Letter Sequence RAI |
|---|
CAC:001029, (Approved, Closed) EPID:L-2023-LLA-0030, Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement
Results
Other: ML18206A311, ML18317A353, ML18317A355, ML22005A350, ML22006A352, ML22006A353, ML22006A356, ML22278A001, ML23003A046, ML23137A441, ML24204A233, ML24275A093, ML24289A207, ML24305A054, ML24327A249, ML25055A139, ML25078A414, ML25078A416, ML25086A041, ML25086A055, ML25086A244, ML25086A284, ML25087A028, ML25090A330, ML25090A331, ML25112A337, ML25112A339, ML25142A158, ML25161A179, ML25161A181, ML25176A170, ML25178C673, ML25223A188, ML25230A135, ML25253A491, ML25272A064, ML25344A143
|
MONTHYEARML18156A4282018-05-30030 May 2018 Letter from J. Mccann/Columbiana Hi Tech to Document Control Desk Application for Revision of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad (Lr) Transportation Unit Package, Docket No. 71-9291 Project stage: Request ML18206A3112018-07-25025 July 2018 Letter to Mccann Application for Amendment of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad Transport Unit Package - Accepted for Review Project stage: Other ML18264A0022018-09-0707 September 2018 Columbiana Hi Tech, LLC - Certificate Holder Name and Address Change Project stage: Request ML18269A2732018-09-24024 September 2018 Package: Renewal of Certificate of Compliance No. 9291 for the Model No. Liqui-Rad Transport Unit Package Project stage: Request ML19015A3732019-01-10010 January 2019 Tn Americas, LLC - Application for Revision to Certificate of Compliance for USA/9291/B(U)F-96 for the Model No. Lr Transport Unit Project stage: Request ML18317A3532019-02-13013 February 2019 Enclosure 1: Certificate of Compliance No. 9291, Rev No. 11 (Letter to W. Edwards Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD Transport Unit Package) Project stage: Other ML18317A3552019-02-13013 February 2019 Letter to W. Edwards Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD Transport Unit Package (W/Enclosure 2) Project stage: Other ML18317A3522019-02-13013 February 2019 Package: Amendment and Renewal of Certificate of Compliance No. 9291 for the Model No. LIQUI-RAD (Lr) Transport Unit Package Project stage: Request ML20209A3722020-07-27027 July 2020 Notice of Partially Closed Third Pre-Application Meeting with Tn Ammericas LLC for Model No. TN-EAGLE Transportation Package Project stage: Meeting ML22005A3502021-12-14014 December 2021 Email from D. Ortega (NNSA) to N. Garcia (U.S. NRC) Renewal of Certificate of Compliance (CoC) No. 9329 for the Model No. S300 Package Project stage: Other ML22005A3462021-12-14014 December 2021 Transmittal Letter from A. M. Al-Daouk to U.S. Nuclear Regulatory Commission, Renewal Request of the Certificate of Compliance No. 9329 for the Model No. S300 Package Project stage: Request ML22006A3532021-12-27027 December 2021 Enclosure 2: Attachment to Email Dated 11-29-21, Responses to Follow Up Questions, Acceptance Tests for the Lead Ssield of the Shielded Canisters (Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3522021-12-27027 December 2021 Enclosure 3: Email Dated 12/27/21 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Comments on Telephone Call Summary Dated 12/1/21, Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3562021-12-27027 December 2021 Enclosure 5: Clarification Regarding Testing Performed During the Shielded Container Prototype Testing (Drop Tests, Gamma Scans, Destructive Disassembly), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3552022-01-0606 January 2022 12/1/21-Conference Call Summary: Follow Up Questions Related to Shielding RAIs RAI-Sh-5 and -8 (Acceptance Tests, Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages Project stage: RAI ML22020A1872022-01-25025 January 2022 Enclosure 2 - Safety Evaluation Report: Renewal for Certificate of Compliance, Revision 6, the Model No. S300 Package Project stage: Approval ML22278A0072022-09-0808 September 2022 Email from T.E. Sellmer (Nwp) to N. Garcia Santos (NRC) Acknowledgement of Application for CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact Packages Project stage: Request ML25086A0552022-09-30030 September 2022 Redacted, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML22278A0012022-10-0404 October 2022 Email from T. Sellmer (Nwp) to N. Garcia Santos (NRC) Et Al., Delay of RAI Response-CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact CoCs Project stage: Other ML23046A4542023-02-15015 February 2023 Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary Project stage: Request ML23067A4362023-03-16016 March 2023 Application for a Letter Authorization Related to Coc No. 9279, Model No. Halfpact - Accepted for Review - CAC No. 001029, EPID No. L-2023-LLA-0030 Project stage: Other ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization Project stage: RAI ML23003A0462023-03-29029 March 2023 Response to Request for Reviewing a Position Paper from Nuclear Fuel Services, Inc. Related to Applicability of 10 CFR 71.15(C) to Shipment(S) Project stage: Other ML23089A2572023-03-29029 March 2023 Email from Ngarcia Santos (NRC) to T.E. Sellmer (Simco), Subject: Structural and Operations - Staggered RAIs Pertaining to the Halfpact Letter Authorization Project stage: RAI ML23095A1102023-04-17017 April 2023 Transmittal letter-RAI for the Letter Authorization for the Model No. Halfpact Package Project stage: RAI ML23095A1112023-04-17017 April 2023 Enclosure - Requests for Additional Information for the Letter Authorization for the Model No. Halfpact Package Project stage: RAI ML23117A0722023-04-27027 April 2023 Response to Request for Additional Information on the Halfpact Docket No. 71-9279, Request for Authorization of One-Time Shipment of Model No. Crediting the Outer Confinement Vessel as the Containment Project stage: Response to RAI ML23333A0332023-05-30030 May 2023 Email Dated 5-30-23 from T Holly (NFS) to Ngarcia Santos (Nrc), Transmittal of Affidavit Related to Fissile Material Exemption (10 CFR 71.15 (C), Follow Up Questions and Additional Comments (Docket No. 70-143) Project stage: Request ML23137A4412023-06-0202 June 2023 Authorization for Shipment of the Model No. Halfpact Package - Inner Containment Vessel No. 506 Project stage: Other ML25087A0282023-07-0303 July 2023 Enclosure, Letter Dated 7/3/23 from NNSA to NRC, Roadmap, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML23263A1022023-09-20020 September 2023 Email Dated 9-20-23 from N. Garcia Santos (NRC) to J. Mumma (Nnsa), Subject: Package Model No. 453-B--Need Clarification on Submittals Project stage: Approval ML24072A0022024-03-0505 March 2024 Revision of Model No. 435-B Package’S Certificate of Compliance (CoC) Number 9355 for the 435-B Package Project stage: Request ML24295A1602024-06-30030 June 2024 Redacted, Industrial Nuclear Company - Application for Certificate of Compliance for the Inc IR1 00ST, Revision 0, Docket No. 71-9385 Project stage: Request ML24204A2332024-08-0808 August 2024 Acceptance Determination Letter with Observation, Certificate of Compliance No. 9355, Model No. 435-B Project stage: Other ML24248A2532024-09-20020 September 2024 Request for Additional Information, Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Packaging, EPID L-2023-LLA-0102, CAC 001029 Project stage: RAI ML24281A1762024-09-25025 September 2024 9/25/2024 Conference Call Summary - Supplemental Information to Proposed RAI Responses Related to the Criticality Safety Review of the Model No. Castor geo69 Transport and Storage Systems (Docket Nos. 71-9383 and 72-1052, Respectively) Project stage: Supplement ML24312A2212024-10-0101 October 2024 Extension Request - Robatel Technologies’ Response to U.S. NRC Request for Additional Information for Review of the Robatel Technologies, LLC Model No. RT-200 Type B(U) Cask - Cac/Epid Numbers: 001029/L-2024-NEW-0003 Project stage: Request ML24275A0932024-10-11011 October 2024 