Category:Technical Specifications
MONTHYEARL-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22095A2352022-05-10010 May 2022 Issuance of Amendment Nos. 316 and 206 Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML21334A0302021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 15, Technical Specifications and Bases ML21197A0092021-11-0101 November 2021 Issuance of Amendment Nos. 313 and 203 Reactor Coolant System, Pressure and Temperature Limits Report ML21214A2752021-10-15015 October 2021 Issuance of Amendment Nos. 312 and 202 Atmospheric Dump Valves ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML21070A0002021-03-22022 March 2021 Issuance of Amendment 310, Revise Technical Specification 5.5.5.1, Unit 1 SG Program, to Defer Spring 2021 Refueling Outage Steam Generator Inspections to Fall 2022 Refueling Outage ML20346A0222021-03-10010 March 2021 Issuance of Amendment Nos. 309 and 199 to Change Technical Specifications to Implement New Surveillance Methods for the Heat Flux Hot Channel Factor ML20335A0522021-02-18018 February 2021 Issuance of Amendment Nos. 308 and 198 to Modify Certified Fuel Handler Related Technical Specifications for Permanently Defueled Condition ML21027A2282021-01-27027 January 2021 License Amendment Request for One-time Deferral of Steam Generator Inspections ML20335A1292020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications L-20-298, Supplement to License Amendment Request: Proposed Change to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition2020-11-0909 November 2020 Supplement to License Amendment Request: Proposed Change to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition ML20213A7312020-09-23023 September 2020 Issuance of Amendment Nos. 305 and 195 to Modify Primary and Secondary Coolant Activity Technical Specifications ML20160A0742020-05-20020 May 2020 2 to Updated Final Safety Analysis Report, Chapter 15, Technical Specifications and Bases ML18022B1162018-03-0101 March 2018 Issuance of Amendment Nos. 302 and 191 Regarding the Use of Optimized Zirlo Fuel Rod Cladding (CAC Nos. MF9580 and MF9581; EPID L-2017-LLA-0201) ML17291A0812018-01-22022 January 2018 Issuance of Amendments Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) ML17216A5702017-10-12012 October 2017 Issuance of Amendments Emergency Action Level Scheme Changed Based on NEI 99-01, Revision 6 (CAC Nos. MF8448 and MF8449; EPID L-2016-LLA-0011) ML17221A2802017-08-16016 August 2017 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler 547, Revision 1 ML16040A0842016-06-0707 June 2016 FENOC, Beaver Valley Power Station, Unit Nos. 1 and 2; and Davis-Besse Nuclear Power Station, Unit No. 1 - Issuance of Amendments Revision to Technical Specification 5.3.1, Unit Staff Qualifications ML15294A4392015-12-16016 December 2015 Issuance of Amendments License Amendment Request to Revise Steam Generator Technical Specifications (CAC Nos. MF6054 and 6055) ML15086A2512015-05-20020 May 2015 Issuance of Amendment Revise Technical Specification 4.3.2, Spent Fuel Storage Minimum Inadvertent Drainage Elevation L-15-026, License Amendment Request to Steam Generator Technical Specifications2015-04-0101 April 2015 License Amendment Request to Steam Generator Technical Specifications ML14322A4612015-03-0606 March 2015 Issuance of Amendments Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative 5b. L-14-300, Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler 4252014-09-21021 September 2014 Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler 425 ML14245A1512014-09-17017 September 2014 Issuance of Amendments Regarding Technical Specification 3.1.3, Moderator Temperature Coefficient Measurement L-12-271, License Amendment Request to Modify Technical Specification 3.1.3, Moderator Temperature Coefficient Measurement (Mtc), to Provide an Exemption Under Certain Conditions2012-07-25025 July 2012 License Amendment Request to Modify Technical Specification 3.1.3, Moderator Temperature Coefficient Measurement (Mtc), to Provide an Exemption Under Certain Conditions L-11-269, Technical Specification 5.6.6.2.1 - Steam Generator Inspection Report2011-09-20020 September 2011 Technical Specification 5.6.6.2.1 - Steam Generator Inspection Report ML1119401232011-07-28028 July 2011 License Amendment, Issuance of Amendment Regarding Approval of the First Energy Nuclear Operating Company Cyber Security Plan L-11-141, License Amendment Request No. 10-021, Replacement of Beaver Valley Power Station Unit No. 1 Spray Additive System by Containment Sump Ph Control System2011-05-27027 May 2011 License Amendment Request No. 10-021, Replacement of Beaver Valley Power Station Unit No. 1 Spray Additive System by Containment Sump Ph Control System ML1108001222011-03-18018 March 2011 Supplement to Spent Fuel Pool Rerack Amendment Request L-11-103, Supplement to Spent Fuel Pool Rerack Amendment Request2011-03-18018 March 2011 Supplement to Spent Fuel Pool Rerack Amendment Request ML1103501622011-02-24024 February 2011 License Amendment, Issuance of Amendment Regarding the Revised Steam Generator Inspection Scope Using F* Inspection Methodology L-10-275, License Amendment Request for Spent Fuel Pool Rerack2010-10-18018 October 2010 License Amendment Request for Spent Fuel Pool Rerack L-10-063, License Amendment Request No. 09-005, Revised Steam Generator Inspection Scope2010-02-26026 February 2010 License Amendment Request No. 09-005, Revised Steam Generator Inspection Scope ML0929503052009-11-0505 November 2009 Technical Specifications, Appendices a, B, and C ML0527202912009-11-0505 November 2009 Current Facility Operating License No. DPR-66, Technical Specifications, Revised 03/02/2018 ML0929200562009-11-0505 November 2009 Renewed Facility Operating License, Appendices a, B, and D L-09-025, ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-03-25025 March 2009 ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. L-08-236, License