Letter Sequence Approval |
---|
EPID:L-2021-LLA-0075, Request for an Amendment to Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 05000334/LER-2024-004, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations 05000334/LER-2024-002, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation 05000334/LER-2024-001, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000334/20240102024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee 05000412/LER-2023-003-01, Missile Barrier Door Left Open Resulting in a Loss of Safety Function2024-02-20020 February 2024 Missile Barrier Door Left Open Resulting in a Loss of Safety Function IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection 2024-09-17
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24057A0782024-03-0101 March 2024 Amendments to Indemnity Agreements - Enclosure 2 ML24057A0772024-03-0101 March 2024 Conforming License Amendments - Enclosure 1 ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23019A0032023-03-16016 March 2023 – Issuance of Amendment Nos. 320 and 210 Adoption of Technical Specifications Task Force (Tstf) Traveler Tstf-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23062A5212023-03-0606 March 2023 – Issuance of Amendment No. 319 Revise Technical Specification (TS) 3.5.2, ECCS – Operating, Limiting Condition for Operation (LCO) 3.5.2, ML22277A8142022-10-0707 October 2022 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 315 and 205 Regarding Changes to the Emergency Preparedness Plan ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22222A0862022-09-0101 September 2022 Issuance of Amendment Nos. 317 and 208 Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation ML22140A2092022-06-28028 June 2022 Issuance of Amendment No. 207 Correct TS 3.1.7 Change Made by TSTF-547 ML22095A2352022-05-10010 May 2022 Issuance of Amendment Nos. 316 and 206 Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML21286A7822022-05-0606 May 2022 Issuance of Amendment Nos. 315 and 205 Regarding Changes to the Emergency Plan ML22077A1342022-05-0202 May 2022 Issuance of Amendment Nos. 314 and 204 Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21320A3592021-11-23023 November 2021 Correction to License Page 4 ML21197A0092021-11-0101 November 2021 Issuance of Amendment Nos. 313 and 203 Reactor Coolant System, Pressure and Temperature Limits Report ML21214A2752021-10-15015 October 2021 Issuance of Amendment Nos. 312 and 202 Atmospheric Dump Valves ML21153A1762021-06-30030 June 2021 Issuance of Amendment No. 201 Revision of Technical Specifications Related to Steam Generator Tube Inspection, and Repair Methods ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML21070A0002021-03-22022 March 2021 Issuance of Amendment 310, Revise Technical Specification 5.5.5.1, Unit 1 SG Program, to Defer Spring 2021 Refueling Outage Steam Generator Inspections to Fall 2022 Refueling Outage ML20346A0222021-03-10010 March 2021 Issuance of Amendment Nos. 309 and 199 to Change Technical Specifications to Implement New Surveillance Methods for the Heat Flux Hot Channel Factor ML20335A0522021-02-18018 February 2021 Issuance of Amendment Nos. 308 and 198 to Modify Certified Fuel Handler Related Technical Specifications for Permanently Defueled Condition ML21034A3892021-02-18018 February 2021 Correction to Amendment Nos. 307 and 197 to Add Containment Sump Technical Specifications to Address Generic Safety Issue 191 Issues ML21014A3042021-02-0505 February 2021 Correction to Amendment Nos. 306 and 196 to Remove License Conditions B and C Related to the Irradiated Fuel Management Plans ML20345A2362021-01-28028 January 2021 Issuance of Amendment Nos. 307 and 197 to Add Containment Sump Technical Specifications to Address GSI-191 Issues ML21014A1142021-01-12012 January 2021 Correction Letter Notification from Licensee ML20335A0232020-12-28028 December 2020 Issuance of Amendment Nos. 306 and 196 to Remove License Conditions B and C Related to the Irradiated Fuel Management Plans ML20285A2662020-10-21021 October 2020 Correction to Safety Evaluation for Amendment Nos. 305 and 195 Issued September 23, 2020, Modify Primary and Secondary Coolant Activity Technical Specifications ML20213A7312020-09-23023 September 2020 Issuance of Amendment Nos. 305 and 195 to Modify Primary and Secondary Coolant Activity Technical Specifications ML20080H7112020-03-23023 March 2020 Correction Letter for Conforming License Amendments Nos. 304 and 194, Order Approving Transfer of Licenses and Conforming License Amendments ML20030A4402020-02-27027 February 2020 Issuance of Amendment Nos. 304, 194, 299, and 187; Order Approving Transfers of Facility Operating Licenses and Independent Spent Fuel Storage Installation General Licenses and Conforming Amendments ML19326A7592019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Non-Proprietary, Letter & Encl 2-5, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML18348B2062019-02-25025 February 2019 Issuance of Amendment No. 193 Revise Steam Generator Technical Specifications ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18099A2322018-04-18018 April 2018 Correction of an Error in the Renewed Facility Operating License No. DPR-66 Associated with License Amendment No. 301 CAC No. MF3301; EPID L-2013-LLF-0001) ML18022B1162018-03-0101 March 2018 Issuance of