Letter Sequence Other |
---|
CAC:001029, (Approved, Closed) EPID:L-2023-LLA-0102, Transmittal Letter from A. M. Al-Daouk to U.S. Nuclear Regulatory Commission, Renewal Request of the Certificate of Compliance No. 9329 for the Model No. S300 Package (Approved, Closed) |
Results
Other: ML22005A350, ML22006A352, ML22006A353, ML22006A356, ML22020A185, ML22020A186, ML22278A001, ML23003A046, ML23067A436, ML23137A441, ML23220A156, ML23333A105
|
MONTHYEARML20209A3722020-07-27027 July 2020 Notice of Partially Closed Third Pre-Application Meeting with Tn Ammericas LLC for Model No. TN-EAGLE Transportation Package Project stage: Meeting ML22005A3462021-12-14014 December 2021 Transmittal Letter from A. M. Al-Daouk to U.S. Nuclear Regulatory Commission, Renewal Request of the Certificate of Compliance No. 9329 for the Model No. S300 Package Project stage: Request ML22005A3502021-12-14014 December 2021 Email from D. Ortega (NNSA) to N. Garcia (U.S. NRC) Renewal of Certificate of Compliance (CoC) No. 9329 for the Model No. S300 Package Project stage: Other ML22006A3562021-12-27027 December 2021 Enclosure 5: Clarification Regarding Testing Performed During the Shielded Container Prototype Testing (Drop Tests, Gamma Scans, Destructive Disassembly), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3532021-12-27027 December 2021 Enclosure 2: Attachment to Email Dated 11-29-21, Responses to Follow Up Questions, Acceptance Tests for the Lead Ssield of the Shielded Canisters (Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3522021-12-27027 December 2021 Enclosure 3: Email Dated 12/27/21 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Comments on Telephone Call Summary Dated 12/1/21, Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3552022-01-0606 January 2022 12/1/21-Conference Call Summary: Follow Up Questions Related to Shielding RAIs RAI-Sh-5 and -8 (Acceptance Tests, Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages Project stage: RAI ML22020A1852022-01-25025 January 2022 Enclosure 1 - Certificate of Compliance, Revision 6, Model No. S300 Package (Renewal) Project stage: Other ML22020A1862022-01-25025 January 2022 Transmittal Letter (Markings) - Certificate of Compliance, Revision 6, and Renewal for the Model No. S300 Project stage: Other ML22020A1872022-01-25025 January 2022 Enclosure 2 - Safety Evaluation Report: Renewal for Certificate of Compliance, Revision 6, the Model No. S300 Package Project stage: Approval ML22278A0072022-09-0808 September 2022 Email from T.E. Sellmer (Nwp) to N. Garcia Santos (NRC) Acknowledgement of Application for CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact Packages Project stage: Request ML22278A0012022-10-0404 October 2022 Email from T. Sellmer (Nwp) to N. Garcia Santos (NRC) Et Al., Delay of RAI Response-CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact CoCs Project stage: Other ML23046A4542023-02-15015 February 2023 Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary Project stage: Request ML23067A4362023-03-16016 March 2023 Application for a Letter Authorization Related to Coc No. 9279, Model No. Halfpact - Accepted for Review - CAC No. 001029, EPID No. L-2023-LLA-0030 Project stage: Other ML23003A0462023-03-29029 March 2023 Response to Request for Reviewing a Position Paper from Nuclear Fuel Services, Inc. Related to Applicability of 10 CFR 71.15(C) to Shipment(S) Project stage: Other ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization Project stage: RAI ML23333A1052023-04-28028 April 2023 Enclosure 3-2 (Redacted), Email from Tholly (NFS) to Ngarcia Santos (Nrc), NFS Follow Up Questions on Nrc'S Response to Nfs' Position Paper on the Applicability of 10 CFR 71.15 to Shipments, Conference Call Summary on 5/22/23 (Docket No. 70 Project stage: Other ML23333A0352023-05-22022 May 2023 Enclosure 2, Meeting Agenda, Conference Call Summary, NRC and NFS Closed Meeting on 5/22/23 to Discuss Questions Related to Nrc'S Response to Nfs' Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23333A0332023-05-30030 May 2023 Email Dated 5-30-23 from T Holly (NFS) to Ngarcia Santos (Nrc), Transmittal of Affidavit Related to Fissile Material Exemption (10 CFR 71.15 (C), Follow Up Questions and Additional Comments (Docket No. 70-143) Project stage: Request ML23137A4412023-06-0202 June 2023 Authorization for Shipment of the Model No. Halfpact Package - Inner Containment Vessel No. 506 Project stage: Other ML23220A1552023-07-21021 July 2023 Email Dated 7-21-23 from J Mumma (NNSA) to Ngarcia Santos (NRC) Transmittal Letter and Changes Roadmap CoC No. 71-9355, Revision 4, Model No. 435-B Project stage: Other ML23220A1562023-07-21021 July 2023 Road Map for Changes to the Safety Analysis Report Related for Certificate of Compliance No. 9355, Revision 4, Model No 435-B Project stage: Other ML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML23229A2072023-08-17017 August 2023 Notice for a Partially Closed Pre-application Meeting with NAC International to Discuss the NAC Lwt Pre-application Project stage: Meeting ML23263A1022023-09-20020 September 2023 Email Dated 9-20-23 from N. Garcia Santos (NRC) to J. Mumma (Nnsa), Subject: Package Model No. 453-B--Need Clarification on Submittals Project stage: Approval ML23258A2142023-10-0202 October 2023 Meeting Summary: Pre-application Meeting on NAC Lwt to Discuss Iron Clad Fuel Rod Revision Request, August 31, 2023 Project stage: Meeting 2023-02-15
