Letter Sequence RAI |
---|
|
Results
Other: ML22005A350, ML22006A352, ML22006A353, ML22006A356, ML22020A185, ML22020A186, ML22278A001, ML23003A046, ML23067A436, ML23137A441, ML23220A156, ML23333A105
|
MONTHYEARML20209A3722020-07-27027 July 2020 Notice of Partially Closed Third Pre-Application Meeting with Tn Ammericas LLC for Model No. TN-EAGLE Transportation Package Project stage: Meeting ML22005A3462021-12-14014 December 2021 Transmittal Letter from A. M. Al-Daouk to U.S. Nuclear Regulatory Commission, Renewal Request of the Certificate of Compliance No. 9329 for the Model No. S300 Package Project stage: Request ML22005A3502021-12-14014 December 2021 Email from D. Ortega (NNSA) to N. Garcia (U.S. NRC) Renewal of Certificate of Compliance (CoC) No. 9329 for the Model No. S300 Package Project stage: Other ML22006A3522021-12-27027 December 2021 Enclosure 3: Email Dated 12/27/21 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Comments on Telephone Call Summary Dated 12/1/21, Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3532021-12-27027 December 2021 Enclosure 2: Attachment to Email Dated 11-29-21, Responses to Follow Up Questions, Acceptance Tests for the Lead Ssield of the Shielded Canisters (Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3562021-12-27027 December 2021 Enclosure 5: Clarification Regarding Testing Performed During the Shielded Container Prototype Testing (Drop Tests, Gamma Scans, Destructive Disassembly), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3552022-01-0606 January 2022 12/1/21-Conference Call Summary: Follow Up Questions Related to Shielding RAIs RAI-Sh-5 and -8 (Acceptance Tests, Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages Project stage: RAI ML22020A1872022-01-25025 January 2022 Enclosure 2 - Safety Evaluation Report: Renewal for Certificate of Compliance, Revision 6, the Model No. S300 Package Project stage: Approval ML22020A1862022-01-25025 January 2022 Transmittal Letter (Markings) - Certificate of Compliance, Revision 6, and Renewal for the Model No. S300 Project stage: Other ML22020A1852022-01-25025 January 2022 Enclosure 1 - Certificate of Compliance, Revision 6, Model No. S300 Package (Renewal) Project stage: Other ML22278A0072022-09-0808 September 2022 Email from T.E. Sellmer (Nwp) to N. Garcia Santos (NRC) Acknowledgement of Application for CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact Packages Project stage: Request ML22278A0012022-10-0404 October 2022 Email from T. Sellmer (Nwp) to N. Garcia Santos (NRC) Et Al., Delay of RAI Response-CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact CoCs Project stage: Other ML23046A4542023-02-15015 February 2023 Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary Project stage: Request ML23067A4362023-03-16016 March 2023 Application for a Letter Authorization Related to Coc No. 9279, Model No. Halfpact - Accepted for Review - CAC No. 001029, EPID No. L-2023-LLA-0030 Project stage: Other ML23003A0462023-03-29029 March 2023 Response to Request for Reviewing a Position Paper from Nuclear Fuel Services, Inc. Related to Applicability of 10 CFR 71.15(C) to Shipment(S) Project stage: Other ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization Project stage: RAI ML23089A2572023-03-29029 March 2023 Email from Ngarcia Santos (NRC) to T.E. Sellmer (Simco), Subject: Structural and Operations - Staggered RAIs Pertaining to the Halfpact Letter Authorization Project stage: RAI ML23095A1112023-04-17017 April 2023 Enclosure - Requests for Additional Information for the Letter Authorization for the Model No. Halfpact Package Project stage: RAI ML23095A1102023-04-17017 April 2023 Transmittal letter-RAI for the Letter Authorization for the Model No. Halfpact Package Project stage: RAI ML23117A0722023-04-27027 April 2023 Response to Request for Additional Information on the Halfpact Docket No. 71-9279, Request for