Letter Sequence Other |
|---|
CAC:001029, (Approved, Closed) EPID:L-2023-LLA-0102, Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement
Results
Other: ML18206A311, ML18317A353, ML18317A355, ML22005A350, ML22006A352, ML22006A353, ML22006A356, ML22278A001, ML23003A046, ML23137A441, ML24204A233, ML24275A093, ML24289A207, ML24305A054, ML24327A249, ML25055A139, ML25078A414, ML25078A416, ML25086A041, ML25086A055, ML25086A244, ML25086A284, ML25087A028, ML25090A330, ML25090A331, ML25112A337, ML25112A339, ML25142A158, ML25161A179, ML25161A181, ML25176A170, ML25178C673, ML25223A188, ML25230A135, ML25253A491, ML25272A064, ML25344A143
|
MONTHYEARML18156A4282018-05-30030 May 2018 Letter from J. Mccann/Columbiana Hi Tech to Document Control Desk Application for Revision of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad (Lr) Transportation Unit Package, Docket No. 71-9291 Project stage: Request ML18206A3112018-07-25025 July 2018 Letter to Mccann Application for Amendment of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad Transport Unit Package - Accepted for Review Project stage: Other ML18264A0022018-09-0707 September 2018 Columbiana Hi Tech, LLC - Certificate Holder Name and Address Change Project stage: Request ML18269A2732018-09-24024 September 2018 Package: Renewal of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad Transport Unit Package Project stage: Request ML19015A3732019-01-10010 January 2019 Tn Americas, LLC - Application for Revision to Certificate of Compliance for USA/9291/B(U)F-96 for the Model No. Lr Transport Unit Project stage: Request ML18317A3532019-02-13013 February 2019 Enclosure 1: Certificate of Compliance No. 9291, Rev No. 11 (Letter to W. Edwards Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD Transport Unit Package) Project stage: Other ML18317A3522019-02-13013 February 2019 Package: Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD (Lr) Transport Unit Package Project stage: Request ML18317A3552019-02-13013 February 2019 Letter to W. Edwards Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD Transport Unit Package (W/Enclosure 2) Project stage: Other ML20209A3722020-07-27027 July 2020 Notice of Partially Closed Third Pre-Application Meeting with Tn Ammericas LLC for Model No. TN-EAGLE Transportation Package Project stage: Meeting ML22005A3502021-12-14014 December 2021 Email from D. Ortega (NNSA) to N. Garcia (U.S. NRC) Renewal of Certificate of Compliance (CoC) No. 9329 for the Model No. S300 Package Project stage: Other ML22005A3462021-12-14014 December 2021 Transmittal Letter from A. M. Al-Daouk to U.S. Nuclear Regulatory Commission, Renewal Request of the Certificate of Compliance No. 9329 for the Model No. S300 Package Project stage: Request ML22006A3522021-12-27027 December 2021 Enclosure 3: Email Dated 12/27/21 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Comments on Telephone Call Summary Dated 12/1/21, Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3532021-12-27027 December 2021 Enclosure 2: Attachment to Email Dated 11-29-21, Responses to Follow Up Questions, Acceptance Tests for the Lead Ssield of the Shielded Canisters (Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3562021-12-27027 December 2021 Enclosure 5: Clarification Regarding Testing Performed During the Shielded Container Prototype Testing (Drop Tests, Gamma Scans, Destructive Disassembly), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3552022-01-0606 January 2022 12/1/21-Conference Call Summary: Follow Up Questions Related to Shielding RAIs RAI-Sh-5 and -8 (Acceptance Tests, Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages Project stage: RAI ML22020A1872022-01-25025 January 2022 Enclosure 2 - Safety Evaluation Report: Renewal for Certificate of Compliance, Revision 6, the Model No. S300 Package Project stage: Approval ML22278A0072022-09-0808 September 2022 Email from T.E. Sellmer (Nwp) to N. Garcia Santos (NRC) Acknowledgement of Application for CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact Packages Project stage: Request ML25086A0552022-09-30030 September 2022 Redacted, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML22278A0012022-10-0404 October 2022 Email from T. Sellmer (Nwp) to N. Garcia Santos (NRC) Et Al., Delay of RAI Response-CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact CoCs Project stage: Other ML23046A4542023-02-15015 February 2023 Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary Project stage: Request ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization Project stage: RAI ML23003A0462023-03-29029 March 2023 Response to Request for Reviewing a Position Paper from Nuclear Fuel Services, Inc. Related to Applicability of 10 CFR 71.15(C) to Shipment(S) Project stage: Other ML23333A0332023-05-30030 May 2023 Email Dated 5-30-23 from T Holly (NFS) to