Amendment Nos. 302 and 191 Regarding the Use of Optimized Zirlo Fuel Rod Cladding (CAC Nos. MF9580 and MF9581; EPID L-2017-LLA-0201) ML17291A0812018-01-22022 January 2018 Issuance of Amendments Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) ML18016A1032018-01-19019 January 2018 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 300 and 189 (CAC Nos. MF8448 and MF8449; EPID L-2016-LLA-0011 and EPID L-2017-LRO-0069) ML17216A5702017-10-12012 October 2017 Issuance of Amendments Emergency Action Level Scheme Changed Based on NEI 99-01, Revision 6 (CAC Nos. MF8448 and MF8449; EPID L-2016-LLA-0011) ML17221A2802017-08-16016 August 2017 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler 547, Revision 1 ML17157B2842017-06-0707 June 2017 Correction to Conforming Amendment No. 187 Order to Transfer License ML17115A1232017-05-30030 May 2017 Issuance of Amendment Application for Order to Transfer License and Conforming Amendment ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML17081A4332017-04-14014 April 2017 Nonproprietary, Order Approving Transfer of License and Conforming Amendment ML16040A0842016-06-0707 June 2016 FENOC, Beaver Valley Power Station, Unit Nos. 1 and 2; and Davis-Besse Nuclear Power Station, Unit No. 1 - Issuance of Amendments Revision to Technical Specification 5.3.1, Unit Staff Qualifications ML15294A4392015-12-16016 December 2015 Issuance of Amendments License Amendment Request to Revise Steam Generator Technical Specifications (CAC Nos. MF6054 and 6055) ML15302A4332015-12-0101 December 2015 Issuance of Amendments Request to Change Cyber Security Implementation Plan Milestone 8 Completion Date ML15208A2852015-07-28028 July 2015 Correction to Amendment Nos. 294 and 182 Regarding Modification of Emergency Preparedness Plan Regarding the Emergency Planning Zone Boundary 2024-03-01
[Table view] Category:Safety Evaluation
MONTHYEARML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 ML23188A0982023-07-17017 July 2023 – Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23019A0032023-03-16016 March 2023 – Issuance of Amendment Nos. 320 and 210 Adoption of Technical Specifications Task Force (Tstf) Traveler Tstf-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23062A5212023-03-0606 March 2023 – Issuance of Amendment No. 319 Revise Technical Specification (TS) 3.5.2, ECCS – Operating, Limiting Condition for Operation (LCO) 3.5.2, ML22277A8142022-10-0707 October 2022 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 315 and 205 Regarding Changes to the Emergency Preparedness Plan ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22235A7672022-09-0101 September 2022 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 315 and 205 Regarding Changes to the Emergency Preparedness Plan ML22222A0862022-09-0101 September 2022 Issuance of Amendment Nos. 317 and 208 Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation ML22202A4642022-06-29029 June 2022 Emergency Plan Safety Evaluation ML22140A2092022-06-28028 June 2022 Issuance of Amendment No. 207 Correct TS 3.1.7 Change Made by TSTF-547 ML22095A2352022-05-10010 May 2022 Issuance of Amendment Nos. 316 and 206 Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML21286A7822022-05-0606 May 2022 Issuance of Amendment Nos. 315 and 205 Regarding Changes to the Emergency Plan ML22077A1342022-05-0202 May 2022 Issuance of Amendment Nos. 314 and 204 Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22082A2532022-03-29029 March 2022 Correction Letter - Issuance of Authorization of Proposed Alternative to Use ASME OM Code Case OMN-27 ML22012A2972022-01-21021 January 2022 Proposed Alternative to Use ASME OM Code Case OMN-27 ML21197A0092021-11-0101 November 2021 Issuance of Amendment Nos. 313 and 203 Reactor Coolant System, Pressure and Temperature Limits Report ML21214A2752021-10-15015 October 2021 Issuance of Amendment Nos. 312 and 202 Atmospheric Dump Valves ML21153A1762021-06-30030 June 2021 Issuance of Amendment No. 201 Revision of Technical Specifications Related to Steam Generator Tube Inspection, and Repair Methods ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML21070A0002021-03-22022 March 2021 Issuance of Amendment 310, Revise Technical Specification 5.5.5.1, Unit 1 SG Program, to Defer Spring 2021 Refueling Outage Steam Generator Inspections to Fall 2022 Refueling Outage ML20346A0222021-03-10010 March 2021 Issuance of Amendment Nos. 309 and 199 to Change Technical Specifications to Implement New Surveillance Methods for the Heat Flux Hot Channel Factor ML20335A0522021-02-18018 February 2021 Issuance of Amendment Nos. 308 and 198 to Modify Certified Fuel Handler Related Technical Specifications for Permanently Defueled Condition ML20345A2362021-01-28028 January 2021 Issuance of Amendment Nos. 307 and 197 to Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20335A0232020-12-28028 December 2020 Issuance of Amendment Nos. 306 and 196 to Remove License Conditions B and C Related to the Irradiated Fuel Management Plans ML20285A2662020-10-21021 October 2020 Correction to Safety Evaluation for Amendment Nos. 305 and 195 Issued September 23, 2020, Modify Primary and Secondary Coolant Activity Technical Specifications ML20279A4402020-10-0808 October 2020 Energy Harbor Fleet-Beaver Valley Power Station; Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant - Request to Use a Provision of a Later Edition of the ASME Engineers Boiler and Pressure Vessel Code, Section XI ML20213A7312020-09-23023 September 2020 Issuance of Amendment Nos. 305 and 195 to Modify Primary and Secondary Coolant Activity Technical Specifications ML20223A0142020-08-20020 August 2020 Issuance of Relief Request SSR-1, Revision 0, from the Requirements of the ASME Code (EPID L-2020-LLR-0050 (COVID-19)) ML20206K8652020-08-0707 August 2020 Relief Requests 2-TYP-4-RV-06 and 2-TYP-4-RV-07 from the Requirements of the ASME Code (EPID L-2020-LLR-0053 and EPID L-2020-LLR-0054 (COVID-19)) ML20153A0142020-07-16016 July 2020 Relief from the Requirements of the American Society of Mechanical Engineers Code Regarding Request VRR4 (EPID L-2020-LLR-0052 (COVID-19)) ML20145A0002020-06-0303 June 2020 Relief from the Requirements of the ASME Code for Requests VRR6 and VRR5 (EPID L-2020-LLR-0049 and EPID L-2020-LLR-0051 (COVID-19)) ML20080J7892020-04-28028 April 2020 Relief Requests 2 TYP-3-B3.110-1, 2-TYP-3-C2.21-1, 2-TYP-3-C1.30-1, and 2-TYP-3-RA-1 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20079F8162020-03-26026 March 2020 Relief Requests 1-TYP-4-C2.21-1 and 1-TYP-4-RA-1 Regarding Weld Examination Coverage for the Fourth Inservice Inspection Interval ML19336A0282019-12-18018 December 2019 Safety Evaluation Irradiated Fuel Management Plans ML19305B1312019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Enclosure 6, Non-Proprietary Safety Evaluation, Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19275E2942019-10-16016 October 2019 Issuance of Relief Request Proposed Alternative to Reactor Vessel Nozzle Weld Examination Frequency Requirements in Lieu of Specific ASME Code Requirements ML19028A0302019-04-11011 April 2019 FENOC - Beaver Valley Power Station, Unit 1 & 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Approval of Certified Fuel Handler Training and Retraining Program ML18348B2062019-02-25025 February 2019 Issuance of Amendment No. 193 Revise Steam Generator Technical Specifications ML18249A1692018-09-0707 September 2018 Seismic Hazard Mitigation Strategies Assessment (CAC Nos. MF7800 and MF7801; EPID L-2016-JLD-0006) ML18227A7332018-08-27027 August 2018 Request for Relief from the Requirements of the ASME Code ML18205A2922018-08-10010 August 2018 Correction of Errors in Safety Evaluation Associated with Relief Request 2-TYP-4-RV-02 ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18178A1122018-07-0202 July 2018 Relief Request No. 2-TYP-4-RV-02 Regarding the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-729-4 Examination Requirements ML18065A4032018-04-0505 April 2018 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 301 and 190 ML18073A1062018-03-28028 March 2018 Safety Evaluation of Proposed Alternatives 1-TYP-4-BA-01 and TYP-4-BN-01 Regarding the Fourth 10- Year Interval of the Inservice Inspection Program 2024-07-16
[Table view] Category:Technical Specifications
MONTHYEARL-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22095A2352022-05-10010 May 2022 Issuance of Amendment Nos. 316 and 206 Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML21334A0302021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 15, Technical Specifications and Bases ML21197A0092021-11-0101 November 2021 Issuance of Amendment Nos. 313 and 203 Reactor Coolant System, Pressure and Temperature Limits Report ML21214A2752021-10-15015 October 2021 Issuance of Amendment Nos. 312 and 202 Atmospheric Dump Valves ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML21070A0002021-03-22022 March 2021 Issuance of Amendment 310, Revise Technical Specification 5.5.5.1, Unit 1 SG Program, to Defer Spring 2021 Refueling Outage Steam Generator Inspections to Fall 2022 Refueling Outage ML20346A0222021-03-10010 March 2021 Issuance of Amendment Nos. 309 and 199 to Change Technical Specifications to Implement New Surveillance Methods for the Heat Flux Hot Channel Factor ML20335A0522021-02-18018 February 2021 Issuance of Amendment Nos. 308 and 198 to Modify Certified Fuel Handler Related Technical Specifications for Permanently Defueled Condition ML21027A2282021-01-27027 January 2021 License Amendment Request for One-time Deferral of Steam Generator Inspections ML20335A1292020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications L-20-298, Supplement to License Amendment Request: Proposed Change to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition2020-11-0909 November 2020 Supplement to License Amendment Request: Proposed Change to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition ML20213A7312020-09-23023 September 2020 Issuance of Amendment Nos. 305 and 195 to Modify Primary and Secondary Coolant Activity Technical Specifications ML20160A0742020-05-20020 May 2020 2 to Updated Final Safety Analysis Report, Chapter 15, Technical Specifications and Bases ML18022B1162018-03-0101 March 2018 Issuance of Amendment Nos. 302 and 191 Regarding the Use of Optimized Zirlo Fuel Rod Cladding (CAC Nos. MF9580 and MF9581; EPID L-2017-LLA-0201) ML17291A0812018-01-22022 January 2018 Issuance of Amendments Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) ML17216A5702017-10-12012 October 2017 Issuance of Amendments Emergency Action Level Scheme Changed Based on NEI 99-01, Revision 6 (CAC