MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23019A0032023-03-16016 March 2023 Issuance of Amendment Nos. 320 and 210 Adoption of Technical Specifications Task Force (Tstf) Traveler Tstf-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23062A5212023-03-0606 March 2023 Issuance of Amendment No. 319 Revise Technical Specification (TS) 3.5.2, ECCS Operating, Limiting Condition for Operation (LCO) 3.5.2, ML22277A8142022-10-0707 October 2022 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 315 and 205 Regarding Changes to the Emergency Preparedness Plan ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22222A0862022-09-0101 September 2022 Issuance of Amendment Nos. 317 and 208 Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation ML22140A2092022-06-28028 June 2022 Issuance of Amendment No. 207 Correct TS 3.1.7 Change Made by TSTF-547 ML22095A2352022-05-10010 May 2022 Issuance of Amendment Nos. 316 and 206 Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML21286A7822022-05-0606 May 2022 Issuance of Amendment Nos. 315 and 205 Regarding Changes to the Emergency Plan ML22077A1342022-05-0202 May 2022 Issuance of Amendment Nos. 314 and 204 Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21320A3592021-11-23023 November 2021 Correction to License Page 4 ML21197A0092021-11-0101 November 2021 Issuance of Amendment Nos. 313 and 203 Reactor Coolant System, Pressure and Temperature Limits Report ML21214A2752021-10-15015 October 2021 Issuance of Amendment Nos. 312 and 202 Atmospheric Dump Valves ML21153A1762021-06-30030 June 2021 Issuance of Amendment No. 201 Revision of Technical Specifications Related to Steam Generator Tube Inspection, and Repair Methods ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML21070A0002021-03-22022 March 2021 Issuance of Amendment 310, Revise Technical Specification 5.5.5.1, Unit 1 SG Program, to Defer Spring 2021 Refueling Outage Steam Generator Inspections to Fall 2022 Refueling Outage ML20346A0222021-03-10010 March 2021 Issuance of Amendment Nos. 309 and 199 to Change Technical Specifications to Implement New Surveillance Methods for the Heat Flux Hot Channel Factor ML20335A0522021-02-18018 February 2021 Issuance of Amendment Nos. 308 and 198 to Modify Certified Fuel Handler Related Technical Specifications for Permanently Defueled Condition ML21034A3892021-02-18018 February 2021 Correction to Amendment Nos. 307 and 197 to Add Containment Sump Technical Specifications to Address Generic Safety Issue 191 Issues ML21014A3042021-02-0505 February 2021 Correction to Amendment Nos. 306 and 196 to Remove License Conditions B and C Related to the Irradiated Fuel Management Plans ML20345A2362021-01-28028 January 2021 Issuance of Amendment Nos. 307 and 197 to Add Containment Sump Technical Specifications to Address GSI-191 Issues ML21014A1142021-01-12012 January 2021 Correction Letter Notification from Licensee ML20335A0232020-12-28028 December 2020 Issuance of Amendment Nos. 306 and 196 to Remove License Conditions B and C Related to the Irradiated Fuel Management Plans ML20285A2662020-10-21021 October 2020 Correction to Safety Evaluation for Amendment Nos. 305 and 195 Issued September 23, 2020, Modify Primary and Secondary Coolant Activity Technical Specifications ML20213A7312020-09-23023 September 2020 Issuance of Amendment Nos. 305 and 195 to Modify Primary and Secondary Coolant Activity Technical Specifications ML20080H7112020-03-23023 March 2020 Correction Letter for Conforming License Amendments Nos. 304 and 194, Order Approving Transfer of Licenses and Conforming License Amendments ML20030A4402020-02-27027 February 2020 Issuance of Amendment Nos. 304, 194, 299, and 187; Order Approving Transfers of Facility Operating Licenses and Independent Spent Fuel Storage Installation General Licenses and Conforming Amendments ML19326A7592019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Non-Proprietary, Letter & Encl 2-5, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML18348B2062019-02-25025 February 2019 Issuance of Amendment No. 193 Revise Steam Generator Technical Specifications ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18099A2322018-04-18018 April 2018 Correction of an Error in the Renewed Facility Operating License No. DPR-66 Associated with License Amendment No. 301 CAC No. MF3301; EPID L-2013-LLF-0001) ML18022B1162018-03-0101 March 2018 Issuance of Amendment Nos. 302 and 191 Regarding the Use of Optimized Zirlo Fuel Rod Cladding (CAC Nos. MF9580 and MF9581; EPID L-2017-LLA-0201) ML17291A0812018-01-22022 January 2018 Issuance of Amendments Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) ML18016A1032018-01-19019 January 2018 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 300 and 189 (CAC Nos. MF8448 and MF8449; EPID L-2016-LLA-0011 and EPID L-2017-LRO-0069) ML17216A5702017-10-12012 October 2017 Issuance of Amendments Emergency Action Level Scheme Changed Based on NEI 