MONTHYEARML20209A3722020-07-27027 July 2020 Notice of Partially Closed Third Pre-Application Meeting with Tn Ammericas LLC for Model No. TN-EAGLE Transportation Package Project stage: Meeting ML22005A3462021-12-14014 December 2021 Transmittal Letter from A. M. Al-Daouk to U.S. Nuclear Regulatory Commission, Renewal Request of the Certificate of Compliance No. 9329 for the Model No. S300 Package Project stage: Request ML22005A3502021-12-14014 December 2021 Email from D. Ortega (NNSA) to N. Garcia (U.S. NRC) Renewal of Certificate of Compliance (CoC) No. 9329 for the Model No. S300 Package Project stage: Other ML22006A3522021-12-27027 December 2021 Enclosure 3: Email Dated 12/27/21 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Comments on Telephone Call Summary Dated 12/1/21, Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3532021-12-27027 December 2021 Enclosure 2: Attachment to Email Dated 11-29-21, Responses to Follow Up Questions, Acceptance Tests for the Lead Ssield of the Shielded Canisters (Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3562021-12-27027 December 2021 Enclosure 5: Clarification Regarding Testing Performed During the Shielded Container Prototype Testing (Drop Tests, Gamma Scans, Destructive Disassembly), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3552022-01-0606 January 2022 12/1/21-Conference Call Summary: Follow Up Questions Related to Shielding RAIs RAI-Sh-5 and -8 (Acceptance Tests, Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages Project stage: RAI ML22020A1872022-01-25025 January 2022 Enclosure 2 - Safety Evaluation Report: Renewal for Certificate of Compliance, Revision 6, the Model No. S300 Package Project stage: Approval ML22020A1862022-01-25025 January 2022 Transmittal Letter (Markings) - Certificate of Compliance, Revision 6, and Renewal for the Model No. S300 Project stage: Other ML22020A1852022-01-25025 January 2022 Enclosure 1 - Certificate of Compliance, Revision 6, Model No. S300 Package (Renewal) Project stage: Other ML22101A0712022-04-11011 April 2022 NRR E-mail Capture - Monticello - Acceptance of Requested Licensing Action License Amendment Request to Revise TS 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency Project stage: Acceptance Review ML22111A0862022-04-29029 April 2022 Unacceptable with a Chance to Supplement for Amendment Request to Revise TS to Adopt TSTF-208 Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 Project stage: Other ML22278A0072022-09-0808 September 2022 Email from T.E. Sellmer (Nwp) to N. Garcia Santos (NRC) Acknowledgement of Application for CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact Packages Project stage: Request ML22278A0012022-10-0404 October 2022 Email from T. Sellmer (Nwp) to N. Garcia Santos (NRC) Et Al., Delay of RAI Response-CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact CoCs Project stage: Other ML23046A4542023-02-15015 February 2023 Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary Project stage: Request ML23067A4362023-03-16016 March 2023 Application for a Letter Authorization Related to Coc No. 9279, Model No. Halfpact - Accepted for Review - CAC No. 001029, EPID No. L-2023-LLA-0030 Project stage: Other ML23003A0462023-03-29029 March 2023 Response to Request for Reviewing a Position Paper from Nuclear Fuel Services, Inc. Related to Applicability of 10 CFR 71.15(C) to Shipment(S) Project stage: Other ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization Project stage: RAI ML23333A1052023-04-28028 April 2023 Enclosure 3-2 (Redacted), Email from Tholly (NFS) to Ngarcia Santos (Nrc), NFS Follow Up Questions on Nrc'S Response to Nfs' Position Paper on the Applicability of 10 CFR 71.15 to Shipments, Conference Call Summary on 5/22/23 (Docket No. 70 Project stage: Other ML23333A0352023-05-22022 May 2023 Enclosure 2, Meeting Agenda, Conference Call Summary, NRC and NFS Closed Meeting on 5/22/23 to Discuss Questions Related to Nrc'S Response to Nfs' Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23333A0332023-05-30030 May 2023 Email Dated 5-30-23 from T Holly (NFS) to Ngarcia Santos (Nrc), Transmittal of Affidavit Related to Fissile Material Exemption (10 CFR 71.15 (C), Follow Up Questions and Additional Comments (Docket No. 70-143) Project stage: Request ML23137A4412023-06-0202 June 2023 Authorization for Shipment of the Model No. Halfpact Package - Inner Containment Vessel No. 506 Project stage: Other ML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML23220A1562023-07-21021 