Letter Sequence Request |
|---|
EPID:001029, Letter from J. Mccann/Columbiana Hi Tech to Document Control Desk Application for Revision of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad (Lr) Transportation Unit Package, Docket No. 71-9291 (Approved, Closed) CAC:001029, (Approved, Closed) |
Results
Other: ML18206A311, ML18317A353, ML18317A355, ML22020A185, ML22020A186, ML23220A156, ML23333A105, ML24275A094, ML24327A248, ML25086A037, ML25086A283, ML25087A003, ML25161A182, ML25164A059, ML25164A061, ML25164A062, ML25192A250, ML25196A412, ML25230A135
|
MONTHYEARML18156A4282018-05-30030 May 2018 Letter from J. Mccann/Columbiana Hi Tech to Document Control Desk Application for Revision of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad (Lr) Transportation Unit Package, Docket No. 71-9291 Project stage: Request ML18206A3112018-07-25025 July 2018 Letter to Mccann Application for Amendment of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad Transport Unit Package - Accepted for Review Project stage: Other ML18264A0022018-09-0707 September 2018 Columbiana Hi Tech, LLC - Certificate Holder Name and Address Change Project stage: Request ML18227B4242018-09-17017 September 2018 Letter to J. Mccann Application for Amendment of Certificate of Compliance No. 9291 for the Model No. Liqui-RAD Transport Unit Package - Request for Additional Information (W/Enclosure) Project stage: RAI ML18269A2732018-09-24024 September 2018 Package: Renewal of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad Transport Unit Package Project stage: Request ML19015A3732019-01-10010 January 2019 Tn Americas, LLC - Application for Revision to Certificate of Compliance for USA/9291/B(U)F-96 for the Model No. Lr Transport Unit Project stage: Request ML18317A3552019-02-13013 February 2019 Letter to W. Edwards Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD Transport Unit Package (W/Enclosure 2) Project stage: Other ML18317A3522019-02-13013 February 2019 Package: Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD (Lr) Transport Unit Package Project stage: Request ML18317A3532019-02-13013 February 2019 Enclosure 1: Certificate of Compliance No. 9291, Rev No. 11 (Letter to W. Edwards Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD Transport Unit Package) Project stage: Other ML20209A3722020-07-27027 July 2020 Notice of Partially Closed Third Pre-Application Meeting with Tn Ammericas LLC for Model No. TN-EAGLE Transportation Package Project stage: Meeting ML22005A3502021-12-14014 December 2021 Email from D. Ortega (NNSA) to N. Garcia (U.S. NRC) Renewal of Certificate of Compliance (CoC) No. 9329 for the Model No. S300 Package Project stage: Other ML22005A3462021-12-14014 December 2021 Transmittal Letter from A. M. Al-Daouk to U.S. Nuclear Regulatory Commission, Renewal Request of the Certificate of Compliance No. 9329 for the Model No. S300 Package Project stage: Request ML22006A3532021-12-27027 December 2021 Enclosure 2: Attachment to Email Dated 11-29-21, Responses to Follow Up Questions, Acceptance Tests for the Lead Ssield of the Shielded Canisters (Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3562021-12-27027 December 2021 Enclosure 5: Clarification Regarding Testing Performed During the Shielded Container Prototype Testing (Drop Tests, Gamma Scans, Destructive Disassembly), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3522021-12-27027 December 2021 Enclosure 3: Email Dated 12/27/21 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Comments on Telephone Call Summary Dated 12/1/21, Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3552022-01-0606 January 2022 12/1/21-Conference Call Summary: Follow Up Questions Related to Shielding RAIs RAI-Sh-5 and -8 (Acceptance Tests, Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages Project stage: RAI ML22020A1872022-01-25025 January 2022 Enclosure 2 - Safety Evaluation Report: Renewal for Certificate of Compliance, Revision 