Letter Sequence Other |
|---|
EPID:L-2023-LLA-0102, Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B (Approved, Closed) |
Results
Other: ML23220A155, ML23220A156, ML24204A233, ML25086A037, ML25086A041, ML25086A055, ML25086A244, ML25086A283, ML25086A284, ML25087A003, ML25087A028, ML25087A076, ML25090A330, ML25090A331, ML25192A250
|
MONTHYEARML25086A0552022-09-30030 September 2022 Redacted, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML25087A0272023-07-0303 July 2023 Transmittal Letter Dated 7/3/23 from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML25087A0282023-07-0303 July 2023 Enclosure, Letter Dated 7/3/23 from NNSA to NRC, Roadmap, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML23220A1562023-07-21021 July 2023 Road Map for Changes to the Safety Analysis Report Related for Certificate of Compliance No. 9355, Revision 4, Model No 435-B Project stage: Other ML23220A1552023-07-21021 July 2023 Email Dated 7-21-23 from J Mumma (NNSA) to Ngarcia Santos (NRC) Transmittal Letter and Changes Roadmap CoC No. 71-9355, Revision 4, Model No. 435-B Project stage: Other ML23263A1022023-09-20020 September 2023 Email Dated 9-20-23 from N. Garcia Santos (NRC) to J. Mumma (Nnsa), Subject: Package Model No. 453-B--Need Clarification on Submittals Project stage: Approval ML25087A0762024-01-24024 January 2024 Transmittal Letter Dated 1/24/24 from Ahmad M. Al-Daouk (NNSA) to Shana Helton (NRC) Related to Canceling the Application Submitted in October 2021 to Revise Certificate of Compliance No. 9355, Model No. 435-B (Docket No. 71-9355) Project stage: Other ML24072A0022024-03-0505 March 2024 Revision of Model No. 435-B Package’S Certificate of Compliance (CoC) Number 9355 for the 435-B Package Project stage: Request ML25087A0032024-03-0505 March 2024 Email Dated 3/5/24 from Jmummas (NNSA) to Ngarcia Santos (Nrc), Cancellation of Application Submitted in 2021 (ML21340A250), Model No. 435-B, Docket No. 71-9355 Project stage: Other ML24150A4092024-06-14014 June 2024 Conversation Record -- Clarification Call with NNSA Regarding NRC Staffs Observations Pertaining to Amendment Request for Certificate of Compliance (CoC) No. 9355 for the 435-B Package, Submitted Via Letters Dated July 3, 2023 and March 5, Project stage: Approval ML24204A2332024-08-0808 August 2024 Acceptance Determination Letter with Observation, Certificate of Compliance No. 9355, Model No. 435-B Project stage: Other ML24248A2532024-09-20020 September 2024 Request for Additional Information, Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Packaging, EPID L-2023-LLA-0102, CAC 001029 Project stage: RAI ML25086A0322024-12-0606 December 2024, 9 January 2025, 4 February 2025, 21 February 2025 Responses to Requests for Additional Information for CoC No. 9355, Revision 4, Model No. 435-B (Docket No. 71-9355) Project stage: Request ML25086A0382024-12-0606 December 2024 Letter Dated 12/6/24 from Kschwendenman (NNSA) to Ngarcia Santos (Nrc), Response to Request for Additional Information on Preshipment Leakage Rate Test (Model No. 435-B, Docket No. 71-9355) Project stage: Response to RAI ML25086A0372025-01-0909 January 2025 Enclosure to Letter Dated 2/21/25 from NNSA to NRC, RAI Response, Road Map of Changes to Safety Analysis Report, Revision. 6.1 (Model No. 435B, Docket No. 71-9355) Project stage: Other ML25086A0412025-02-0404 February 2025 Email Dated 2/2/25 from Jthurgood (NNSA) to Ngarcia Santos (Nrc), Status of Revised SAR Related to RAI Response and Renewal Request, Model No. 435-B, CoC No. 9355, Revision 4 (Docket No. 71-9355) Project stage: Other ML25086A0362025-02-0404 February 2025 Email Dated 2/4/25 from Ngarcia Santos (NRC) to Jthurgood (Nnsa), Request: Status of Submittal of Revised SAR Related to the RAI Response, Model No. 435-B, CoC No. 9355, Revision 4 (Docket No. 71-9355) Project stage: RAI ML25086A2442025-02-21021 February 2025 Redacted, Revised SAR, 435-B Transport Package, Safety