Authorization of One-Time Shipment of Model No. Crediting the Outer Confinement Vessel as the Containment Project stage: Response to RAI ML23333A1052023-04-28028 April 2023 Enclosure 3-2 (Redacted), Email from Tholly (NFS) to Ngarcia Santos (Nrc), NFS Follow Up Questions on Nrc'S Response to Nfs' Position Paper on the Applicability of 10 CFR 71.15 to Shipments, Conference Call Summary on 5/22/23 (Docket No. 70 Project stage: Other ML23333A0352023-05-22022 May 2023 Enclosure 2, Meeting Agenda, Conference Call Summary, NRC and NFS Closed Meeting on 5/22/23 to Discuss Questions Related to Nrc'S Response to Nfs' Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23333A0332023-05-30030 May 2023 Email Dated 5-30-23 from T Holly (NFS) to Ngarcia Santos (Nrc), Transmittal of Affidavit Related to Fissile Material Exemption (10 CFR 71.15 (C), Follow Up Questions and Additional Comments (Docket No. 70-143) Project stage: Request ML23137A4412023-06-0202 June 2023 Authorization for Shipment of the Model No. Halfpact Package - Inner Containment Vessel No. 506 Project stage: Other ML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML23220A1562023-07-21021 July 2023 Road Map for Changes to the Safety Analysis Report Related for Certificate of Compliance No. 9355, Revision 4, Model No 435-B Project stage: Other ML23229A2072023-08-17017 August 2023 Notice for a Partially Closed Pre-application Meeting with NAC International to Discuss the NAC Lwt Pre-application Project stage: Meeting ML23263A1022023-09-20020 September 2023 Email Dated 9-20-23 from N. Garcia Santos (NRC) to J. Mumma (Nnsa), Subject: Package Model No. 453-B--Need Clarification on Submittals Project stage: Approval ML23258A2142023-10-0202 October 2023 Meeting Summary: Pre-application Meeting on NAC Lwt to Discuss Iron Clad Fuel Rod Revision Request, August 31, 2023 Project stage: Meeting 2023-03-16
[Table View] |
|
---|
Category:E-Mail
MONTHYEARL-2023-003, Email Dated May 8, 2023, from T. E. Sellmer (Simco) to N. Garcia Santos (NRC) and D. Smith (Doe), Subject: Halfpact Letter Authorization (Change in Need Date)2023-05-0808 May 2023 Email Dated May 8, 2023, from T. E. Sellmer (Simco) to N. Garcia Santos (NRC) and D. Smith (Doe), Subject: Halfpact Letter Authorization (Change in Need Date) ML23089A2572023-03-29029 March 2023 Email from Ngarcia Santos (NRC) to T.E. Sellmer (Simco), Subject: Structural and Operations - Staggered RAIs Pertaining to the Halfpact Letter Authorization ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization ML22320A1032022-11-15015 November 2022 Email from S. Burns (Nwp) to N. Garcia Santos (Nrc), Subject-IMPORTANT, Courtesy Review, Revised Draft CoCs for the TRUPACT-II and Halfpact Packages ML22320A1042022-11-14014 November 2022 Nuclear Waste Partnership, LLC (Applicant), T Sellmer Comments on Draft Certificate of Compliance No. 9279, Revision 11 ML22278A0012022-10-0404 October 2022 Email from T. Sellmer (Nwp) to N. Garcia Santos (NRC) Et Al., Delay of RAI Response-CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact CoCs ML22278A0072022-09-0808 September 2022 Email from T.E. Sellmer (Nwp) to N. Garcia Santos (NRC) Acknowledgement of Application for CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact Packages ML22118A8552022-04-14014 April 2022 Email Dated 04/14/2022 from Sburns (Nwp) to Ngarcia Santos, Subject--Courtesy Review of Certificate of Compliance Nos. 9279 and 9218 ML22118A8562022-04-14014 April 2022 Email Dated 04/14/2022 from S. Burns (Nwp) to N. Garcia Santos (NRC) Subject--Renewal and Courtesy Review Certificate of Compliance Nos. 9279 and 9218 ML22091A1632022-03-14014 March 2022 Email Dated 3/14/2022, from S. Burns (Nwp) to N. Garcia Santos, Response to NRC Staff'S Follow Up Question on Supplemental RAI Responses Dated 2/24/22 Shielded Container Lid and Bases Lead (Model Nos. TRUPACT-II and Halfpact) ML22091A1622022-02-0808 