Transmittal Letter - Certificate of Compliance No. 9310, Revision No. 8, for the Model No. F-431 Transport Package Project stage: Other ML25058A3592024-10-16016 October 2024 Enclosure to Email Dated 10/16/24, Draft Requests for Supplemental Information and Observations, Model No. IR-100ST, CoC No. 9385, Rev. 0 Project stage: Draft Other ML25058A3612024-10-16016 October 2024 Email Dated 10/16/24 from Ngarcia Santos (NRC) to Mrose (Inc) Transmittal of Draft Requests for Supplemental Information and Observations, Thermal and Structural Evaluations, Model No. IR 100ST, CoC No. 9385, Rev. 0 Project stage: Draft Other ML24289A2072024-10-28028 October 2024 Transmittal Letter and Enclosure, Requests for Supplemental Information and Observations for Revision 0 of CoC No. 9385 for the Model No. IR 100ST Project stage: Other ML24305A0542024-10-31031 October 2024 Email Dated 10-31-24 from Ngarcia Santos (NRC) to Mrose (Inc), Final Signed Letter with Requests for Supplemental Information for the Model No. IR 100ST Project stage: Other ML25058A3562024-11-0707 November 2024 Email Dated 11/7/24 from Ngarcia Santos (NRC) to Mrose (Inc)/Gclark (Orano), Follow Up to Requests for Supplemental Information (Rsis) and Observations Discussion on 11/7/24, Thermal and Structural Evaluations, Model No. IR-100ST, CoC No. 9 Project stage: Approval ML25058A3572024-11-21021 November 2024 Transmittal Email Dated 11/21/24 from Ngarcia Santos (NRC) to Mrose (Inc), Summary of Telephone Call Dated 11/7/24 with Inc, Acceptance Review Questions (Rsis and Observations), Thermal and Structural, Model No. IR-100ST, CoC No. 9385, Rev Project stage: Acceptance Review ML24327A2492024-12-0505 December 2024 Enclosure 1 - Certificate of Compliance No. 5086, Revision 17 (Renewal of Certificate of Compliance No. 5086, Model No. Unc 2600 (EPID L-2024-RNW-0024)) Project stage: Other ML24327A2472024-12-0505 December 2024 Enclosure 2 - Safety Evaluation Report, Renewal of Certificate of Compliance No. 5086, Model No. Unc 2600 Project stage: Approval ML25086A0382024-12-0606 December 2024 Letter Dated 12/6/24 from Kschwendenman (NNSA) to Ngarcia Santos (Nrc), Response to Request for Additional Information on Preshipment Leakage Rate Test (Model No. 435-B, Docket No. 71-9355) Project stage: Response to RAI ML25086A0322024-12-0606 December 2024, 9 January 2025, 4 February 2025, 21 February 2025 Responses to Requests for Additional Information for CoC No. 9355, Revision 4, Model No. 435-B (Docket No. 71-9355) Project stage: Request ML25058A3582024-12-0909 December 2024 NRC Form 699, Summary of Telephone Call Dated 11/7/24 with Inc, Acceptance Review Questions (Rsis and Observations), Thermal and Structural, Model No. IR-100ST, CoC No. 9385, Rev. 0 Project stage: Acceptance Review 2023-05-30
[Table View] |
Text
Preliminary Request for Additional Information (RAI)
Docket No. 71-9279 DOE Certificate of Compliance No. 9279 for HalfPACT One-time shipment RAI 2-1 Provide the additional information listed below to supplement that presented in Appendix F, report HPT-CAL-0001, Loaded HalfPACT ICV Lifting Evaluation, which was included as part of the letter titled Request for Authorization of One-Time Shipment of Model No. HalfPACT Crediting the Outer Confinement Vessel as the Containment Boundary (ADAMs accession no.
ML23046A454):
(a) Include the pertinent information from section 3.1.4 of PDD PT00 as part of the report content. This document is mentioned on the cover sheet of the report but is not referenced.
(b) Justify the exclusion of normal conditions of transport (NCT) effects of decay heat, environmental thermal and internal pressure for the structural evaluation of internal containment vessel (ICV) lid lifting sockets and pins during transfer lift conditions.
(c) Provide a description of the anticipated location and ambient conditions during the transfer lift of the ICV from the old outer confinement vessel (OCV) to the new one.