Nos. MF8448 and MF8449; EPID L-2016-LLA-0011) ML17221A2802017-08-16016 August 2017 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler 547, Revision 1 ML16040A0842016-06-0707 June 2016 FENOC, Beaver Valley Power Station, Unit Nos. 1 and 2; and Davis-Besse Nuclear Power Station, Unit No. 1 - Issuance of Amendments Revision to Technical Specification 5.3.1, Unit Staff Qualifications ML15294A4392015-12-16016 December 2015 Issuance of Amendments License Amendment Request to Revise Steam Generator Technical Specifications (CAC Nos. MF6054 and 6055) ML15086A2512015-05-20020 May 2015 Issuance of Amendment Revise Technical Specification 4.3.2, Spent Fuel Storage Minimum Inadvertent Drainage Elevation L-15-026, License Amendment Request to Steam Generator Technical Specifications2015-04-0101 April 2015 License Amendment Request to Steam Generator Technical Specifications ML14322A4612015-03-0606 March 2015 Issuance of Amendments Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative 5b. L-14-300, Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler 4252014-09-21021 September 2014 Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler 425 ML14245A1512014-09-17017 September 2014 Issuance of Amendments Regarding Technical Specification 3.1.3, Moderator Temperature Coefficient Measurement L-12-271, License Amendment Request to Modify Technical Specification 3.1.3, Moderator Temperature Coefficient Measurement (Mtc), to Provide an Exemption Under Certain Conditions2012-07-25025 July 2012 License Amendment Request to Modify Technical Specification 3.1.3, Moderator Temperature Coefficient Measurement (Mtc), to Provide an Exemption Under Certain Conditions L-11-269, Technical Specification 5.6.6.2.1 - Steam Generator Inspection Report2011-09-20020 September 2011 Technical Specification 5.6.6.2.1 - Steam Generator Inspection Report ML1119401232011-07-28028 July 2011 License Amendment, Issuance of Amendment Regarding Approval of the First Energy Nuclear Operating Company Cyber Security Plan L-11-141, License Amendment Request No. 10-021, Replacement of Beaver Valley Power Station Unit No. 1 Spray Additive System by Containment Sump Ph Control System2011-05-27027 May 2011 License Amendment Request No. 10-021, Replacement of Beaver Valley Power Station Unit No. 1 Spray Additive System by Containment Sump Ph Control System ML1108001222011-03-18018 March 2011 Supplement to Spent Fuel Pool Rerack Amendment Request L-11-103, Supplement to Spent Fuel Pool Rerack Amendment Request2011-03-18018 March 2011 Supplement to Spent Fuel Pool Rerack Amendment Request ML1103501622011-02-24024 February 2011 License Amendment, Issuance of Amendment Regarding the Revised Steam Generator Inspection Scope Using F* Inspection Methodology L-10-275, License Amendment Request for Spent Fuel Pool Rerack2010-10-18018 October 2010 License Amendment Request for Spent Fuel Pool Rerack L-10-063, License Amendment Request No. 09-005, Revised Steam Generator Inspection Scope2010-02-26026 February 2010 License Amendment Request No. 09-005, Revised Steam Generator Inspection Scope ML0929503052009-11-0505 November 2009 Technical Specifications, Appendices a, B, and C ML0527202912009-11-0505 November 2009 Current Facility Operating License No. DPR-66, Technical Specifications, Revised 03/02/2018 ML0929200562009-11-0505 November 2009 Renewed Facility Operating License, Appendices a, B, and D L-09-025, ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-03-25025 March 2009 ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. L-08-236, License Amendment Request No. 08-006, Replacement of Beaver Valley Unit No. 2 Spray Additive System by Containment Sump Ph Control System2008-09-24024 September 2008 License Amendment Request No. 08-006, Replacement of Beaver Valley Unit No. 2 Spray Additive System by Containment Sump Ph Control System ML0807300272008-03-11011 March 2008 Technical Specifications to Amend 164 ML0805103742008-02-15015 February 2008 Tech Spec Pages for Amendments 281 and 163 Control Room Envelope Habitibility in Accordance with Technical Specification Task Force Traveler 448 ML0728200762007-10-0505 October 2007 Technical Specifications, Issuance of Amendment Changes to the Recirculation Spray System Pump Start Signal Due to the Containment Sump Screen Modification L-07-074, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3 (License Amendment Request No. 07-008)2007-08-30030 August 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3 (License Amendment Request No. 07-008) ML0717202522007-06-14014 June 2007 Beaver and Perry, Technical Specifications, Issuance of Amendments Modification of Technical Specification Requirements for Inoperable Snubbers ML0703902842007-02-21021 February 2007 Improved Technical Specifications L-07-017, License Amendment Requests Nos. 334 and 2052007-02-0909 February 2007 License Amendment Requests Nos. 334 and 205 L-07-006, Technical Specification 6.9.7 - Steam Generator Inspection Report2007-02-0202 February 2007 Technical Specification 6.9.7 - Steam Generator Inspection Report L-06-172, Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2007-01-11011 January 2007 Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process 2024-09-17
[Table view] |
Text
May 10, 2022
Mr. John J. Grabnar Site Vice President Energy Harbor Nuclear Corp.