February 2022 Email Dated 2/8/2022 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Estimated Date to Submit Letter with Responses to the Follow Up Questions Discussed on December 1st, 2021 Telephone Call (Model Nos. TRUPACT-II and Halfpact Packages) ML22103A0692022-01-28028 January 2022 Email from S. Burns to N. Garcia Dated January 28, 2021 Responses to RAI Follow Up Questions Related to the Shielding Evaluation for Revision 10 of the Certificate of Compliance for the Model No. Halfpact Package ML22006A3532021-12-27027 December 2021 Enclosure 2: Attachment to Email Dated 11-29-21, Responses to Follow Up Questions, Acceptance Tests for the Lead Ssield of the Shielded Canisters (Model Nos. TRUPACT-II and Halfpact Packages ML22006A3522021-12-27027 December 2021 Enclosure 3: Email Dated 12/27/21 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Comments on Telephone Call Summary Dated 12/1/21, Model Nos. TRUPACT-II and Halfpact Packages ML22006A3512021-12-27027 December 2021 Enclosure 4: Nwp'S (Applicant'S) Comments on the Summary of the Teleconference Dated December 1, 2021 Related to Shielding RAIs (Acceptance Tests), Model Nos. TRUPACT-II and Halfpact Packages ML22006A3542021-11-29029 November 2021 Enclosure 1: Transmittal Email Dated 11/29/21, Follow Up Questions and Responses Related to Acceptance Tests (Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages ML20316A0012020-09-28028 September 2020 Email from K. Moyant (Nwp) to N. Garcia Santos (NRC) - Follow Up to Telephone Call Regarding the Materials and Criticality Evaluations, TRUPACT-II (Rev. 25) and Halfpact (Rev. 9) 2023-05-08
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23095A1112023-04-17017 April 2023 Enclosure - Requests for Additional Information for the Letter Authorization for the Model No. Halfpact Package ML23089A2572023-03-29029 March 2023 Email from Ngarcia Santos (NRC) to T.E. Sellmer (Simco), Subject: Structural and Operations - Staggered RAIs Pertaining to the Halfpact Letter Authorization ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization ML22256A3052022-09-19019 September 2022 Enclosure- Request for Additional Information Model Nos. TRUPACT-II and Halfpact ML22006A3512021-12-27027 December 2021 Enclosure 4: Nwp'S (Applicant'S) Comments on the Summary of the Teleconference Dated December 1, 2021 Related to Shielding RAIs (Acceptance Tests), Model Nos. TRUPACT-II and Halfpact Packages ML21214A1462021-08-11011 August 2021 2. Enclosurequest for Additional Information Model Nos. TRUPACT-II and Halfpact (EPIDs L-2021-LLA-0033 and L-2021-LLA-0034) ML21214A1452021-08-11011 August 2021 Transmittal Letter Request for Additional Information, Model Nos Trupact II and Halfpact Transport Packages 2023-04-17
[Table view] |
Text
Preliminary Request for Additional Information (RAI)
Docket No. 71-9279 DOE Certificate of Compliance No. 9279 for HalfPACT One-time shipment RAI 2-1 Provide the additional information listed below to supplement that presented in Appendix F, report HPT-CAL-0001, Loaded HalfPACT ICV Lifting Evaluation, which was included as part of the letter titled Request for Authorization of One-Time Shipment of Model No. HalfPACT Crediting the Outer Confinement Vessel as the Containment Boundary (ADAMs accession no.
ML23046A454):
(a) Include the pertinent information from section 3.1.4 of PDD PT00 as part of the report content. This document is mentioned on the cover sheet of the report but is not referenced.
(b) Justify the exclusion of normal conditions of transport (NCT) effects of decay heat, environmental thermal and internal pressure for the structural evaluation of internal containment vessel (ICV) lid lifting sockets and pins during transfer lift conditions.
(c) Provide a description of the anticipated location and ambient conditions during the transfer lift of the ICV from the old outer confinement vessel (OCV) to the new one.
