrimental to future MSIV performance.
l l The findings of NUREG 1169 are consistent with the findings of the Boiling Water Reactor i Owners' Group (BWROG) as identified in the MSIV Leakage Closure Committee Report, l NEDC-31858P, "BWROG Report for Increasing MSIV Leakage Rate Limits and Elimination of I Leakage Control Systems." Section 5.1 of this report summarizes the benefits associated with increasing the leakage rate limits and thus avoiding excessive disassembly. These benefits would also be applicable to maintenance performed for other reasons, such as for inspection. These benefits include:
- 1. An average savings of 350 man-hours.
- 2. A dose savings to personnel of one to two rem whole body.
- 3. An average labor cost savings to repair / refurbish an MSIV of $31,500.
- 4. A possible increase in plant availability as MSIV repair often extends outage length.
- 5. An increase in the service life of the MSIV seating surfaces, as machining on the seating surfaces is avoided.
I At.tachbient I to NG-94-3144 Page 5 of 5 i
These findings indicate that valve disassembly for reasons other than excessive leakage may be l detrimental to the valve and can be a significant cost, dose, and schedule penalty.
PRECEDENT FOR PERFORMING VALVE INTERNAL INSPECTIONS:
Precedent has been established for performing valve internal inspections only when valves are disassembled for maintenance.
ASME Section XI,1986 Code,1988 Addenda, Table IWB-2500-1, item B12.50 requires visual (VT3) examination of the internal surfaces of a valve body exceeding 4" only if the valve is disassembled for maintenance.
IES has an approved relief request (NDE-002) based on the above Code requirements. The relief request is approved for use at the DAEC during the second ten year interval.
CONCLUSIONS:
The schedule for the radiographic inspection of the "D" outboard MSIV should be revised. IES Utilities Inc. proposes to perform radiographic inspections of the repair area once during either RFO 13 or RFO 14, and once during either RFO 15 or RFO 16, with the interval between RTs l not to exceed 2 cycles. ,
l i l The basis for this revised schedule is-l I
- 1. The analysis and reviews performed indicate that radiographic inspection to ensure j adequate structural integrity is not urgent.
l 2. The weld technique used to perform the repair was selected to minimize the l potential for crack growth.
l
- 3. External ultrasonic inspections may not provide an accurate sizing of the ;
indication. Performance of the radiographic examination by other than valve disassembly is not practical.
- 4. Disassembly of the valve for reasons other than excessive leakage may be detrimental to the valve and can be a significant cost, dose, and schedule penalty.
- 5. The precedent exists for performing valve internal inspections only when the valve is disassembled for other reasons.
,. - .. . .. - . . . . _ , - - - . ~ . - - . . - - - - -. . -- -. _. ..
\
l
=
l J
Attachment 2 to NG-94-3144 Page1of1 IES UT'LITIES INC.
DUANE ARNOLD ENERGY CENTER MAJOR ITEM: REQUEST FOR RELIEF NUMBER RR-002, REV. 2 TEN YEAR EXAMINATION
SUMMARY
TABLE: SECTION 7.0 & 8.0 ASAE SECTION XI SYSTEMS - PAGE 1OF1 REQUEST FOR RELIEF CEDAR RAPIDS, IA COMPONEbfr OR SYSTEM ASNE XI CODE CLASS PROGRAM TABLE CODE CATEGORY CODE ITEM MAINsTEAM ISOLATION VALVE I N/A N/A N/A "D" OUTBOARD, CV-4421 CODE REOUIREMENTS IWA-4120 " REPAIRS SHALL BE PERFORMED IN ACCORDANCE WITil THE OWNER'S DESIGN SPECIFICATION AND CONSTRUCTION CODE OF THE COMPONENT OR SYSTEM". TIE MATERIAL SPEC. (ASTM A216 GR. WCB) REQUIRES THE REMOVAL OF UNACCEPTABLE DEFECTS PRIOR TO PERFORMING ANY WELD REPAIRS. ALSO CASTINGS CONTAINING ANY REPAIR WELD THAT EXCEEDS 20% OF WALL THICKNESS OR 1" WHICIEVER IS SMALLER OR WHICH EXCEEDS 10 IN' AREA SHALL BE STRESS PELIEVED AFTER WELDING. TIE GE PURCHASE SPEC. 21 A9230 REQUIRES WELD REPAIRS ON CASTINGS TO BE EXAMINED BY MAGNETIC PARTICLE (MT) OR LIQUID PENETRANT (PT) METHODS AND REPAIR WELDS OF DEFITI GREATER TilAN 10% OF TIE WALL THICKNESS TO BE EXAMINED BY RADIOGRAPHY (RT).
BASIS FOR RELIEF TIE SPECIFICATIONS FOR TIE MSIVs REQUIRE AN MT OR FT EXAMINATION ON ALL MACHINED SURFACES. DURING REPAIR MACHINING OF TIE D OUTBOARD MSIV, UNACCEPTABLE LINEAR INDICATIONS WERE DISCOVERED ON TIE MT EXAM. TIESE INDICATIONS WERE COMPARED TO TIE ORIGINAL RADIOGRAPHS AND DETERMINED TO BE SHRINKAGE DEFECTS FROM THE CASTING PROCESS. FURTIER GRINDING WAS PERFORhED TO A DEPTlI OF 0.593 IN (CLOSE TO THE LIMIT FOR STRESS RELIEVING) AND THREE UNACCEPTABLE INDICATIONS IN GROUND AREA WERE FOUND ON MT EXAM. TIE INDICATIONS HAVE NOT BEEN REMOVED BUT HAVE BEEN WELD OVERLAYED, WITH A MT AFTER EACH WELD LAYER AND AN MT AND RT EXAMINATION PERFORNED AFTER FINAL MACHINING. ACCEPTANCE OF Tim MACHINED SURFACE WAS BASED ON THE ORIGINAL CODE ACCEPTANCE CRITERIA. THE DETAILS OF THE REPAIR PROCESS ARE DESCRIBED IN ATTACHAENT 2 OF NG-93-4013.
ALTERNATIVE EXAMINATION THE SHRINKAGE INDICATIONS WERE REPAIRED BY GRINDING TIE AREAS IN PREPARATION FOR WELDING. TIE SHRINKAGE DEFECTS WERE WELD OVERLAYED AND AN MT AND RT EXAMINATION PERFORhED AFTER FINAL MACHINING, ACCEPTANCE WAS BASED ON ORIGINAL CODE ACCEPTANCE CRITERIA. ENGINEERING EVALUATION HAS BEEN PERFORhED FOR ACCEPTING TIE SUBSURFACE INDICATIONS USING AShE SECTION XI 1980 WITH W81 ADDENDA, TABLE IWB-3518-1.
RADIOGRAPHY OF THE REPAIRED AREAS WILL BE PERFORMED ONCE DURING EITIER RFOl3 OR RFO 14 AND ONCE DUluNG EITHER RFO 15 OR RFO 16, NOT TO EXCEED 2 CYCLES BETWEEN RTs.
SCHEDULE FOR IMPLEMENTATION RFO12. RFOl3 RFO14, RF015. RF016 (AS REQUIRED) i
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -_. _ _ - . .