Letter Sequence RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement
Results
Other: ML18206A311, ML18317A353, ML18317A355, ML22005A350, ML22006A352, ML22006A353, ML22006A356, ML22278A001, ML23003A046, ML23137A441, ML24204A233, ML24275A093, ML24289A207, ML24305A054, ML24327A249, ML25055A139, ML25078A414, ML25078A416, ML25086A041, ML25086A055, ML25086A244, ML25086A284, ML25087A028, ML25090A330, ML25090A331, ML25112A337, ML25112A339, ML25142A158, ML25161A179, ML25161A181, ML25176A170, ML25178C673, ML25223A188, ML25230A135, ML25253A491, ML25272A064, ML25344A143
|
MONTHYEARML18156A4282018-05-30030 May 2018 Letter from J. Mccann/Columbiana Hi Tech to Document Control Desk Application for Revision of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad (Lr) Transportation Unit Package, Docket No. 71-9291 Project stage: Request ML18206A3112018-07-25025 July 2018 Letter to Mccann Application for Amendment of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad Transport Unit Package - Accepted for Review Project stage: Other ML18264A0022018-09-0707 September 2018 Columbiana Hi Tech, LLC - Certificate Holder Name and Address Change Project stage: Request ML18269A2732018-09-24024 September 2018 Package: Renewal of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad Transport Unit Package Project stage: Request ML19015A3732019-01-10010 January 2019 Tn Americas, LLC - Application for Revision to Certificate of Compliance for USA/9291/B(U)F-96 for the Model No. Lr Transport Unit Project stage: Request ML18317A3532019-02-13013 February 2019 Enclosure 1: Certificate of Compliance No. 9291, Rev No. 11 (Letter to W. Edwards Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD Transport Unit Package) Project stage: Other ML18317A3552019-02-13013 February 2019 Letter to W. Edwards Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD Transport Unit Package (W/Enclosure 2) Project stage: Other ML18317A3522019-02-13013 February 2019 Package: Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD (Lr) Transport Unit Package Project stage: Request ML20209A3722020-07-27027 July 2020 Notice of Partially Closed Third Pre-Application Meeting with Tn Ammericas LLC for Model No. TN-EAGLE Transportation Package Project stage: Meeting ML22005A3502021-12-14014 December 2021 Email from D. Ortega (NNSA) to N. Garcia (U.S. NRC) Renewal of Certificate of Compliance (CoC) No. 9329 for the Model No. S300 Package Project stage: Other ML22005A3462021-12-14014 December 2021 Transmittal Letter from A. M. Al-Daouk to U.S. Nuclear Regulatory Commission, Renewal Request of the Certificate of Compliance No. 9329 for the Model No. S300 Package Project stage: Request ML22006A3522021-12-27027 December 2021 Enclosure 3: Email Dated 12/27/21 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Comments on Telephone Call Summary Dated 12/1/21, Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3562021-12-27027 December 2021 Enclosure 5: Clarification Regarding Testing Performed During the Shielded Container Prototype Testing (Drop Tests, Gamma Scans, Destructive Disassembly), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3532021-12-27027 December 2021 Enclosure 2: Attachment to Email Dated 11-29-21, Responses to Follow Up Questions, Acceptance Tests for the Lead Ssield of the Shielded Canisters (Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3552022-01-0606 January 2022 12/1/21-Conference Call Summary: Follow Up Questions Related to Shielding RAIs RAI-Sh-5 and -8 (Acceptance Tests, Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages Project stage: RAI ML22020A1872022-01-25025 January 2022 Enclosure 2 - Safety Evaluation Report: Renewal for Certificate of Compliance, Revision 6, the Model No. S300 Package Project stage: Approval ML22278A0072022-09-0808 September 2022 Email from T.E. Sellmer (Nwp) to N. Garcia Santos (NRC) Acknowledgement of Application for CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact Packages Project stage: Request ML25086A0552022-09-30030 September 2022 Redacted, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML22278A0012022-10-0404 October 2022 Email from T. Sellmer (Nwp) to N. Garcia Santos (NRC) Et Al., Delay of RAI Response-CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact CoCs Project stage: Other ML23046A4542023-02-15015 February 2023 Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary Project stage: Request ML23003A0462023-03-29029 March 2023 Response to Request for Reviewing a Position Paper from Nuclear Fuel Services, Inc. Related to Applicability of 10 CFR 71.15(C) to Shipment(S) Project stage: Other ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization Project stage: RAI ML23333A0332023-05-30030 May 2023 Email Dated 5-30-23 from T Holly (NFS) to Ngarcia Santos (Nrc), Transmittal of Affidavit Related to Fissile Material Exemption (10 CFR 71.15 (C), Follow Up Questions and Additional Comments (Docket No. 70-143) Project stage: Request ML23137A4412023-06-0202 June 2023 Authorization for Shipment of the Model No. Halfpact Package - Inner Containment Vessel No. 506 Project stage: Other ML25087A0282023-07-0303 July 2023 Enclosure, Letter Dated 7/3/23 from NNSA to NRC, Roadmap, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML23263A1022023-09-20020 September 2023 Email Dated 9-20-23 from N. Garcia Santos (NRC) to J. Mumma (Nnsa), Subject: Package Model No. 453-B--Need Clarification on Submittals Project stage: Approval ML24072A0022024-03-0505 March 2024 Revision of Model No. 435-B Package’S Certificate of Compliance (CoC) Number 9355 for the 435-B Package Project stage: Request ML24295A1602024-06-30030 June 2024 Redacted, Industrial Nuclear Company - Application for Certificate of Compliance for the Inc IR1 00ST, Revision 0, Docket No. 71-9385 Project stage: Request ML24204A2332024-08-0808 August 2024 Acceptance Determination Letter with Observation, Certificate of Compliance No. 9355, Model No. 435-B Project stage: Other ML24248A2532024-09-20020 September 2024 Request for Additional Information, Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Packaging, EPID L-2023-LLA-0102, CAC 001029 Project stage: RAI ML24281A1762024-09-25025 September 2024 9/25/2024 Conference Call Summary - Supplemental Information to Proposed RAI Responses Related to the Criticality Safety Review of the Model No. Castor geo69 Transport and Storage Systems (Docket Nos. 71-9383 and 72-1052, Respectively) Project stage: Supplement ML24312A2212024-10-0101 October 2024 Extension Request - Robatel Technologies’ Response to U.S. NRC Request for Additional Information for Review of the Robatel Technologies, LLC Model No. RT-200 Type B(U) Cask - Cac/Epid Numbers: 001029/L-2024-NEW-0003 Project stage: Request ML24275A0932024-10-11011 October 2024 Transmittal Letter - Certificate of Compliance No. 9310, Revision No. 8, for the Model No. F-431 Transport Package Project stage: Other ML25058A3612024-10-16016 October 2024 Email Dated 10/16/24 from Ngarcia Santos (NRC) to Mrose (Inc) Transmittal of Draft Requests for Supplemental Information and Observations, Thermal and Structural Evaluations, Model No. IR 100ST, CoC No. 9385, Rev. 0 Project stage: Draft Other ML25058A3592024-10-16016 October 2024 Enclosure to Email Dated 10/16/24, Draft Requests for Supplemental Information and Observations, Model No. IR-100ST, CoC No. 9385, Rev. 0 Project stage: Draft Other ML24289A2072024-10-28028 October 2024 Transmittal Letter and Enclosure, Requests for Supplemental Information and Observations for Revision 0 of CoC No. 9385 for the Model No. IR 100ST Project stage: Other ML24305A0542024-10-31031 October 2024 Email Dated 10-31-24 from Ngarcia Santos (NRC) to Mrose (Inc), Final Signed Letter