6, the Model No. S300 Package Project stage: Approval ML22020A1862022-01-25025 January 2022 Transmittal Letter (Markings) - Certificate of Compliance, Revision 6, and Renewal for the Model No. S300 Project stage: Other ML22020A1852022-01-25025 January 2022 Enclosure 1 - Certificate of Compliance, Revision 6, Model No. S300 Package (Renewal) Project stage: Other ML22278A0072022-09-0808 September 2022 Email from T.E. Sellmer (Nwp) to N. Garcia Santos (NRC) Acknowledgement of Application for CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact Packages Project stage: Request ML25086A0552022-09-30030 September 2022 Redacted, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML22278A0012022-10-0404 October 2022 Email from T. Sellmer (Nwp) to N. Garcia Santos (NRC) Et Al., Delay of RAI Response-CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact CoCs Project stage: Other ML23046A4542023-02-15015 February 2023 Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary Project stage: Request ML23003A0462023-03-29029 March 2023 Response to Request for Reviewing a Position Paper from Nuclear Fuel Services, Inc. Related to Applicability of 10 CFR 71.15(C) to Shipment(S) Project stage: Other ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization Project stage: RAI ML23333A1052023-04-28028 April 2023 Enclosure 3-2 (Redacted), Email from Tholly (NFS) to Ngarcia Santos (Nrc), NFS Follow Up Questions on NRCs Response to NFS Position Paper on the Applicability of 10 CFR 71.15 to Shipments, Conference Call Summary on 5/22/23 (Docket No. 70-1 Project stage: Other ML23333A0352023-05-22022 May 2023 Enclosure 2, Meeting Agenda, Conference Call Summary, NRC and NFS Closed Meeting on 5/22/23 to Discuss Questions Related to NRCs Response to NFS Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23333A0332023-05-30030 May 2023 Email Dated 5-30-23 from T Holly (NFS) to Ngarcia Santos (Nrc), Transmittal of Affidavit Related to Fissile Material Exemption (10 CFR 71.15 (C), Follow Up Questions and Additional Comments (Docket No. 70-143) Project stage: Request ML23137A4412023-06-0202 June 2023 Authorization for Shipment of the Model No. Halfpact Package - Inner Containment Vessel No. 506 Project stage: Other ML25087A0272023-07-0303 July 2023 Transmittal Letter Dated 7/3/23 from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML25087A0282023-07-0303 July 2023 Enclosure, Letter Dated 7/3/23 from NNSA to NRC, Roadmap, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML23220A1562023-07-21021 July 2023 Road Map for Changes to the Safety Analysis Report Related for Certificate of Compliance No. 9355, Revision 4, Model No 435-B Project stage: Other ML23229A2072023-08-17017 August 2023 Notice for a Partially Closed Pre-application Meeting with NAC International to Discuss the NAC Lwt Pre-application Project stage: Meeting ML23249A1532023-08-31031 August 2023 Pre-Application Meeting on NAC Lwt: Iron Clad Fuel Rod Revision Request, August 31, 2023 Project stage: Meeting ML23263A1022023-09-20020 September 2023 Email Dated 9-20-23 from N. Garcia Santos (NRC) to J. Mumma (Nnsa), Subject: Package Model No. 453-B--Need Clarification on Submittals Project stage: Approval ML23258A2142023-10-0202 October 2023 Meeting Summary: Pre-application Meeting on NAC Lwt to Discuss Iron Clad Fuel Rod Revision Request, August 31, 2023 Project stage: Meeting ML24072A0022024-03-0505 March 2024 Revision of Model No. 435-B Package’S Certificate of Compliance (CoC) Number 9355 for the 435-B Package Project stage: Request ML25087A0032024-03-0505 March 2024 Email Dated 3/5/24 from Jmummas (NNSA) to Ngarcia Santos (Nrc), Cancellation of Application Submitted in 2021 (ML21340A250), Model No. 435-B, Docket No. 71-9355 Project stage: Other ML24295A1602024-06-30030 June 2024 Redacted, Industrial Nuclear Company - Application for Certificate of Compliance for the Inc IR1 00ST, Revision 0, Docket No. 71-9385 Project stage: Request