Beaver Valley Power Station Mail Stop P-BV-SSEB P.O. Box 4, Route 168 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENT NOS. 316 AND 206 RE: REVISE TECHNICAL SPECIFICATION 5.6.3, CORE OPERATING LIMITS REPORT (COLR)
(EPID L-2021-LLA-0075)
Dear Mr. Grabnar:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment Nos. 316 and 206 to Renewed Facility Operating License Nos. DPR-66 and NPF-73 for the Beaver Valley Power Station, Unit Nos. 1 and 2, (Beaver Valley) respectively. These amendments consist of changes to the technical specifications (TS) in response to your application dated April 26, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML21117A076), as supplemented by letter dated October 27, 2021 (ADAMS Accession No. ML21300A359). The amendments revise TS 5.6.3 to allow the use of feedwater venturis that have been normalized to prior leading-edge flow meter measurements when calculating reactor thermal power.
J. Grabnar
A copy of the related safety evaluation is also enclosed. Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
Brent Ballard, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket Nos. 50-334 and 50-412
Enclosures:
- 1. Amendment No. 316 to DPR-66
- 2. Amendment No. 206 to NPF-73
- 3. Safety Evaluation
cc: Listserv ENERGY HARBOR NUCLEAR CORP.
ENERGY HARBOR NUCLEAR GENERATION LLC
DOCKET NO. 50-334
BEAVER VALLEY POWER STATION, UNIT NO. 1
AMENDMENT TO RENEWED FACI LITY OPERATING LICENSE
Amendment No. 316 Renewed License No. DPR-66
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Energy Harbor Nuclear Corp., acting on its own behalf and as agent for Energy Harbor Nuclear Generation LLC* (the licensees),
dated April 26, 2021, as supplemented by letter dated October 27, 2021, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I.
B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations;
D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- Energy Harbor Nuclear Corp. is authorized to act as agent for Energy Harbor Nuclear Generation LLC and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-66 is hereby amended to read as follows:
(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 316, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION
James G. Danna, Chief Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications
Date of Issuance: May 10, 2022
ENERGY HARBOR NUCLEAR CORP.
ENERGY HARBOR NUCLEAR GENERATION LLC
DOCKET NO. 50-412
BEAVER VALLEY POWER STATION, UNIT 2
AMENDMENT TO RENEWED FACI LITY OPERATING LICENSE
Amendment No. 206 Renewed License No. NPF-73
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Energy Harbor Nuclear Corp., acting on its own behalf and as agent for Energy Harbor Nuclear Generation LLC* (the licensees), dated April 26, 2021, as supplemented by letter dated October 27, 2021, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I.
B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations;
D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- Energy Harbor Nuclear Corp. is authorized to act as agent for Energy Harbor Nuclear Generation LLC and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.
Enclosure 2
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-73 is hereby amended to read as follows:
(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 206, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto and hereby incorporated in the license. Energy Harbor Nuclear Corp. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION
James G. Danna, Chief Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License and Technical Specifications
Date of Issuance: May 10, 2022
ATTACHMENT TO LICENSE AMENDMENT NOS. 316 AND 206
BEAVER VALLEY POWER STATION, UNITS 1 AND 2
RENEWED FACILITY OPERATING LICENSE NOS. DPR-66 AND NPF-73
DOCKET NO. 50-334 and 50-412
Replace the following pages of the Renewed Facility Operating Licenses with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.
Renewed Facility Operating License No. DPR-66
Remove Insert Page 3 Page 3
Renewed Facility Operating License No. NPF-73
Remove Insert Page 4 Page 4
Replace the following page of the Appendix A, Technical Specifications, with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the areas of change.
