Letter Sequence RAI |
---|
|
Results
Other: ML22005A350, ML22006A352, ML22006A353, ML22006A356, ML22020A185, ML22020A186, ML22230C920, ML22278A001, ML22312A404, ML22312A405, ML22312A406, ML22319A228, ML22319A229, ML22319A230, ML22319A231, ML23003A046, ML23067A436, ML23137A441, ML23220A156, ML23333A100, ML23333A105, ML24204A233, ML24275A093, ML24275A094
|
MONTHYEARML20209A3722020-07-27027 July 2020 Notice of Partially Closed Third Pre-Application Meeting with Tn Ammericas LLC for Model No. TN-EAGLE Transportation Package Project stage: Meeting ML22005A3462021-12-14014 December 2021 Transmittal Letter from A. M. Al-Daouk to U.S. Nuclear Regulatory Commission, Renewal Request of the Certificate of Compliance No. 9329 for the Model No. S300 Package Project stage: Request ML22005A3502021-12-14014 December 2021 Email from D. Ortega (NNSA) to N. Garcia (U.S. NRC) Renewal of Certificate of Compliance (CoC) No. 9329 for the Model No. S300 Package Project stage: Other ML22006A3522021-12-27027 December 2021 Enclosure 3: Email Dated 12/27/21 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Comments on Telephone Call Summary Dated 12/1/21, Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3532021-12-27027 December 2021 Enclosure 2: Attachment to Email Dated 11-29-21, Responses to Follow Up Questions, Acceptance Tests for the Lead Ssield of the Shielded Canisters (Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3562021-12-27027 December 2021 Enclosure 5: Clarification Regarding Testing Performed During the Shielded Container Prototype Testing (Drop Tests, Gamma Scans, Destructive Disassembly), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3552022-01-0606 January 2022 12/1/21-Conference Call Summary: Follow Up Questions Related to Shielding RAIs RAI-Sh-5 and -8 (Acceptance Tests, Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages Project stage: RAI ML22020A1872022-01-25025 January 2022 Enclosure 2 - Safety Evaluation Report: Renewal for Certificate of Compliance, Revision 6, the Model No. S300 Package Project stage: Approval ML22020A1862022-01-25025 January 2022 Transmittal Letter (Markings) - Certificate of Compliance, Revision 6, and Renewal for the Model No. S300 Project stage: Other ML22020A1852022-01-25025 January 2022 Enclosure 1 - Certificate of Compliance, Revision 6, Model No. S300 Package (Renewal) Project stage: Other ML22319A2282022-08-18018 August 2022 Redacted - August 2022, Revision No. 26 of the Safety Analysis Report for the Model No. TRUPACT-II Package (Docket No. 71-9218) Project stage: Other ML22319A2292022-08-18018 August 2022 Redacted - August 2022, Revision No. 9 of the Safety Analysis Report for the Model No. Halfpact Package (Docket No. 71-9279) Project stage: Other ML22230C9202022-08-18018 August 2022 Nuclear Waste Partnership, LLC, Revision 26 of the Trupact-II Shipping Package Application, and Revision 9 of the Halfpact Shipping Package Application Project stage: Other ML22278A0072022-09-0808 September 2022 Email from T.E. Sellmer (Nwp) to N. Garcia Santos (NRC) Acknowledgement of Application for CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact Packages Project stage: Request ML22256A3062022-09-19019 September 2022 Transmittal Letter- Request for Additional Information, Model Nos. TRUPACT-II and Halfpact Project stage: RAI ML22256A3052022-09-19019 September 2022 Enclosure- Request for Additional Information Model Nos. TRUPACT-II and Halfpact Project stage: RAI ML22278A0012022-10-0404 October 2022 Email from T. Sellmer (Nwp) to N. Garcia Santos (NRC) Et Al., Delay of RAI Response-CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact CoCs Project stage: Other ML22283A0292022-10-10010 October 2022 Nuclear Waste Partnership, LLC, Response to Request for Additional Information on Revision 26 of the Trupact-II Shipping Package Project stage: Response to RAI ML22319A2302022-10-10010 October 2022 Redacted - October 2022, Revision No. 26 of the Safety Analysis Report for the Model No. TRUPACT-II Package (Docket No. 71-9218) Project stage: Other ML22319A2312022-10-10010 October 2022 Redacted - October 2022, Revision No. 9 of the Safety Analysis Report for the Model No. Halfpact Package (Docket No. 71-9279) Project stage: Other ML22320A1042022-11-14014 November 2022 Nuclear Waste Partnership, LLC (Applicant), T Sellmer Comments on Draft Certificate of Compliance No. 9279, Revision 11 Project stage: Draft Other ML22320A1032022-11-15015 November 2022 Email from S. Burns (Nwp) to N. Garcia Santos (Nrc), Subject-IMPORTANT, Courtesy Review, Revised Draft CoCs for the TRUPACT-II and Halfpact Packages Project stage: Draft Other ML22312A4032022-11-21021 November 2022 Enclosure 3 - Safety Evaluation Report-Revision No. 27 of Certificate of Compliance No. 9218, Model No. TRUPACT-II, and Revision No. 11 of Certificate of Compliance No. 9279, Model No. Halfpact, Transport Packages Project stage: Approval ML22312A4042022-11-21021 November 2022 Transmittal Letter-Revision No. 27 of Certificate of Compliance No. 9218, Model No. TRUPACT-II, and Revision No. 11 of Certificate of Compliance No. 9279, Model No. Halfpact, Transport Packages (EPIDs L-2022-LLA-0123 and L-2022-LLA-122) Project stage: Other ML22312A4052022-11-21021 November 2022 Enclosure 2 - Revision No. 11 of Certificate of Compliance No. 9279, Model No. Halfpact Project stage: Other ML22312A4062022-11-21021 November 2022 Enclosure 1 - Revision No. 27 of Certificate of Compliance No. 9218, Model No. TRUPACT-II Project stage: Other ML23046A4542023-02-15015 February 2023 Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary Project stage: Request ML23067A4362023-03-16016 March 2023 Application for a Letter Authorization Related to Coc No. 9279, Model No. Halfpact - Accepted for Review - CAC No. 001029, EPID No. L-2023-LLA-0030 Project stage: Other ML23003A0462023-03-29029 March 2023 Response to Request for Reviewing a Position Paper from Nuclear Fuel Services, Inc. Related to Applicability of 10 CFR 71.15(C) to Shipment(S) Project stage: Other ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization Project stage: RAI ML23333A1052023-04-28028 April 2023 Enclosure 3-2 (Redacted), Email from Tholly (NFS) to Ngarcia Santos (Nrc), NFS Follow Up Questions on NRCs Response to NFS Position Paper on the Applicability of 10 CFR 71.15 to Shipments, Conference Call Summary on 5/22/23 (Docket No. 70-1 Project stage: Other ML23131A1752023-05-15015 May 2023 Notice-Closed Meeting on May 22, 2023 to Discuss Questions About NRCs Response on the Applicability of 10 CFR 71.15 to a Shipment Project stage: Meeting ML23333A0352023-05-22022 May 2023 Enclosure 2, Meeting Agenda, Conference Call Summary, NRC and NFS Closed Meeting on 5/22/23 to Discuss Questions Related to NRCs Response to NFS Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23333A0392023-05-22022 May 2023 Conversation Record NRC Form 699, Conference Call Summary, NRC and NFS Closed Meeting on 5/22/2023 to Discuss Questions Related to NRCs Response to NFS Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23333A0332023-05-30030 May 2023 Email Dated 5-30-23 from T Holly (NFS) to Ngarcia Santos (Nrc), Transmittal of Affidavit Related to Fissile Material Exemption (10 CFR 71.15 (C), Follow Up Questions and Additional Comments (Docket No. 70-143) Project stage: Request ML23333A1002023-05-30030 May 2023 Enclosure 4-2 (Redacted), Affidavit, Trade Secrets or Commercial Information, NFS Follow Up Questions on NRCs Response to NFS Position Paper on the Applicability of 10 CFR 71.15 to Shipments Project stage: Other ML23333A0382023-05-30030 May 2023 Conversation Record NRC Form 699, Conference Call Summary, NRC and NFS Meeting on 5/30/23 to Discuss Follow Up Questions on 5/22/23 Meeting - NFS Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23333A0342023-05-31031 May 2023 Enclosure 1 - Meeting Attendees - Conference Call Summary, NRC and NFS Closed Meeting on 5/22/23 to Discuss Questions Related to NRCs Response to NFS Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23137A4412023-06-0202 June 2023 Authorization for Shipment of the Model No. Halfpact Package - Inner Containment Vessel No. 506 Project stage: Other ML23220A1552023-07-21021 July 2023 Email Dated 7-21-23 from J Mumma (NNSA) to Ngarcia Santos (NRC) Transmittal Letter and Changes Roadmap CoC No. 71-9355, Revision 4, Model No. 435-B Project stage: Other ML23220A1562023-07-21021 July 2023 Road Map for Changes to the Safety Analysis Report Related for Certificate of Compliance No. 9355, Revision 4, Model No 435-B Project stage: Other ML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML23229A2072023-08-17017 August 2023 Notice for a Partially Closed Pre-application Meeting with NAC International to Discuss the NAC Lwt Pre-application Project stage: Meeting ML23249A1532023-08-31031 August 2023 Pre-Application Meeting on NAC Lwt: Iron Clad Fuel Rod Revision Request, August 31, 2023 Project stage: Meeting ML23263A1022023-09-20020 September 2023 Email Dated 9-20-23 from N. Garcia Santos (NRC) to J. Mumma (Nnsa), Subject: Package Model No. 453-B--Need Clarification on Submittals Project stage: Approval ML23258A2142023-10-0202 October 2023 Meeting Summary: Pre-application Meeting on NAC Lwt to Discuss Iron Clad Fuel Rod Revision Request, August 31, 2023 Project stage: Meeting ML24072A0022024-03-0505 March 2024 Revision of Model No. 435-B Package’S Certificate of Compliance (CoC) Number 9355 for the 435-B Package Project stage: Request ML24150A4092024-06-14014 June 2024 Conversation Record -- Clarification Call with NNSA Regarding NRC Staffs Observations Pertaining to Amendment Request for Certificate of Compliance (CoC) No. 9355 for the 435-B Package, Submitted Via Letters Dated July 3, 2023 and March 5, Project stage: Approval ML24295A1602024-06-30030 June 2024 Redacted, Industrial Nuclear Company - Application for Certificate of Compliance for the Inc IR1 00ST, Revision 0, Docket No. 71-9385 Project stage: Request ML24204A2332024-08-0808 August 2024 Acceptance Determination Letter with Observation, Certificate of Compliance No. 9355, Model No. 435-B Project stage: Other 2023-03-16
[Table View] |
|
---|
Category:Letter
MONTHYEARML24248A2532024-09-20020 September 2024 Request for Additional Information, Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Packaging, EPID L-2023-LLA-0102, CAC 001029 ML24204A2332024-08-0808 August 2024 Acceptance Determination Letter with Observation, Certificate of Compliance No. 9355, Model No. 435-B ML24072A0022024-03-0505 March 2024 Revision of Model No. 435-B Package’S Certificate of Compliance (CoC) Number 9355 for the 435-B Package ML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B ML23220A1552023-07-21021 July 2023 Email Dated 7-21-23 from J Mumma (NNSA) to Ngarcia Santos (NRC) Transmittal Letter and Changes Roadmap CoC No. 71-9355, Revision 4, Model No. 435-B ML21340A2502021-10-20020 October 2021 