ML24204A2332024-08-0808 August 2024 Acceptance Determination Letter with Observation, Certificate of Compliance No. 9355, Model No. 435-B Project stage: Other ML24324A0462024-09-0909 September 2024 Redacted, BWXT Nuclear Operations Group, Inc. - Request for Renewal of Certificate of Compliance No. 5086 for the Model Unc 2600 Package Project stage: Request ML24260A1712024-09-0909 September 2024 BWXT Nuclear Operations Group, Inc. - Request for Renewal of Certificate of Compliance No. 5086 for the Model Unc 2600 Package Project stage: Request ML24255A8132024-09-10010 September 2024 Submittal of NAC OPTIMUS-L Safety Analysis Report (Sar), Revision 2 for, Certificate of Compliance 71-9390 Project stage: Request ML24248A2532024-09-20020 September 2024 Request for Additional Information, Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Packaging, EPID L-2023-LLA-0102, CAC 001029 Project stage: RAI ML24281A1742024-09-25025 September 2024 Enclosure 1, Non-Proprietary Information, Supplemental Information to Proposed RAI Responses Related to the Criticality Safety Review of the Model No. Castor geo69 Transport and Storage Systems Project stage: Supplement ML24281A1762024-09-25025 September 2024 9/25/2024 Conference Call Summary - Supplemental Information to Proposed RAI Responses Related to the Criticality Safety Review of the Model No. Castor geo69 Transport and Storage Systems (Docket Nos. 71-9383 and 72-1052, Respectively) Project stage: Supplement ML24312A2212024-10-0101 October 2024 Extension Request - Robatel Technologies’ Response to U.S. NRC Request for Additional Information for Review of the Robatel Technologies, LLC Model No. RT-200 Type B(U) Cask - Cac/Epid Numbers: 001029/L-2024-NEW-0003 Project stage: Request ML24275A0952024-10-11011 October 2024 Safety Evaluation Report - Certificate of Compliance No. 9310, Revision No. 8, for the Model No. F-431 Transport Package Project stage: Approval ML24275A0942024-10-11011 October 2024 Certificate of Compliance No. 9310, Revision No. 8, Model No. F-431 Transport Package Project stage: Other 2023-03-29
[Table View] |
Text
Columbia Office 7135 Minstrel Way Columbia, MD 21045 Tel: (410) 910-6900
@Orano_USA January 10, 2019 E-52931 Revision 01 U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852
Subject:
Application for Revision to Certificate of Compliance for USA/9291/B(U)F-96 for the Model No. LR Transport Unit
References:
[1] CHT Letter, dated May 20, 2018, Application for revision of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad (LR) Transportation Unit Package, Docket No. 71-9291.
[2] Letter dated September 17, 2018 from Mr. David D. Brown (U.S.
Nuclear Regulatory Commission) to Mr. Jim McCann (Columbiana Hi Tech LLC), Application for Amendment of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad Transportion Unit - Request for Additional Information.
[3] NRC Certificate of Compliance No. 9291 for the Model No.
Liqui-Rad (LR) Transportation Unit Package, Docket No.
71-9291, Revision 10 dated September 24, 2018.
Dear Mr. White:
This supplement to the application for change to the packaging design [1] provides responses to request for additional information (RAI) [2]. Responses to RAI are provided as Enclosure 1. Pages affected by this supplement are summarized in and consolidated into the application as provided in Enclosure 2 and 3.
The Certificate of Compliance (CoC) Liqui-Rad (LR) Transportation Unit Package [3]
expires July 31, 2019. TN Americas LLC requests a review of the responses and issuance of Revision 11 to address the application and renewal of the CoC to extend expiration date five years from the date of issuance. A consolidated application is submitted with this supplement. Renewal of the CoC with this consolidated application including changes incorporated by reference in the existing certificate minimizes the burden on the applicant and cost resulting from a renewal request within 12 months of this application.