Appendix A, Technical Specifications
Remove Insert 5.6 - 3 5.6 - 3
(3) Energy Harbor Nuclear Corp., pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;
(4) Energy Harbor Nuclear Corp., pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components;
(5) Energy Harbor Nuclear Corp., pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1:
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level
Energy Harbor Nuclear Corp. is authorized to operate the facility at a steady state reactor core power level of 2900 megawatts thermal.
(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 316, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Auxiliary River Water System
(Deleted by Amendment No. 8)
Amendment No. 316 Beaver Valley Unit 1 Renewed Operating License DPR-66
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations set forth in 10 CFR Chapter 1 and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level
Energy Harbor Nuclear Corp. is authorized to operate the facility at a steady state reactor core power level of 2900 megawatts thermal.
(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 206, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated in the license. Energy Harbor Nuclear Corp. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Amendment No. 206 Beaver Valley Unit 2 Renewed Operating License NPF-73
Reporting Requirements 5.6 5.6 Reporting Requirements
5.6.3 CORE OPERATING LIMITS REPORT (COLR) (continued)
WCAP-16045-P-A, Qualification of the Two-Dimensional Transport Code PARAGON, WCAP-16045-P-A, Addendum 1-A, Qualification of the NEXUS Nuclear Data Methodology, WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, Optimized ZIRLO',
WCAP-17661-P-A, Improved RAOC and CAOC FQ Surveillance Technical Specifications.
As described in reference documents listed above, when an initial assumed power level of 102% of RATED THERMAL POWER is specified in a previously approved method, 100.6% of RATED THERMAL POWER may be used when input for reactor thermal power measurement of feedwater flow is by the leading edge flow meter (LEFM) or feedwater venturi normalized to a prior LEFM flow measurement.
Caldon, Inc. Engineering Report-80P, "Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM TM System" Caldon, Inc. Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate with the LEFM TM System"
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
5.6.4 Reactor Coolant System (RCS) PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR)
- a. RCS pressure and temperature limits for heat up, cooldown, low temperature operation, criticality, and hydrostatic testing, Overpressure Protection System (OPPS) enable temperature, and PORV lift settings as well as heatup and cooldown rates shall be established and documented in the PTLR for the following:
LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," and LCO 3.4.12, "Overpressure Protection System (OPPS)"
- b. The analytical methods used to determine the RCS pressure and temperature limits shall be those previously reviewed and approved by the NRC, specifically those described in WCAP-14040-A, Revision 4, Methodology Used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves, May 2004.
Beaver Valley Units 1 and 2 5.6 - 3 Amendments 316 / 206 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION
RELATED TO AMENDMENT NOS. 316 AND 206 TO RENEWED
FACILITY OPERATING LICENSES NOS. DPR-66 AND NPF-73
ENERGY HARBOR NUCLEAR CORP.
ENERGY HARBOR NUCLEAR GENERATION LLC
BEAVER VALLEY POWER STATION, UNITS 1 AND 2
DOCKET NOS. 50-334 AND 50-412
1.0 INTRODUCTION
By application dated April 26, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21117A076), as supplemented by letter dated October 27, 2021 (ADAMS Accession No. ML21300A359), Energy Harbor Nuclear Corp. (the licensee, Energy Harbor), requested changes to the technical specifications (TS) for Beaver Valley Power Station, Units 1 and 2 (Beaver Valley).
The proposed changes would revise TS 5.6.3, Cor e Operating Limits Report (COLR), to allow the use of feedwater venturis that have been normalized to prior leading edge flow meter (LEFM) measurements when calculating reactor thermal power. Specifically, the requirements of TS 5.6.3.b would be modified such that when an initial assumed power level of 102% of rated thermal power is specified in a previously approved method, as described in reference documents listed in TS 5.6.3.b, 100.6% of rated thermal power may be used when input for reactor thermal power measurement of feedwater flow is by the LEFM or feedwater venturi normalized to a prior LEFM measurement. Currently, TS 5.6.3.b does not permit use of feedwater venturi normalized to a prior LEFM measurement. If approved, section 3.3.8, Leading Edge Flow Meter, of the Beaver Valley Licensing Requirements Manual would be modified to allow the units to remain at rated thermal power for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after the last calorimetric heat balance measurement was performed using the LEFMs only if certain conditions are met.
The supplemental letter dated October 27, 2021, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC) staffs original proposed no significant hazards consideration determination as published in the Federal Register on June 15, 2021 (86 FR 31742).
Enclosure 3
2.0 REGULATORY EVALUATION
The core thermal power must be accurately measured in order to ensure it does not exceed the licensed power level and invalidate the initial assumptions used in the design basis transient and accident analyses. There are two regulations and one generic communication which are most applicable to the proposed changes.
10 CFR 50.36(c)
Section 50.36 of Title 10 of the Code of Federal Regulations (10 CFR) requires that TS be included by applicants for a license authorizing operation of a production or utilization facility.
Paragraph 10 CFR 50.36(c) requires that TS include (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) surveillance requirements; (4) design features; and (5) administrative controls. The proposed change to TS 5.6.3 is within the administrative controls category. The regulations in 50.36(c)(5),
Administrative controls, state that [a]dministrative controls are the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner.
