Acceptance of the Industrial Nuclear Company Revision No. 0 to Coc No. 9385, Model No. IR-100ST, CAC No. 001029/EPID L-2024-NEW-0008
ML25058A248
Person / Time
Site: 07109385
Issue date: 03/03/2025
From: Garcia-Santos N
Storage and Transportation Licensing Branch
To: Maret Rose
Industrial Nuclear Co
Shared Package
ML25058A247 List:
References
CAC 001029, EPID L-2024-NEW-0008
Download: ML25058A248 (1)


Text

Mike Rose QAM/ARSO Industrial Nuclear Company 14320 Wicks Blvd San Leandro, CA 94577

SUBJECT:

ACCEPTANCE OF THE INDUSTRIAL NUCLEAR COMPANY REVISION NO. 0, TO CERTIFICATE OF COMPLIANCE NO. 9385 FOR THE MODEL NO. IR-100ST

- COST ACTIVITY CODE 001029/ENTERPRISE PROJECT IDENTIFICATION NUMBER L-2024-NEW-0008

Dear Mike Rose:

The U.S. Nuclear Regulatory Commission (NRC) staff has received your submittal dated August 12, 2024 [Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML24295A159], as supplemented on January 24, 2025 (ML25055A138),

requesting revision No. 0 of Certificate of Compliance (CoC) No. 9385 for the Model No.

IR-100ST package design.

The staff performed an acceptance review of your application to determine if the application contained sufficient technical information in scope and depth to allow the staff to complete a detailed technical review. Your submittal has been assigned a Cost Activity Code (CAC)/Enterprise Project Identification (EPID) Number [001029/ L-2024-NEW-0008]. Please reference these numbers and Docket No. 71-9385 in any future correspondence associated with this request.

Please note that the NRC staffs technical review of your submittal may identify issues that could require that you provide additional information. Based on our preliminary evaluation and projection of current review schedules, we anticipate issuing a CoC by September 2025. This schedule includes the issuance, if needed, of a request for additional information (RAI) by May 2025, and receiving your response to the RAI 45 days after its issuance to allow adequate time to provide responses. Please note that these dates could change depending on the findings of our technical review, urgent assignments, or other factors, such as whether your responses to the RAI are or are not adequate. The NRC staff estimates that completing the review of your submittal will require approximately 550 staff-hours. We will promptly communicate significant schedule and/or cost changes, if any.

March 3, 2025

M. Rose 2

In accordance with Title 10 of the Code of Federal Regulations, Part 2 Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records component of the NRCs ADAMS. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The PDR is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays.

If you have any questions regarding this communication, please contact me via email to Norma.GarciaSantos@nrc.gov.

Sincerely, Norma Garcia Santos, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 71-9385 CAC No. 001029 EPID No. L-2024-NEW-0008 Signed by Garcia Santos, Norma on 03/03/25