Document Control Desk E-52931 January 10, 2019 Page 2 of 2 Should you or your staff have any questions or require additional information to support review of this application, please contact Mr. Peter Vescovi by telephone at 336 420-8325, or by e-mail at Peter.Vescovi@orano.group.
Sincerely, W. Scott Edwards Director of Transportation TN Americas LLC
Enclosures:
(1) RAI Responses (2) Changed Pages for LR Transportation Packaging SAR (3) Consolidated LR Transportation Packaging SAR (PUBLIC)
(4) Consolidated LR Transportation Packaging SAR (SUNSI)
Electronic Information Exchange (EIE) Document Components:
001 E-52912 (Revision 1)Transmittal Letter.doc 002 Liqui-Rad SAR (PUBLIC) Rev 9.pdf 003 003 Liqui-Rad SAR (SUNSI) Rev 9.pdf cc: Bernard White, Senior Project Manager, U.S. Nuclear Regulatory Commission Glenn Mathues, Licensing Engineer, Orano TN Americas Peter Vescovi, Project Engineer, Orano TN Americas Don Shaw, Licensing Manager, Orano TN Americas Digitally signed by EDWARDS William DN: o=AREVA GROUP, 2.5.4.45=5A3923106548495977FBD, cn=EDWARDS William Date: 2019.01.11 14:31:29 -08'00'
to E-52931 RAI Responses
RAIs and Responses to E-52931 Page 1 of 3 RAI 1-1:
Revise SAR Section 1.2.2, Operational Features, to state the correct total number of bolts on the containment boundary primary and secondary lids. In proposed Revision 9 to the Safety Analysis Report (SAR) for the Liqui-Rad Transport Unit submitted on May 30, 2018, the certificate holder revised SAR Section 1.2.2, Operational Features, item iii.), to state the primary operational features of the LR include, A total of thirty-two (32) 5/8 diameter studs/bolts and nuts to provide positive closure of the primary lid and secondary lid. However, this is contrary to statements in the following SAR sections, which state twenty-eight (28) studs/bolts and nuts provide closure of the primary and secondary lid: Section 1.2.1.1, Overall Construction; Section 1.2.1.5, Closures; Appendix 1.3.1, which contains Drawing Number LR-SAR; Section 2.4.3, Positive Closure; Table 2-1, Liqui-Rad Summary of the Structural Evaluation, Design Criteria, and Results of the Evaluation; and Section 4.1.4, Closure.
This information is required to determine compliance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 71.43(c) and 71.51(a)(1) and (2).TN International Revised Response to RSI 1-1 RESPONSE TO RAI 1-1:
There are 16 studs with bolts used for closure of the primary lid, and 12 studs/bolts used for closure of the secondary lid. Both lid seals are part of the containment boundary for a total of twenty-eight studs/bolts and nuts providing positive closure of the primary and secondary lids.
SAR Section 1.2.2 has been updated to reflect this information.
Application Impact:
SAR Section 1.2.2 has been revised as described in the response.
RAIs and Responses to E-52931 Page 2 of 3 RAI 7-1:
Clarify SAR Section 7.1.2, Loading of Contents and Securing the Package for Shipment, to explain how the containment boundary primary lid is properly secured to the appropriate torque values if tamper-indicating devices are not present. Section 7.1.2 of the SAR describes torque values for the secondary lid closure bolts, but Section 7.1.2 of the SAR does not describe how the containment boundary primary lid is properly secured and torque values are verified if tamper-indicating devices are not present. Staff acknowledges that Section 4.2.3, Containment Criterion, of the SAR states: The primary lid is usually only operated during periodic testing and maintenance activities; therefore, it has been fitted with loops to secure tamper-indicating devices. The devices are intended to indicate to the User whether or not the lid has been operated in the time since the last periodic test. In the unusual event that the primary lid has been operated within 12 months since the last periodic leakage rate test, the securing of the primary lid with appropriate torque values should be described in Section 7.1.2 of the SAR.