99-01, Revision 6 (CAC Nos. MF8448 and MF8449; EPID L-2016-LLA-0011) ML17221A2802017-08-16016 August 2017 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler 547, Revision 1 ML17157B2842017-06-0707 June 2017 Correction to Conforming Amendment No. 187 Order to Transfer License ML17115A1232017-05-30030 May 2017 Issuance of Amendment Application for Order to Transfer License and Conforming Amendment ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML17081A4332017-04-14014 April 2017 Nonproprietary, Order Approving Transfer of License and Conforming Amendment ML16040A0842016-06-0707 June 2016 FENOC, Beaver Valley Power Station, Unit Nos. 1 and 2; and Davis-Besse Nuclear Power Station, Unit No. 1 - Issuance of Amendments Revision to Technical Specification 5.3.1, Unit Staff Qualifications ML15294A4392015-12-16016 December 2015 Issuance of Amendments License Amendment Request to Revise Steam Generator Technical Specifications (CAC Nos. MF6054 and 6055) ML15302A4332015-12-0101 December 2015 Issuance of Amendments Request to Change Cyber Security Implementation Plan Milestone 8 Completion Date ML15208A2852015-07-28028 July 2015 Correction to Amendment Nos. 294 and 182 Regarding Modification of Emergency Preparedness Plan Regarding the Emergency Planning Zone Boundary ML15086A2512015-05-20020 May 2015 Issuance of Amendment Revise Technical Specification 4.3.2, Spent Fuel Storage Minimum Inadvertent Drainage Elevation ML15078A0582015-04-0808 April 2015 Issuance of Amendment License Amendment Request to Extend Containment Leakage Rate Test Frequency (TACs MF3985 and MF3986) 2023-09-29
[Table view] |
Text
February 5, 2021 Mr. John G. Grabnar Energy Harbor Nuclear Corp.
Beaver Valley Power Station Mail Stop P-BV-SSB P.O. Box 4, Route 168 Shippingport, PA 15077-0004
SUBJECT:
BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - CORRECTION TO AMENDMENT NOS. 306 AND 196 TO REMOVE LICENSE CONDITIONS B AND C RELATED TO THE IRRADIATED FUEL MANAGEMENT PLANS (EPID L-2019-LLA-0155)
Dear Mr. Grabnar:
On December 28, 2020 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML20030A440), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 306 and 196 to Renewed Facility Operating License (RFOL) Nos. DPR-66 and NPF-73 for the Beaver Valley Power Station, Units 1 and 2, respectively. The amendments removed license conditions B and C related to irradiated fuel management plan funding.
Subsequent to the issuance of the amendments, the licensee notified the NRC by e-mail on January 12, 2021 (ADAMS Accession No. ML21014A114), that there were errors in the pages attached to the license amendment.
Specifically, because the Additional Conditions appendices for Units 1 and 2 were amended, the associated RFOL pages for license condition 2.C(10) for Unit 1 and license condition 2.C(11) for Unit 2 should have been included with the amendment. In addition, page 2 of each amendment letter and attachment should have reflected changes to the RFOL license conditions. Lastly, the implementation date on page C-6 for Unit 1 Appendix C, related to Amendment No. 304, incorrectly reflected 7 days instead of 30 days.
The NRC staff has determined that these errors were made inadvertently and has corrected the errors. The corrections do not change any of the conclusions associated with the issuance of Amendment Nos. 306 and 196 and do not affect the associated notice to the public. Accordingly, Enclosures 1 and 2 to this letter provide corrected pages for Amendment No. 306 for Unit 1 and Amendment No. 196 for Unit 2, respectively.
J. Grabnar If you have any questions, I may be reached at 301-415-2328 or by e-mail Jennifer.Tobin@nrc.gov.
Sincerely, Digitally signed by Jennifer C. Jennifer C. Tobin Date: 2021.02.05 Tobin 08:30:56 -05'00' Jennifer C. Tobin, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosures:
- 1. Revised pages for Amendment No. 306 to DPR -66
- 2. Revised pages for Amendment No. 196 to NPF-73 cc: Listserv
ENCLOSURE 1 Corrected Pages for Amendment No. 306 to DPR-66
- 2. Accordingly, the license is amended by removal of Conditions B and C in Appendix C, Additional Conditions, and paragraph 2.C.(10) of Renewed Facility Operating License No. DPR-66 is hereby amended to read as follows:
(10) Additional Conditions The Additional Conditions contained in Appendix C, as revised through Amendment No. 306, are hereby incorporated into this license. Energy Harbor Nuclear Corp. shall operate the facility in accordance with the Additional Conditions.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
James G. Danna, Chief Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Renewed Facility Operating License and Appendix C, Additional Conditions Date of Issuance: December 28, 2020
ATTACHMENT TO LICENSE AMENDMENT NO. 306 BEAVER VALLEY POWER STATION, UNIT NO. 1 RENEWED FACILITY OPERATING LICENSE NO. DPR-66 DOCKET NO. 50-334 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the area of change.