10 CFR Part 50, Appendix K
Nuclear power plants are licensed to operate up to a specified reactor core thermal power limit.
Appendix K to 10 CFR Part 50 requires loss of coolant accident and emergency core cooling system analyses to assume that the reactor has been operating continuously at a power level at least 1.02 times the licensed power level to allow for instrumentation error, with the maximum peaking factor allowed by the technical specifications. Alternately, Appendix K allows an assumption of lower than the specified 102 percent, but not less than the licensed thermal power level, provided the proposed alternative value has been demonstrated to account for uncertainties due to power level instrumentation error.
RIS 2002-03 Guidance on the Content of Measurement Uncertainty Recapture Power Uprate Applications
The NRC issued Regulatory Issue Summary (RIS) 2002-03, Guidance on the Content of Measurement Uncertainty Recapture Power Uprate [MUR-PU] Applications, dated January 31, 2002 (ADAMS Accession No. ML013530183), to provide guidance to licensees seeking an MUR-PU on the basis of improved FW flow measurement. RIS 2002-03 provides guidance to licensees on the scope and detail of the information that should be provided to the NRC staff for MUR-PU license amendment requests (LARs). While RIS 2002-03 does not constitute an NRC requirement, its use aids lice nsees in the preparation of their MUR-PU LAR, while also providing guidance to the NRC staff to conduct its review. The licensee stated in its LAR that its submittal followed the guidance of RIS 2002-03, as it provides the technical basis for allowed outage time of an instrument.
3.0 TECHNICAL EVALUATION
The NRC staff has reviewed the licensees regulator y and technical analyses in support of the proposed changes to the Beaver Valley TS 5.6.3, as described in the application dated April 26, 2021, and supplemented by letter dated October 27, 2021. The NRC staffs technical evaluation is detailed below.
3.1 Introduction
In its LAR, the licensee stated that the core thermal power for Beaver Valley is calculated with a calorimetric energy balance around the plant nuclear steam supply system. The accuracy of this calculation primarily depends on the accuracy of steam generator feedwater flow and feedwater net enthalpy measurements. Both Beaver Valley units previously used venturi meters for feedwater flow measurement and resistance temperature detectors (RTDs) for temperature measurement. However, Beaver Valley license amendment Nos. 243 and 122 for Unit 1 and Unit 2, respectively, allowed the use of more accurate ultrasonic flowmeters to provide these measurements.
At Beaver Valley, the LEFM system consists of an electronic cabinet in the process control area of the plant and a measurement section (spool piece) that is permanently installed in the 26-inch main feedwater header. The LEFM system is a si ngle digital system controlled by software using the ultrasonic transit time method to measure four-line integral velocities at precise locations with respect to the pipe center line. The system numerically integrates the four measured velocities to determine the mass flow rate and fluid temperature. These measurements are used by the plant computer to determine the reactor thermal output.
The Caldon, Inc. Leading Edge Flowmeter TM (LEFM TM) system uses eight transducers in a configuration of two on each of the four acoustic measurement paths in a single plane of the spool piece. The LEFM CheckPlus TM system uses 16 transducers in a similar configuration in 2 orthogonal planes of the spool piece. As such, the LEFM CheckPlus TM system is a combination of two LEFMTM systems taking the average of two numerical integrations of four measurements each in two orthogonal planes. This measurement is inherently more accurate than the integration of four measurements in a single plane by the LEFM TM system and, therefore, should provide a better measurement accuracy. Also, due to twice as many measurements by the LEFM CheckPlus TM system, the error in the statistical treatment of the instrumentation uncertainty is reduced. However, the licensee did not take credit for the improved accuracy and stated only that the LEFM CheckPlus TM system provides feedwater flow measurement that is at least as accurate as that provided by the NRC-approved LEFMTM system.
In its LAR, the licensee stated that the use of the LEFM TM at Beaver Valley, Unit 1 and the LEFM CheckPlusTM at Beaver Valley Unit 2 (hereafter both are referred to as LEFM) in place of the venturi meters and RTDs to measure feedwater flow allowed a reduction in the thermal power measurement uncertainty from 2 percent to 0.6 percent, and therefore, a power uprate of 1.4 percent. Currently, if the LEFM systems are nonfunctional, Beaver Valley Licensing Requirements Manual (LRM) Section 3.3.8, Leading Edge Flow Meter, in part, requires the steady-state thermal power to be reduced to less than or equal to 98.6 percent of rated thermal power if the systems are not restored to functional status prior to the next daily calorimetric heat balance measurement. The mass flow rate and f eedwater temperature are displayed on the local display panel and transmitted to the plant process computer for use in the calorimetric measurement. Alarms are provided in the cont rol rooms to alert operators should the systems require maintenance.