This information is required to determine compliance with the requirements of 10 CFR 71.43(c) and 71.51(a)(1) and (2).
RESPONSE TO RAI 7-1:
In the event that the tamper indicating seals are not present on the primary lid, then the maintenance activity for the primary lid including leak testing and installation of tamper indicating seals is required to be performed.
SAR Section 7.1.2 revised to require maintenance activity to reinstall the primary lid as described in Section 8.2 (h). The maintenance activity step 8.2(h) is revised to add the step to install the tamper indicating seals after successful completion of the leak test.
Application Impact:
SAR Section 8.2 has been revised as described in the response.
RAIs and Responses to E-52931 Page 3 of 3 RAI 7-2:
Clarify if it is necessary to revise SAR Section 7.1.1, Pre-loading inspection, subparagraph b.,
and SAR Section 8.2, Maintenance Programs, sub-paragraph b. to conform to the certificate holders proposed changes in Rev. 9 of the SAR regarding the torque specification for the MVE lid. Both SAR Section 7.1.1, Pre-loading inspection, sub-paragraph b. and SAR Section 8.2, Maintenance Programs, sub-paragraph b. state, After verification, replace the MVE lid and torque the bolts to 75 ft-lbs [+10 -0]. However, in its May 30, 2018, request, the certificate holder proposed changes to SAR Section 7.4, Use of the MVE Feature, sub-paragraphs b.
and c. to state, All MVE lid bolts shall be tightened to 30 [+10 -0] ft.-lbs. It is not clear from the amendment request justification for changing torque requirements if conforming changes to SAR Sections 7.1.1 and 8.2 are necessary to approve the certificate holders requested change to SAR Section 7.4.
This information is required to determine compliance with the requirements of 10 CFR 71.43(d).
RESPONSE TO RAI 7-2:
The manual vent enclosure (MVE) lid torque specified in SAR Section 7.1.1(b) and 8.2(b) should be the same as described in SAR Section 7.4.
SAR Section 7.1.1(b) and 8.2(b) revised to require tightening of MVE lid bolts to 30 [+10 -0] ft.-
lbs.
Application Impact:
SAR Section 7.1.1 has been revised as described in the response.
to E-52931 Changed Pages for LR Transportation Packaging SAR
to E-52931 Changed Pages for LR Transportation Packaging SAR Chapter/Appendix/Section Description and Justification Title Page Revised to show new revision and address of applicant.
Certificate holder changed from Columbiana Hi Tech to TN Americas, LLC with CoC revision 10.
Chapter 1 General Information Sections 1.1, 1.2.1.1, 1.2.1.5, 1.2.2, 1.3.1 (pages 1-1 through 1-4)
Edits to clarify the operational features of the LR Transportation Package, in particular the description and function of the outer lid and MVE lid.
Drawing Number LR-SAR, Sheet 4.
Editorial edits to correct spelling error in Note 4.
Chapter 7 Operating Procedures 7.1.1, 7.1.2, 7.3 (pages 7-1 through 7-3) 7.1.1(b) Change MVE lid bolt torque from 75 ft-lbs to 30 ft-lbs.
7.1.2 (a) - (f) Chnages to specify closure procedures for secondary lid and add requirement to perform maintenance activity to check primary lid closure including installing tamper indicating seals in event these are found to be missing during routine operation.
Chapter 8 Acceptance Tests and Maintenance Program 8.2 (page 8-2) 8.2(b) Change MVE lid bolt torque from 75 ft-lbs to 30 ft-lbs.
8.2(h) Added requirement to install tamper indicating seals on primary lid after inspection and leak test.