[Table View] |
|
---|
Category:Graphics incl Charts and Tables
MONTHYEARML23220A1562023-07-21021 July 2023 Road Map for Changes to the Safety Analysis Report Related for Certificate of Compliance No. 9355, Revision 4, Model No 435-B 2023-07-21
[Table view] Category:License-Certificate of Compliance (Dkt 71)
MONTHYEARML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B ML23220A1562023-07-21021 July 2023 Road Map for Changes to the Safety Analysis Report Related for Certificate of Compliance No. 9355, Revision 4, Model No 435-B ML23220A1552023-07-21021 July 2023 Email Dated 7-21-23 from J Mumma (NNSA) to Ngarcia Santos (NRC) Transmittal Letter and Changes Roadmap CoC No. 71-9355, Revision 4, Model No. 435-B ML20071H1902020-03-12012 March 2020 Enclosure 1: Certificate of Compliance 71-9355. Rev. 3 ML18026A8752018-01-26026 January 2018 Enclosure 1: Certificate of Compliance No. 9355, Revision No. 2 (Letter to A. M. Al-Daouk Revision No. 2 of Certificate of Compliance No. 9355 for the Model No. 435-B Transportation Package) 2023-07-21
[Table view] |
Text
Roadmap of Detailed Changes Made to the 435-B SAR from Rev. 5.1 to Rev. 6 The table below identifies and summarizes the changes made to the 435-B SAR, Revision 5.1, to create Revision 6. Revision 6 has been created to implement several requests of the client to improve security and operational efficiency. The location and discussion of all changes are provided in the table. All changes are marked in the SAR text with revision bars.
Section Reference Change Comment Section 1.2.1.6.2, and Add option for zinc plating for the disposal canister lid Both galvanizing and zinc plating are appropriate Figures 1.2-19, 1.2-20, closure bolts. corrosion protection for the disposal canister lid bolts.
and 1.2-21 Section 1.2.2 and Section Add sentence to Section 1.2.2 and delete a phrase from Clarify that sources must be sealed and may be in 1.2.2.1 Section 1.2.2.1 relating to the sealed sources. normal form or special form.
Section 1.2.2.3 Correct the maximum decay heat wattage for the IBL Correction of typographical error. The thermal 437 from 15W to 30W. evaluation of the IBL 437 uses the correct wattage of 30W in Section 3.5.5, and no revision to the thermal evaluation is necessary.
Table 1.2-2 Correct maximum activity of the IBL 437 from 5,160 Ci Correction of typographical error. The activity is stated to 5,610 Ci.. correctly in Section 1.2.2.3, and the shielding evaluation of the IBL 437 uses the correct activity of 5,610 Ci in Table 5.5.4-5, and no revision to the shielding evaluation is necessary.
Section 1.3.2 Added reference to Section 7.1.6 to the definition of Clarification.
Special Form Capsule in the glossary.
Drawing 1916-01-01-SAR Updated to Revision 8. Added Flag Note 56 which allows the closure bolt heads to have an opening for a security tool instead of a hex shape as an option.
Drawing 1916-01-05-SAR Updated to Revision 2. Revises General Note 8 to add the baseplate and the rubber pad to the items which may be notched or relieved to accommodate appurtenances on the IBL 437.
Section 2.10 Revise to include a reference to the requirements of This allows the shipper to take advantage of special Section 7.1.6. form under the conditions specified in Section 7.1.6.
1
Roadmap of Detailed Changes Made to the 435-B SAR from Rev. 5.1 to Rev. 6 Section Reference Change Comment Section 7.1.2 Expanded paragraph describing the sections for Clarification.
operational steps for each payload type.
Section 7.1.2.1, Section Delete Section 7.1.2.1, steps 18 through 30, add new Consolidates repetitive procedure steps in a revised 7.1.2.2, Section 7.1.2.3, Step 18: Continue operations at Section 7.1.3, Final Section 7.1.3.
Section 7.1.2.4.2 Preparations for All Shipments.
Delete Section 7.1.2.2, steps 11 through 23, add new Step 11: (ditto)
Delete Section 7.1.2.3, steps 19 through 31, add new Step 19: (ditto)
Delete Section 7.1.2.4.2, steps 22 through 34, add new Step 22: (ditto)
Section 7.1.2.2.1 Added text If possible to substeps #2 and #5. This accommodates the circumstance in which the GC-3000 has been modified for security purposes, by which the auxiliary shield components cannot be removed and the shield plug weld is not accessible.
Section 7.1.3, Section Consolidate operational steps removed from Sections The consolidation of steps removes redundancy and 7.1.3.1, and Section 7.1.2.1, 7.1.2.2, 7.1.2.3, and 7.1.2.4.2, and include new adds clarity to the requirements. The added language 7.1.3.2 language governing the accommodation of special form. regarding special form regulates when a pre-shipment leakage rate test is used. Note, Section 7.1.3.2 is the same as the previous Section 7.1.3.
Section 7.1.6 New section. Added to define the requirements for the acceptance of a source as being in special form.
2