(d) Justify the use of Type 304 stainless steel material properties in the transfer lift evaluation, which appears to have been taken from the 70 deg. F entry on table 2.3-1 of the safety analysis report (SAR), revision 9.
(e) Provide a reference for the ICV 506 payload weight and include in the report.
(f) Justify the addition of the simulated ICV payload weight of a 5485 lbs. to the ICV selfweight of 2215 lbs. to determine the gross allowable lifting capacity of 7700 lbs.
(g) Include the pertinent information from report reference 10, Washington TRU Solutions 412-L-082, Rev. E, Adjustable CG Lift Fixture, as part of the report content.
(h) Identify the source of the lifting pin groove locations and widths, as well as pin minimum through-thickness at these locations.
The staff notes that the guidance in section 2.4.10 of NUREG-2216 states that copies of applicable references, if not generally available to the viewer, should be included in the review package. The staff is not familiar with PDD PT00 or the Washington TRU Solutions document 12-L-082, the latter of which is needed to verify the method of load application assumed for the lifting pins. In addition, a source for the payload weight of the inner containment vessel should be cited in the report to allow verification of a key input parameter for the lifting condition evaluation. Staff notes that Ref. 9 SAR table 2.2-1 provides the ICV selfweight; cite as a reference.
As the ICV is sealed and contains a payload of radioactive material, staff expects that some decay heat and internal pressure are present at the time of the ICV lift and transfer from the old to the new outer containment vessel (OCV). Describe the anticipated location and ambient conditions during the transfer; an outdoor transfer may present environmental conditions such as increased ambient temperature and insolation. Per the Rev. 9 SAR section 3.0, the maximum ICV decay heat is 30 W and per the section 3.4.4.3, the ICV maximum normal operating pressure is 50 psig. Maximum temperatures for the ICV determined from thermal analysis of decay heat and insolation conditions are shown in the Rev. 9 SAR table 3.1-1. SAR section 2.1.2 indicates that container allowable stresses are determined employing the load combination guidance of Regulatory Guide 7.8. Justify the omission of decay heat, environmental thermal effects, operating pressure and use of material properties associated with 70 deg. F in the evaluation of the lid stress during lifting.
In report section 3.2, the allowable OCV lid stress during lifting conditions is determined to be 10,000 psi. Justify the determination of allowable lifting load capacity in report section 4.2.1 as the addition of the selfweight of 2215 lbs. (resulting in a Von Mises stress of over 2800 psi, per Figure 6) and the payload weight of 5485 lbs. (resulting in a Von Mises stress of almost 10,000 psi, per Figure 7).
Report section 4.2.2 presents a finite element analysis (FEA) of an individual lifting pin based on its geometry and assumed load application points. From the Rev. 12 707-SAR drawings, the staff is unable to determine the exact location, width and depth of the grooves on the lifting pins as stated in this report section and reflected in the FEA; provide references for this geometrical information. The locations of load application to the pin are stated in the report as being based on information for the ICV lift fixture presented in Washington TRU Solutions, 412-L-082, Rev.
E; provide the pertinent portions of this reference in the report.
This information is necessary to demonstrate compliance with 10 CFR Parts 71.43(f), 71.45(a),
and 71.51(a).
DOE HalfPACT Review - Ops RAIs (Chapter 7)
Operating Procedures 7-1 Clarify in the application section 7.4.4.1, step 2; section 7.4.4.2, step 2; section 8.1.3.5, step 3; section 8.1.3.6, step 2; section 8.1.3.7 step 2; and section 8.2.4.3 that in addition to the assembly requirements as shown in Appendix 1.3.1, Packaging General Arrangement Drawings, of the HalfPACT SAR, the O-ring seals shall meet the requirements of section 4.1.1.1 of this application.
Specifically, section 4.1.1.1 of the application describes requirements for the innermost main O-ring seal of the OCV and the OCV vent port plug O-ring seal that are in addition to the requirements in Appendix 1.3.1 of the HalfPACT SAR. Both O-ring seals must be important-to-safety Category A butyl rubber.
This information is needed to determine compliance with 10 CFR 71.87 and 71.51.