(d) Justify the use of Type 304 stainless steel material properties in the transfer lift evaluation, which appears to have been taken from the 70 deg. F entry on table 2.3-1 of the safety analysis report (SAR), revision 9.
(e) Provide a reference for the ICV 506 payload weight and include in the report.
(f) Justify the addition of the simulated ICV payload weight of a 5485 lbs. to the ICV selfweight of 2215 lbs. to determine the gross allowable lifting capacity of 7700 lbs.
(g) Include the pertinent information from report reference 10, Washington TRU Solutions 412-L-082, Rev. E, Adjustable CG Lift Fixture, as part of the report content.
(h) Identify the source of the lifting pin groove locations and widths, as well as pin minimum through-thickness at these locations.
The staff notes that the guidance in section 2.4.10 of NUREG-2216 states that copies of applicable references, if not generally available to the viewer, should be included in the review package. The staff is not familiar with PDD PT00 or the Washington TRU Solutions document 12-L-082, the latter of which is needed to verify the method of load application assumed for the lifting pins. In addition, a source for the payload weight of the inner containment vessel should be cited in the report to allow verification of a key input parameter for the lifting condition evaluation. Staff notes that Ref. 9 SAR table 2.2-1 provides the ICV selfweight; cite as a reference.
As the ICV is sealed and contains a payload of radioactive material, staff expects that some decay heat and internal pressure are present at the time of the ICV lift and transfer from the old to the new outer containment vessel (OCV). Describe the anticipated location and ambient conditions during the transfer; an outdoor transfer may present environmental conditions such as increased ambient temperature and insolation. Per the Rev. 9 SAR section 3.0, the maximum ICV decay heat is 30 W and per the section 3.4.4.3, the ICV maximum normal operating pressure is 50 psig. Maximum temperatures for the ICV determined from thermal analysis of decay heat and insolation conditions are shown in the Rev. 9 SAR table 3.1-1. SAR section 2.1.2 indicates that container allowable stresses are determined employing the load combination guidance of Regulatory Guide 7.8. Justify the omission of decay heat, environmental thermal effects, operating pressure and use of material properties associated with 70 deg. F in the evaluation of the lid stress during lifting.
In report section 3.2, the allowable OCV lid stress during lifting conditions is determined to be 10,000 psi. Justify the determination of allowable lifting load capacity in report section 4.2.1 as the addition of the selfweight of 2215 lbs. (resulting in a Von Mises stress of over 2800 psi, per Figure 6) and the payload weight of 5485 lbs. (resulting in a Von Mises stress of almost 10,000 psi, per Figure 7).
Report section 4.2.2 presents a finite element analysis (FEA) of an individual lifting pin based on its geometry and assumed load application points. From the Rev. 12 707-SAR drawings, the staff is unable to determine the exact location, width and depth of the grooves on the lifting pins as stated in this report section and reflected in the FEA; provide references for this geometrical information. The locations of load application to the pin are stated in the report as being based on information for the ICV lift fixture presented in Washington TRU Solutions, 412-L-082, Rev.
E; provide the pertinent portions of this reference in the report.
This information is necessary to demonstrate compliance with 10 CFR Parts 71.43(f), 71.45(a),
and 71.51(a).
DOE HalfPACT Review - Ops RAIs (Chapter 7)
Operating Procedures 7-1 Clarify in the application section 7.4.4.1, step 2; section 7.4.4.2, step 2; section 8.1.3.5, step 3; section 8.1.3.6, step 2; section 8.1.3.7 step 2; and section 8.2.4.3 that in addition to the assembly requirements as shown in Appendix 1.3.1, Packaging General Arrangement Drawings, of the HalfPACT SAR, the O-ring seals shall meet the requirements of section 4.1.1.1 of this application.
Specifically, section 4.1.1.1 of the application describes requirements for the innermost main O-ring seal of the OCV and the OCV vent port plug O-ring seal that are in addition to the requirements in Appendix 1.3.1 of the HalfPACT SAR. Both O-ring seals must be important-to-safety Category A butyl rubber.
This information is needed to determine compliance with 10 CFR 71.87 and 71.51.