Ngarcia Santos (Nrc), Transmittal of Affidavit Related to Fissile Material Exemption (10 CFR 71.15 (C), Follow Up Questions and Additional Comments (Docket No. 70-143) Project stage: Request ML23137A4412023-06-0202 June 2023 Authorization for Shipment of the Model No. Halfpact Package - Inner Containment Vessel No. 506 Project stage: Other ML25087A0272023-07-0303 July 2023 Transmittal Letter Dated 7/3/23 from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML25087A0282023-07-0303 July 2023 Enclosure, Letter Dated 7/3/23 from NNSA to NRC, Roadmap, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML23220A1562023-07-21021 July 2023 Road Map for Changes to the Safety Analysis Report Related for Certificate of Compliance No. 9355, Revision 4, Model No 435-B Project stage: Other ML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML23220A1552023-07-21021 July 2023 Email Dated 7-21-23 from J Mumma (NNSA) to Ngarcia Santos (NRC) Transmittal Letter and Changes Roadmap CoC No. 71-9355, Revision 4, Model No. 435-B Project stage: Other ML23263A1022023-09-20020 September 2023 Email Dated 9-20-23 from N. Garcia Santos (NRC) to J. Mumma (Nnsa), Subject: Package Model No. 453-B--Need Clarification on Submittals Project stage: Approval ML25087A0762024-01-24024 January 2024 Transmittal Letter Dated 1/24/24 from Ahmad M. Al-Daouk (NNSA) to Shana Helton (NRC) Related to Canceling the Application Submitted in October 2021 to Revise Certificate of Compliance No. 9355, Model No. 435-B (Docket No. 71-9355) Project stage: Other ML24072A0022024-03-0505 March 2024 Revision of Model No. 435-B Package’S Certificate of Compliance (CoC) Number 9355 for the 435-B Package Project stage: Request ML25087A0032024-03-0505 March 2024 Email Dated 3/5/24 from Jmummas (NNSA) to Ngarcia Santos (Nrc), Cancellation of Application Submitted in 2021 (ML21340A250), Model No. 435-B, Docket No. 71-9355 Project stage: Other ML24150A4092024-06-14014 June 2024 Conversation Record -- Clarification Call with NNSA Regarding NRC Staffs Observations Pertaining to Amendment Request for Certificate of Compliance (CoC) No. 9355 for the 435-B Package, Submitted Via Letters Dated July 3, 2023 and March 5, Project stage: Approval ML24295A1602024-06-30030 June 2024 Redacted, Industrial Nuclear Company - Application for Certificate of Compliance for the Inc IR1 00ST, Revision 0, Docket No. 71-9385 Project stage: Request ML24204A2332024-08-0808 August 2024 Acceptance Determination Letter with Observation, Certificate of Compliance No. 9355, Model No. 435-B Project stage: Other ML24248A2532024-09-20020 September 2024 Request for Additional Information, Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Packaging, EPID L-2023-LLA-0102, CAC 001029 Project stage: RAI ML24281A1762024-09-25025 September 2024 9/25/2024 Conference Call Summary - Supplemental Information to Proposed RAI Responses Related to the Criticality Safety Review of the Model No. Castor geo69 Transport and Storage Systems (Docket Nos. 71-9383 and 72-1052, Respectively) Project stage: Supplement ML24312A2212024-10-0101 October 2024 Extension Request - Robatel Technologies’ Response to U.S. NRC Request for Additional Information for Review of the Robatel Technologies, LLC Model No. RT-200 Type B(U) Cask - Cac/Epid Numbers: 001029/L-2024-NEW-0003 Project stage: Request ML24275A0932024-10-11011 October 2024 Transmittal Letter - Certificate of Compliance No. 9310, Revision No. 8, for the Model No. F-431 Transport Package Project stage: Other ML25058A3592024-10-16016 October 2024 Enclosure to Email Dated 10/16/24, Draft Requests for Supplemental Information and Observations, Model No. IR-100ST, CoC No. 9385, Rev. 0 Project stage: Draft Other ML25058A3612024-10-16016 October 2024 Email Dated 10/16/24 from Ngarcia Santos (NRC) to Mrose (Inc) Transmittal of Draft Requests for Supplemental Information and Observations, Thermal and Structural Evaluations, Model No. IR 100ST, CoC No. 9385, Rev. 0 Project stage: Draft Other ML24289A2072024-10-28028 October 2024 Transmittal Letter and Enclosure, Requests for Supplemental Information and Observations for Revision 0 of CoC No. 9385 for the Model No. IR 100ST Project stage: Other ML24305A0542024-10-31031 October 2024 Email Dated 10-31-24 from Ngarcia Santos (NRC) to Mrose (Inc), Final Signed Letter with Requests for Supplemental Information for the Model No. IR 100ST Project stage: Other ML25058A3562024-11-0707 November 2024 Email Dated 11/7/24 from Ngarcia Santos (NRC) to Mrose (Inc)/Gclark (Orano), Follow Up to Requests for Supplemental Information (Rsis) and Observations Discussion on 11/7/24, Thermal and Structural Evaluations, Model No. IR-100ST, CoC No. 9 Project stage: Approval ML25058A3572024-11-21021 November 2024 Transmittal Email Dated 11/21/24 from Ngarcia Santos (NRC) to Mrose (Inc), Summary of