Submittal of Request for Revision of Certificate of Compliance (CoC) Number 9355 for the 435-B Package, Package Identification Number USA/9355/B(U)-96 ML20071H5152020-03-12012 March 2020 Letter - Revision No. 3 of Certificate of Compliance No. 9355 for the Model No. 435-B Transportation Package ML19126A1412019-05-0303 May 2019 Letter to A. M. Al-Daouk Request for Additional Information for Review of the Certificate of Compliance No. 9355, Rev 3, for the Model No. 435-B Packaging (EPID L-2018-LLA-0314) (W/Enclosure) ML19039A2542019-02-0808 February 2019 Letter to A. Al-Daouk Application for the Model No. 435-B Transport Package, Revision 3 - Acceptance for Review ML18145A1092018-05-24024 May 2018 Memorandum to A. Hsia Summary of April 5, 2018, Meeting with the National Nuclear Security Administration to Discuss Regulatory Options to Allow Commercial Entities in the Private Sector to Fabricate and Use the Model Nos.435-B and 380-B(W/ ML18026A8762018-01-26026 January 2018 Letter to A. M. Al-Daouk Revision No. 2 of Certificate of Compliance No. 9355 for the Model No. 435-B Transportation Package 2024-09-20
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24248A2532024-09-20020 September 2024 Request for Additional Information, Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Packaging, EPID L-2023-LLA-0102, CAC 001029 ML19126A1412019-05-0303 May 2019 Letter to A. M. Al-Daouk Request for Additional Information for Review of the Certificate of Compliance No. 9355, Rev 3, for the Model No. 435-B Packaging (EPID L-2018-LLA-0314) (W/Enclosure) 2024-09-20
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Ahmad M. Al-Daouk, Director Office of Packaging and Transportation U.S. Department of Energy National Nuclear Security Administration P.O. Box 5400 Albuquerque, NM 87185
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR REVIEW OF THE CERTIFICATE OF COMPLIANCE NO. 9355, REVISION 4, FOR THE MODEL NO. 435-B PACKAGING - COST ACTIVITY CODE/ENTERPRISE PROJECT IDENTIFICATION NUMBER 001029/L-2023-LLA-0102
Dear Ahmad Al-Daouk:
By letter dated March 5, 2024 [Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML24072A001], the U.S. Department of Energy, National Nuclear Security Administration (NNSA or the applicant), requested a revision to the Certificate of Compliance (CoC) for the Model No. 435-B packaging. In summary, the March 5th letter states that the applicant is requesting approval of the changes depicted in the July 2023 submittal (ML23220A071).
In connection with our review, we need the information identified in the enclosure to this letter.
To assist us in scheduling the NRC staffs review of your response, we request that you provide this information 60 calendar days from the date of this letter. Inform us at your earliest convenience, but no later than 30 calendar days from the date of this letter, if you are not able to provide the information by that time frame. If you are unable to provide a response by then, our review may be delayed.
Please reference Docket No. 71-9355 and CAC/EPID Nos. 001029/L-2023-LLA-0102 in future correspondence related to this request. The NRC staff is available to clarify these questions, and, if necessary, to meet and discuss your proposed responses.
In accordance with Title 10 of the Code of Federal Regulations, Part 2 Agency Rules of Practice and Procedure, a copy of this communication will be available electronically available for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records component of the NRCs ADAMS. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The PDR is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays.