Remove Insert Page 7 Page 7 Replace the following page of the Appendix C, Additional Conditions, with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Remove Insert C-6 C-6
(7) Iodine Monitoring Energy Harbor Nuclear Corp. shall implement a program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions. This program shall include the following:
- 1. Training of personnel,
- 2. Procedures for monitoring, and
- 3. Provisions for maintenance of sampling and analysis equipment.
(8) Backup Method for Determining Subcooling Margin Energy Harbor Nuclear Corp. shall implement a program which will ensure the capability to accurately monitor the Reactor Coolant System subcooling margin. This program shall include the following:
- 1. Training of personnel, and
- 2. Procedures for monitoring.
(9) Steam Generator Surveillance Interval Extension Deleted per License Amendment No. 278.
(10) Additional Conditions The Additional Conditions contained in Appendix C, as revised through Amendment No. 306, are hereby incorporated into this license. Energy Harbor Nuclear Corp. shall operate the facility in accordance with the Additional Conditions.
(11) Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel Amendment No. 306 Beaver Valley Unit 1 Renewed Operating License DPR-66
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE NO. DPR-66 Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC shall comply with the following conditions on the schedules noted below:
Amendment Additional Condition Implementation Number Date 304 Based on the Commissions approval regarding the change in the The parent company issuing a $400 million Support Agreement to amendment Energy Harbor Nuclear Generation LLC, Energy Harbor Nuclear shall be Generation LLC shall comply with the conditions noted below. implemented This $400 million Support Agreement supersedes all previous within 7 days parent support agreements. from date of issuance A. The Support Agreement in the amount of $400 million described in the application dated April 26, 2019, is effective.
Energy Harbor Nuclear Generation LLC shall take no action to void, cancel, or modify the Support Agreement without the prior written consent of the NRC staff. Energy Harbor Nuclear Generation LLC shall inform the Director of the Office of Nuclear Reactor Regulation, in writing, no later than 10 working days after any funds are provided to Energy Harbor Nuclear Generation LLC by Energy Harbor Corp. under the terms of the Support Agreement.
306 B. Deleted.
C. Deleted.
Beaver Valley Unit 1 C-6 Amendment No. 304, 306
ENCLOSURE 2 Corrected Pages for Amendment No. 196 to NPF-73
- 2. Accordingly, the license is amended by removal of Conditions B and C in Appendix D, Additional Conditions, and paragraph 2.C.(11) of Renewed Facility Operating License No. NPF-73 is hereby amended to read as follows:
(11) Additional Conditions The Additional Conditions contained in Appendix D, as revised through Amendment No. 196, are hereby incorporated into this license. Energy Harbor Nuclear Corp. shall operate the facility in accordance with the Additional Conditions.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
James G. Danna, Chief Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Renewed Facility Operating License and Appendix D, Additional Conditions Date of Issuance: December 28, 2020
ATTACHMENT TO LICENSE AMENDMENT NO. 196 BEAVER VALLEY POWER STATION, UNIT NO. 2 RENEWED FACILITY OPERATING LICENSE NO. NPF-73 DOCKET NO. 50-412 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the area of change.
Remove Insert Page 6 Page 6 Replace the following page of the Appendix D, Additional Conditions, with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Remove Insert D-7 D-7
(8) Detailed Control Room Design Review (DCRDR)
Deleted (9) Safety Parameter Display System (SPDS)
Deleted (10) Fire Protection Modifications (Section 9.5.1 of SER Supplement 6)
Deleted (11) Additional Conditions The Additional Conditions contained in Appendix D, as revised through Amendment No. 196, are hereby incorporated into this license. Energy Harbor Nuclear Corp. shall operate the facility in accordance with the Additional Conditions.
(12) Steam Generator Surveillance Interval Extension Deleted (13) Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy
- 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
- 1. Water spray scrubbing
- 2. Dose to onsite responders Amendment No. 194, 196 Beaver Valley Unit 2 Renewed Operating License NPF-73
ML21014A304 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME JTobin JBurkhardt JDanna JTobin DATE 1/14/2021 1/15/2021 2/4/2021 2/5/2021