with Requests for Supplemental Information for the Model No. IR 100ST Project stage: Other ML25058A3562024-11-0707 November 2024 Email Dated 11/7/24 from Ngarcia Santos (NRC) to Mrose (Inc)/Gclark (Orano), Follow Up to Requests for Supplemental Information (Rsis) and Observations Discussion on 11/7/24, Thermal and Structural Evaluations, Model No. IR-100ST, CoC No. 9 Project stage: Approval ML25058A3572024-11-21021 November 2024 Transmittal Email Dated 11/21/24 from Ngarcia Santos (NRC) to Mrose (Inc), Summary of Telephone Call Dated 11/7/24 with Inc, Acceptance Review Questions (Rsis and Observations), Thermal and Structural, Model No. IR-100ST, CoC No. 9385, Rev Project stage: Acceptance Review ML24327A2492024-12-0505 December 2024 Enclosure 1 - Certificate of Compliance No. 5086, Revision 17 (Renewal of Certificate of Compliance No. 5086, Model No. Unc 2600 (EPID L-2024-RNW-0024)) Project stage: Other ML24327A2472024-12-0505 December 2024 Enclosure 2 - Safety Evaluation Report, Renewal of Certificate of Compliance No. 5086, Model No. Unc 2600 Project stage: Approval ML25086A0382024-12-0606 December 2024 Letter Dated 12/6/24 from Kschwendenman (NNSA) to Ngarcia Santos (Nrc), Response to Request for Additional Information on Preshipment Leakage Rate Test (Model No. 435-B, Docket No. 71-9355) Project stage: Response to RAI ML25086A0322024-12-0606 December 2024, 9 January 2025, 4 February 2025, 21 February 2025 Responses to Requests for Additional Information for CoC No. 9355, Revision 4, Model No. 435-B (Docket No. 71-9355) Project stage: Request ML25058A3582024-12-0909 December 2024 NRC Form 699, Summary of Telephone Call Dated 11/7/24 with Inc, Acceptance Review Questions (Rsis and Observations), Thermal and Structural, Model No. IR-100ST, CoC No. 9385, Rev. 0 Project stage: Acceptance Review ML25055A1392025-01-24024 January 2025 Redacted -Industrial Nuclear Co, Inc., Safety Analysis Report, IR-100ST Exposure Device Project stage: Other ML25086A0412025-02-0404 February 2025 Email Dated 2/2/25 from Jthurgood (NNSA) to Ngarcia Santos (Nrc), Status of Revised SAR Related to RAI Response and Renewal Request, Model No. 435-B, CoC No. 9355, Revision 4 (Docket No. 71-9355) Project stage: Other ML25086A0342025-02-21021 February 2025 Letter Dated 2/21/25 from Kschwendenman (NNSA) to Ngarcia Santos (Nrc), Response to Request for Additional Information and 435-B Transportation Package, Safety Analysis Report (Docket No. 71-9355) Project stage: Response to RAI ML25086A2442025-02-21021 February 2025 Redacted, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6.1 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML25078A4162025-02-21021 February 2025 Letter Dated 2/21/25 from Kchwendenman (NNSA) to Ngarcia Santos (Nrc), Renewal of CoC No. 9355, Model No. 435-B (Docket No. 71-9355) Project stage: Other 2023-07-03
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 17, 2018 Mr. Jim McCann, President Columbiana Hi Tech LLC 1621 Old Greensboro Road Kernersville, NC 27284
SUBJECT:
APPLICATION FOR AMENDMENT OF CERTIFICATE OF COMPLIANCE NO. 9291 FOR THE MODEL NO. LIQUI-RAD TRANSPORT UNIT PACKAGE -
REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. McCann:
By letter dated May 30, 2018, to the U.S. Nuclear Regulatory Commission (NRC),
Columbiana Hi Tech LLC submitted an application for amendment of Certificate of Compliance (CoC) No. 9291 for the Model No. Liqui-Rad Transport Unit Package.
The NRC staff has completed its initial review and requires the information described in the enclosure to complete its review. Additional information requested in the enclosed request for additional information should be submitted in the form of revised pages to the Safety Analysis Report (SAR) for the Liqui-Rad Transport Unit.
If you have any questions regarding this matter, please contact me at (301) 415-7677.