July 2023 Road Map for Changes to the Safety Analysis Report Related for Certificate of Compliance No. 9355, Revision 4, Model No 435-B Project stage: Other ML23229A2072023-08-17017 August 2023 Notice for a Partially Closed Pre-application Meeting with NAC International to Discuss the NAC Lwt Pre-application Project stage: Meeting ML23263A1022023-09-20020 September 2023 Email Dated 9-20-23 from N. Garcia Santos (NRC) to J. Mumma (Nnsa), Subject: Package Model No. 453-B--Need Clarification on Submittals Project stage: Approval ML23258A2142023-10-0202 October 2023 Meeting Summary: Pre-application Meeting on NAC Lwt to Discuss Iron Clad Fuel Rod Revision Request, August 31, 2023 Project stage: Meeting 2023-10-02
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION REPORT Docket No. 71-9329 Model No. S300 Certificate of Compliance No. 9329 Revision No. 6
SUMMARY
By application dated December 14, 2021 [Agencywide Documents Access Management System (ADAMS) Accession Number (No.) ML22005A346], the National Nuclear Security Administrations Office of Packaging and Transportation (NNSA or the applicant) submitted a renewal request for Certificate of Compliance (CoC) No. 9329 for the Model No. S300 package.
Chapter 9 of Revision 5 of the application (ADAMS Accession No. ML16295A317) includes a description of the quality assurance program applicable to the Model No. S300 transportation package. The certificate has been renewed for an additional five-year term.
EVALUATION By letter dated December 14, 2021, the applicant requested renewal of CoC No. 9329 for the Model No. S300 package. The applicant did not request any changes to the package design, operating procedures, acceptance tests, or maintenance program for the package. The NRC staff (the staff) verified that Revision 5 of the application was available in ADAMS, since it is referenced in Certificate of Compliance No. 9329 as the consolidated application. The staff checked that the consolidated application included a description of the quality assurance program applicable to the Model No. 9329.
The staff reviewed the contents of Revision 5 of the certificate and verified that the dates and description of Revision 5 of the application and applicable supplements were accurate. The section, Conditions, of this safety evaluation includes a discussion about the changes to the certificate. The certificate has been renewed for an additional five-year term expiring on January 31, 2027.
CONDITIONS The following sections and conditions were changed in the CoC:
- 1) Section No. 3.b. has been revised to include the title, moth, and year of the application and state that the application and its supplements are part of the information considered as part of the renewal.
- 2) The first table in Condition No. 5.b.(2) was rearranged to improve readability. There were no changes to the contents of the table. Since this change was editorial, the staff did not include change bars in the CoC.
Enclosure 2
- 3) Condition No. 10 has been revised to indicate that Revision No. 5 of the certificate may be used until January 31, 2023.
- 4) Condition No. 11 has been revised with an expiration date of January 31, 2027.
The REFERENCES Section of the CoC was revised to add more detailed information about the documents related to Revision 6 of CoC No. 9329 starting with adding the title, month, and year of Revision 5 of the application. The documents listed as supplements dated are mostly related to renewal request. The documents dated September 22, 2016, (ADAMS Accession No. ML16278A639) and December 14, 2021 (ADAMS Accession No. ML22005A346), correspond to renewal requests with no changes to Revision 5 of the application. The document dated October 14, 2016 (ADAMS Accession No. ML16295A091) corresponds to the transmittal letter of Revision 5 of the application requested when processing the renewal in 2016 (ADAMS Package Accession No. ML16305A112).
CONCLUSION Based on the statements and representations contained in the application and the conditions listed above, the staff concludes that the design of the Model No. S300 package has been adequately described and evaluated. The staff concludes that the changes indicated in the certificate do not affect the ability of the package to meet the requirements of 10 CFR Part 71.
The certificate has been renewed for an additional five-year term expiring on January 31, 2027.
Issued with Certificate of Compliance No. 9329, Revision No. 6, on January 25, 2022.