Telephone Call Dated 11/7/24 with Inc, Acceptance Review Questions (Rsis and Observations), Thermal and Structural, Model No. IR-100ST, CoC No. 9385, Rev Project stage: Acceptance Review ML24327A2472024-12-0505 December 2024 Enclosure 2 - Safety Evaluation Report, Renewal of Certificate of Compliance No. 5086, Model No. Unc 2600 Project stage: Approval ML24327A2492024-12-0505 December 2024 Enclosure 1 - Certificate of Compliance No. 5086, Revision 17 (Renewal of Certificate of Compliance No. 5086, Model No. Unc 2600 (EPID L-2024-RNW-0024)) Project stage: Other ML25086A0322024-12-0606 December 2024, 9 January 2025, 4 February 2025, 21 February 2025 Responses to Requests for Additional Information for CoC No. 9355, Revision 4, Model No. 435-B (Docket No. 71-9355) Project stage: Request ML25086A0382024-12-0606 December 2024 Letter Dated 12/6/24 from Kschwendenman (NNSA) to Ngarcia Santos (Nrc), Response to Request for Additional Information on Preshipment Leakage Rate Test (Model No. 435-B, Docket No. 71-9355) Project stage: Response to RAI 2023-07-21
[Table View] |
Text
Roadmap of Detailed Changes Made to the 435-B SAR from Rev. 5.1 to Rev. 6 1
The table below identifies and summarizes the changes made to the 435-B SAR, Revision 5.1, to create Revision 6. Revision 6 has been created to implement several requests of the client to improve security and operational efficiency. The location and discussion of all changes are provided in the table. All changes are marked in the SAR text with revision bars.
Section Reference Change Comment Section 1.2.1.6.2, and Figures 1.2-19, 1.2-20, and 1.2-21 Add option for zinc plating for the disposal canister lid closure bolts.
Both galvanizing and zinc plating are appropriate corrosion protection for the disposal canister lid bolts.
Section 1.2.2 and Section 1.2.2.1 Add sentence to Section 1.2.2 and delete a phrase from Section 1.2.2.1 relating to the sealed sources.
Clarify that sources must be sealed and may be in normal form or special form.
Section 1.2.2.3 Correct the maximum decay heat wattage for the IBL 437 from 15W to 30W.
Correction of typographical error. The thermal evaluation of the IBL 437 uses the correct wattage of 30W in Section 3.5.5, and no revision to the thermal evaluation is necessary.
Table 1.2-2 Correct maximum activity of the IBL 437 from 5,160 Ci to 5,610 Ci..
Correction of typographical error. The activity is stated correctly in Section 1.2.2.3, and the shielding evaluation of the IBL 437 uses the correct activity of 5,610 Ci in Table 5.5.4-5, and no revision to the shielding evaluation is necessary.
Section 1.3.2 Added reference to Section 7.1.6 to the definition of Special Form Capsule in the glossary.
Clarification.
Drawing 1916-01-01-SAR Updated to Revision 8.
Added Flag Note 56 which allows the closure bolt heads to have an opening for a security tool instead of a hex shape as an option.
Drawing 1916-01-05-SAR Updated to Revision 2.
Revises General Note 8 to add the baseplate and the rubber pad to the items which may be notched or relieved to accommodate appurtenances on the IBL 437.
Section 2.10 Revise to include a reference to the requirements of Section 7.1.6.
This allows the shipper to take advantage of special form under the conditions specified in Section 7.1.6.
Roadmap of Detailed Changes Made to the 435-B SAR from Rev. 5.1 to Rev. 6 2
Section Reference Change Comment Section 7.1.2 Expanded paragraph describing the sections for operational steps for each payload type.
Clarification.
Section 7.1.2.1, Section 7.1.2.2, Section 7.1.2.3, Section 7.1.2.4.2 Delete Section 7.1.2.1, steps 18 through 30, add new Step 18: Continue operations at Section 7.1.3, Final Preparations for All Shipments.
Delete Section 7.1.2.2, steps 11 through 23, add new Step 11: (ditto)
Delete Section 7.1.2.3, steps 19 through 31, add new Step 19: (ditto)
Delete Section 7.1.2.4.2, steps 22 through 34, add new Step 22: (ditto)
Consolidates repetitive procedure steps in a revised Section 7.1.3.
Section 7.1.2.2.1 Added text If possible to substeps #2 and #5.
This accommodates the circumstance in which the GC-3000 has been modified for security purposes, by which the auxiliary shield components cannot be removed and the shield plug weld is not accessible.
Section 7.1.3, Section 7.1.3.1, and Section 7.1.3.2 Consolidate operational steps removed from Sections 7.1.2.1, 7.1.2.2, 7.1.2.3, and 7.1.2.4.2, and include new language governing the accommodation of special form.
The consolidation of steps removes redundancy and adds clarity to the requirements. The added language regarding special form regulates when a pre-shipment leakage rate test is used. Note, Section 7.1.3.2 is the same as the previous Section 7.1.3.
Section 7.1.6 New section.
Added to define the requirements for the acceptance of a source as being in special form.