3.2 Items G and H of Section I, Attachment 1 to RIS 2002-03
Items G and H request that licensees provide a proposed allowed outage time (AOT) for the instrument, along with the technical basis for the time selected, and to propose actions to reduce power level if the AOT is exceeded, including a discussion of the technical basis for the proposed reduced power level.
To address Items G and H, the licensee stated, in its LAR, in part, that:
Section 3.3.8, Leading Edge Flow Meter, of the [Beaver Valley Unit 1 and 2] LRMs 1 would be modified to allow the units to remain at rated thermal power for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after the last calorimetric heat balance measurement was performed using the LEFMs only if the following conditions are met:
Thermal power is continuously maintained greater than or equal to 90 percent of rated thermal power since the last LEFM measurement, and
Feedwater flow (used in the calorimetric energy balance calculation) is obtained from venturi-based feedwater flow measurements that have been previously normalized to the appropriate LEFM flow values used in the last calorimetric heat balance based on LEFM measurements.
If the conditions are not met, thermal power would be reduced within one hour to less than or equal to 98.6 percent of rated thermal power steady-state
[2900 MWt] until the LEFM is restored to functional status and the calorimetric heat balance measurement has been performed using the LEFM.
In its email dated September 16, 2021 (ADA MS Accession No. ML21259A164), the NRC staff requested additional information on what the contingency plan will be in the event that the plant process computer fails. In its October 27, 2021, response to the NRC staffs request for additional information, Energy Harbor confirmed that its procedures for performing the daily heat balance does provide for alternative methods including manual calculations if the plant computer is not available.
To support the proposed 72-hour LEFM allowed outage time, Energy Harbor performed an analysis which compared the differences between the LEFM feedwater flow measurement and the venturi-based feedwater flow measurem ent. The NRC staff reviewed the analysis which tracked the difference in those measurements through all seasonal time periods in the course of 1 year. It is important to note that for this analysis, the venturi-based feedwater flow measurement was not corrected or calibrated in any way to better match the LEFM during the one-year analysis window. The results of this ana lysis demonstrate that the difference in the feedwater flow measurement was minimal, even after 1 year, and that the difference in measurement did not change appreciably over any period of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This analysis also demonstrates that any fouling or instrument drift would be minimal over the 72-hour time frame.
1 The LRMs are incorporated into the Beaver Valley Updated Final Safety Analysis Report (UFSAR). Per 10 CFR 50.71(e), the licensee is required to update its UFSARs LRM chapters as described in its application.
The NRC staff finds that by normalizing the venturi-based feedwater flow measurements to the appropriate LEFM value used in the last calorimetric, any small bias in the difference between the LEFM feedwater flow measurement and the venturi-based feedwater flow measurement will be removed. Further, the NRC staff finds that the analysis provided demonstrates that there is reasonable assurance that the venturi-based feedwater flow measurement will result in a measurement of the feedwater flow rate that is within the measurement uncertainty of the LEFMs for at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
The NRC staff also finds the following conservatism in the proposed method:
When initially normalized to the LEFM measurements, the venturi-based measurements would maintain a very similar degree of uncertainty in the heat balance calculations for a time period of more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> as would have been obtained with the venturis which are normalized during that same time period.
The average difference between corresponding LEFM and RTD temperature measurements is similar to the margin already applied to LEFM temperature measurements used for calculating power. Therefore, the proposed amendment would maintain a consistent degree of uncertainty in heat balance calculations during the proposed 72-hour LEFM outage period, thereby assuring that the units would not be operated above their rated thermal power limits.
3.3 Summary
Based on a technical and regulatory review of the proposed changes to the Beaver Valley TS 5.6.3, the NRC staff finds that the proposed Beaver Valley amendment continues to meet the loss of coolant accident and emergency core cooling system analysis assumptions of 10 CFR Part 50, Appendix K and the information provided by the licensee is consistent with the guidance in RIS 2002-03. Additionally, since the TS requirements are derived from the analyses and evaluation included in the licensees safety analysis report, and the staffs technical evaluation concluded that the modified TS change w ould continue to meet the licensees safety analysis, the proposed amendment to TS 5.6.3.b will continue to ensure all applicable limits of the safety analysis are met and continues to meet the administrative controls requirements of 10 CFR 50.36(c)(5) to assure operation of the facility in a safe manner.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Pennsylvania State official was notified of the proposed issuance of the amendments on April 8, 2022. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (86 FR 31742; June 15, 2021).
Accordingly, the amendments meet the eligibility cr iteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: J.S. Kaizer C. Scott
Date: May 10, 2022
ML22095A235 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DSS/SFNB/BC NAME BBallard KZeleznock RLukes DATE 04/05/2022 04/11/2022 03/17/2022 OFFICE NRR/DSS/STSB/BC NRR/DSS/SNSB/BC NRR/DEX/EICB/BC(A)
NAME VCusumano SKrepel RStattel DATE 04/07/2022 04/01/2022 04/11/2022 OFFICE OGC - NLO* NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME JAzeizat JDanna BBallard DATE 04/28/2022 05/05/2022 05/10/2022