September 20, 2024
A. Al-Daouk If you have any questions regarding this matter, you can contact me at Norma.GarciaSantos@nrc.gov.
Sincerely, Norma Garcia Santos, Project Manager Stotage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 71-9355 Certificate No. 9355
Enclosure:
Request for Additional Information cc:
71bn9355all@listmgr.nrc.gov Signed by Garcia Santos, Norma on 09/20/24
Enclosure Request for Additional Information U.S. Department of Energy National Nuclear Security Administration Docket No. 71-9355 Certificate of Compliance No. 9355 Revision 4 Model No. 435-B By letter dated March 5, 2024 [Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML24072A001], the U.S. Department of Energy, National Nuclear Security Administration (NNSA or the applicant), requested a revision to the Certificate of Compliance (CoC) for the Model No. 435-B packaging.
This request for additional information (RAI) identifies information needed by the U.S. Nuclear Regulatory Commission staff (the staff) in connection with its review of the application.
NUREG-2216, Standard Review Plan for Transportation Packages for Spent Fuel and Radioactive Material," was used by the staff in its review of the application.
This RAI describes information needed by the staff for it to complete its review of the application and to determine whether the applicant has demonstrated compliance with the regulatory requirements of 10 CFR Part 71.
OPERATING PROCEDURES AND CONTAINMENT EVALUATION RAI-7-1 Clarify Section 7.1.3.1 step 10 of the application, related to:
1.
the shipment of Type B contents that has been preceded in shipment by Special Form, Type A contents, Low Specific Activity (LSA) material, or Surface Contaminated Objects (SCO) contents, specifically when the vent port plug cannot be verified as being closed for the Type B contents, and 2.
the performance of an ANSI N14.5 pre-shipment leakage rate test on seals that have been opened.
Section 7.1.3.1, step 10 of the application states the following:
10.
Pre-shipment leakage rate testing of the main containment O-ring seal and vent port sealing washer shall be performed according to the following criteria:
a.
If all of the radioactive material in the 435-B package is contained in sealed sources that have been qualified as special form according to the requirements of Section 7.1.6, Recognition of Special Form, no leakage rate test is required. NOTE: If this criterion is not met, a leakage rate test must be performed according to (b) or (c) of this step.
2 b.
If the main containment (upper) O-ring seal has been replaced or the corresponding sealing surface repaired, or if the vent port plug or sealing washer has been replaced or the mating sealing surface repaired, the leakage rate tests shall be performed according to Section 8.2.2, Maintenance/Periodic Leakage Rate Tests.
c.
If the criteria of step (b) above do not apply, as an option, pre-shipment leakage rate testing may be performed according to Section 7.4, Pre-shipment Leakage Rate Test.
For part 1 of the clarification, package users should consider the following (with underlining for emphasis) from NRC Information Notice (IN) 2016-04, ANSI N14.5-2014 Revision and Leakage Rate Testing Considerations (ML16063A287), which would also apply to special form material as well as Type A contents, LSA material, or SCO. The staff acknowledges that the circumstances described below could be unlikely.
Pre-shipment leakage rate test on Type B package containment boundary components that have been opened: Section 7.6 and Table 1 of ANSI N14.5-2014 address the pre-shipment leakage rate test on Type B package containment boundary components that have been opened. The pre-shipment leakage rate test is necessary to confirm that the containment system is properly assembled for each shipment. Type B packages containing a Type B quantity of material could have been used to transport Type A, LSA material, or SCO in a previous shipment. Containment boundary components (e.g., seals and valves) could have been opened during a previous shipment of Type A contents, LSA material, or SCO, but a pre-shipment leakage rate test might not have been performed at that time. A pre-shipment leakage rate test should be performed on the containment boundary components that cannot be verified as being closed to confirm that the containment system is properly assembled on packages containing a Type B quantity of material.
For part 2 of the clarification, ANSI N14.5 pre-shipment leakage rate testing should be performed on containment boundary seals that have been opened, unless a maintenance/periodic leakage rate test has been performed before each shipment, after the contents are loaded, and the containment system is assembled, in lieu of a pre-shipment leakage rate test. This is especially important for Type B contents in normal form.
This information is needed to determine compliance with 10 CFR 71.37(b),
71.51(a)(1) and (2), and 71.87(c).