Analysis Report, Revision 6.1 (CoC No. 9355, Rev. 4) (Docket No. 71-9355) Project stage: Other ML25086A0342025-02-21021 February 2025 Letter Dated 2/21/25 from Kschwendenman (NNSA) to Ngarcia Santos (Nrc), Response to Request for Additional Information and 435-B Transportation Package, Safety Analysis Report (Docket No. 71-9355) Project stage: Response to RAI ML25086A2842025-02-27027 February 2025 Email Dated 2/27/25 from Kschwendenman (NNSA) to Ngarcia Santos (Nrc), Clarification Renewal Application, CoC No. 9355 (Docket No. 71-9355, EPID No. L-2023-LLA-0102) Project stage: Other ML25086A2832025-02-28028 February 2025 Email Dated 2/28/25 from Ngarcia Santos (NRC) to Kschwendenman (Nnsa), Timely Renewal of CoC No. 9355, Model No. 435-B Project stage: Other ML25115A2382025-04-25025 April 2025 Email Dated 4/25/2025 from Jthurgood (NNSA) to Ngarcia Santos (Nrc), Subject: 1-Year Continuance Request for the 435-B CoC No. 9355, Revision 4 Project stage: Request ML25090A3302025-05-0909 May 2025 Transmittal Letter from Ydiaz Sanabria (NRC) to A. M. Al-Daouk (Nnsa), Renewal and Revision 4 of CoC No. 9355, Model No. 435-B (Docket No. 71-9355) Project stage: Other ML25090A3312025-05-0909 May 2025 Enclosure 1: Certificate of Compliance No. 9355, Revision 4, Model No. 435-B (Docket No. 71-9355) Project stage: Other ML25090A3322025-05-0909 May 2025 Enclosure 2: Safety Evaluation Report, Certificate of Compliance No. 9355, Revision 4, Model No. 435-B (Docket No. 71-9355) Project stage: Approval ML25192A2502025-07-11011 July 2025 Email Dated 7-11-25 from Ngarcia Santos (NRC) to Jthurgood (Nnsa), Subject: Correction, Condition No. 12, Revision 4 of CoC No. 9355 for the Model No. 435-B Project stage: Other 2024-08-08
[Table View] |
Text
From:
Norma Garcia Santos To:
james.mumma@nnsa.doe.gov
Subject:
FW: RE: Docket Number 71-9355 Date:
Friday, July 21, 2023 8:51:00 AM Attachments:
435-B SAR Rev. 6 Roadmap.pdf LTR_NRC_Garcia-Santos_CoC_435-B_SAR_Rev6_20230703.pdf Good morning,
Is there a shipment or a need date associated with this action?
- Thanks, Norma
From: Mumma, James <james.mumma@nnsa.doe.gov>
Sent: Thursday, July 20, 2023 6:27 PM To: Norma Garcia Santos <Norma.GarciaSantos@nrc.gov>
Subject:
[External_Sender] RE: Docket Number 71-9355
Yes Norma here is your courtesy copy. Im still trying to figure out how to connect this support documentation with my original submittal. Thanks.
James
From: Norma Garcia Santos <Norma.GarciaSantos@nrc.gov>
Sent: Wednesday, July 19, 2023 7:16 AM To: Mumma, James <james.mumma@nnsa.doe.gov>
Subject:
[EXTERNAL] RE: Docket Number 71-9355
Good morning, James,
I just received an email informing me about your submittal, but it does not have a cover letter, road map of changes, need date, etc. I need that information to determine the areas of review and the next steps related to processing the action requested. Can you please submit the missing information and send me a courtesy copy?
Thanks in advance, Norma
From: Mumma, James <james.mumma@nnsa.doe.gov>
Sent: Monday, July 10, 2023 3:14 PM To: Norma Garcia Santos <Norma.GarciaSantos@nrc.gov>
Subject:
[External_Sender] Docket Number 71-9355
Good Afternoon Norma,
I submitted our most recent revision to the 435-B Type B package SAR. I had some tech issues with
the e-submittal system and I didnt see the roadmap and request letter upload to the system.
Would it be advisable to upload the request in a different e-submittal or get them to you another route? Thank you.
V/R,
James A. Mumma Package Certification Engineer National Nuclear Security Administration Office of Packaging and Transportation (NA-ESH-11)
P.O. Box 5400 Albuquerque, NM 87185-5400 Office: (505) 845-5715 Cell: (702) 354-7582 Fax: (505) 845-5278 Email: james.mumma@nnsa.doe.gov
This message does not originate from a known Department of Energy email system.
Use caution if this message contains attachments, links or requests for information.