Amendment Request No. 08-006, Replacement of Beaver Valley Unit No. 2 Spray Additive System by Containment Sump Ph Control System2008-09-24024 September 2008 License Amendment Request No. 08-006, Replacement of Beaver Valley Unit No. 2 Spray Additive System by Containment Sump Ph Control System ML0807300272008-03-11011 March 2008 Technical Specifications to Amend 164 ML0805103742008-02-15015 February 2008 Tech Spec Pages for Amendments 281 and 163 Control Room Envelope Habitibility in Accordance with Technical Specification Task Force Traveler 448 ML0728200762007-10-0505 October 2007 Technical Specifications, Issuance of Amendment Changes to the Recirculation Spray System Pump Start Signal Due to the Containment Sump Screen Modification L-07-074, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3 (License Amendment Request No. 07-008)2007-08-30030 August 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3 (License Amendment Request No. 07-008) ML0717202522007-06-14014 June 2007 Beaver and Perry, Technical Specifications, Issuance of Amendments Modification of Technical Specification Requirements for Inoperable Snubbers ML0703902842007-02-21021 February 2007 Improved Technical Specifications L-07-017, License Amendment Requests Nos. 334 and 2052007-02-0909 February 2007 License Amendment Requests Nos. 334 and 205 L-07-006, Technical Specification 6.9.7 - Steam Generator Inspection Report2007-02-0202 February 2007 Technical Specification 6.9.7 - Steam Generator Inspection Report L-06-172, Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2007-01-11011 January 2007 Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process 2024-09-17
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23144A3052023-05-23023 May 2023 Updated Final Safety Analysis Report, Revision 34 ML22144A1282022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML22144A1162022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22144A1142022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22144A1312022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Featres ML22144A1302022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22144A1362022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22144A1172022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22144A1192022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML22144A1202022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22144A1292022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering ML22144A1222022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, List of Effective Pages ML22144A1212022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22144A1262022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22144A1332022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22144A1322022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 19, Managing the Effects of Component Aging ML22144A1242022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22144A1232022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22144A1182022-05-18018 May 2022 6 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems L-22-058, Submittal of Revision 26 to Updated Final Safety Analysis Report2022-05-18018 May 2022 Submittal of Revision 26 to Updated Final Safety Analysis Report ML21334A0292021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, List of Effective Pages ML21334A0262021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary ML21334A0352021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Wastes and Radiation Protection ML21334A0312021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 3, Reactor ML21334A0252021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 16, Managing the Effects of Component Aging ML21334A0202021-11-22022 November 2021 Submittal of the Updated Final Safety Analysis Report, Revision 33 ML21334A0222021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML21334A0272021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Appendix B, Seismic Design ML21334A0232021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System ML21334A0332021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis ML21334A0212021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation ML21334A0362021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Appendix a, Quality Assurance ML21334A0372021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML21334A0242021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 5, Containment Systems ML21334A0302021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 15, Technical Specifications and Bases L-21-164, 3 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations2021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations ML21334A0322021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency System ML21334A0392021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML21334A0282021-11-22022 November 2021 3 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20335A1382020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20335A1412020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML20335A1402020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 19, Managing the Effects of Component Aging ML20335A1252020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations L-20-186, 5 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection2020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML20335A1392020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML20335A1202020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML20335A1302020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML20335A1362020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML20335A1372020-11-23023 November 2020 5 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering ML20335A1222020-11-23023 November 2020 Submittal of Revision 25 to Updated Final Safety Analysis Report 2023-05-23
[Table view] |