Sincerely,
/RA/
David D. Brown, Sr. Project Manager Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 71-9291 CAC/EPID 001029/L-2018-LLA-0160
Enclosure:
Request for Additional Information
ML18227B424
- DSFM NAME DBrown SFigueroa JIreland JPiotter DATE 8/23/18 8/26/18 8/24/18 8/27/18 OFC
- DSFM NAME YDiaz-Sanabria JMcKirgan DATE 9/23/18 9/17/18
Enclosure Request for Additional Information Columbiana Hi Tech LLC Docket No. 71-9291 Certificate of Compliance No. 9291 Model No. Liqui-Rad Transport Unit Package By letter dated May 30, 2018, Columbiana Hi Tech LLC (Columbiana, or the certificate holder) requested an amendment to Certificate of Compliance No. 9291, for the Model No. Liqui-Rad Transport Unit Package (NRC Agencywide Documents Access and Management System (ADAMS) Accession No. ML18156A428). By letter dated July 25, 2018, the NRC staff informed Columbiana that its request had been accepted for review (ADAMS Accession No. ML18206A311). This request for additional information describes information needed by the U.S. Nuclear Regulatory Commission staff to complete its review of the request.
RAI 1-1 Revise SAR Section 1.2.2, Operational Features, to state the correct total number of bolts on the containment boundary primary and secondary lids.
In proposed Revision 9 to the Safety Analysis Report (SAR) for the Liqui-Rad Transport Unit submitted on May 30, 2018, the certificate holder revised SAR Section 1.2.2, Operational Features, item iii.), to state the primary operational features of the LR include, A total of thirty-two (32) 5/8 diameter studs/bolts and nuts to provide positive closure of the primary lid and secondary lid. However, this is contrary to statements in the following SAR sections, which state twenty-eight (28) studs/bolts and nuts provide closure of the primary and secondary lid:
Section 1.2.1.1, Overall Construction; Section 1.2.1.5, Closures; Appendix 1.3.1, which contains Drawing Number LR-SAR; Section 2.4.3, Positive Closure; Table 2-1, Liqui-Rad Summary of the Structural Evaluation, Design Criteria, and Results of the Evaluation; and Section 4.1.4, Closure.
This information is required to determine compliance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 71.43(c) and 71.51(a)(1) and (2).
RAI 7-1 Clarify SAR Section 7.1.2, Loading of Contents and Securing the Package for Shipment, to explain how the containment boundary primary lid is properly secured to the appropriate torque values if tamper-indicating devices are not present.
Section 7.1.2 of the SAR describes torque values for the secondary lid closure bolts, but Section 7.1.2 of the SAR does not describe how the containment boundary primary lid is properly secured and torque values are verified if tamper-indicating devices are not present. Staff acknowledges that Section 4.2.3, Containment Criterion, of the SAR states:
The primary lid is usually only operated during periodic testing and maintenance activities; therefore, it has been fitted with loops to secure tamper-indicating devices. The devices are intended to indicate to the User whether or not the lid has been operated in the time since the last periodic test.
In the unusual event that the primary lid has been operated within 12 months since the last periodic leakage rate test, the securing of the primary lid with appropriate torque values should be described in Section 7.1.2 of the SAR.
This information is required to determine compliance with the requirements of 10 CFR 71.43(c) and 71.51(a)(1) and (2).
RAI 7-2 Clarify if it is necessary to revise SAR Section 7.1.1, Pre-loading inspection, sub-paragraph b., and SAR Section 8.2, Maintenance Programs, sub-paragraph b. to conform to the certificate holders proposed changes in Rev. 9 of the SAR regarding the torque specification for the MVE lid.
Both SAR Section 7.1.1, Pre-loading inspection, sub-paragraph b. and SAR Section 8.2, Maintenance Programs, sub-paragraph b. state, After verification, replace the MVE lid and torque the bolts to 75 ft-lbs [+10 -0]. However, in its May 30, 2018, request, the certificate holder proposed changes to SAR Section 7.4, Use of the MVE Feature, sub-paragraphs b.
and c. to state, All MVE lid bolts shall be tightened to 30 [+10 -0] ft.-lbs. It is not clear from the amendment request justification for changing torque requirements if conforming changes to SAR Sections 7.1.1 and 8.2 are necessary to approve the certificate holders requested change to SAR Section 7.4.
This information is required to determine compliance with the requirements of 10 CFR 71.43(d).
Additional items
- 1. Consider correcting a spelling error of removal on SAR page 1-1
- 2. Consider correcting two instances of a spelling error of equivalent in Note 4 of Drawing Number LR-SAR, Sheet 4.