jM June 3, 1998 l

Mr. Donald A. Reid Senior Vice Pr:sident, Operations Vermont Yankee Nuclear Power Corporation 185 Old Feny Road Brattleboro, VT 05301

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING JET PUMP RISER CIRCUMFERENTIAL WELD INSPECTIONS AT VERMONT YANKEE NUCLEAR POWER STATION (TAC NO. MA1641)

Dear Mr. Reid:

By letter dated May 4,1998, you provided the results of the jet pump riser circumferential weld inspections conduc'ed during the 1998 refueling outage._ in order to complete our review of the weld inspection the following additional information is requested.

- Z factor calcula't ion (Page 3 of Attachment 2)- Please provide the value of the Z factor for SAW welds that was used in the analysis. If you have used an altamative formula for the Z factor, acceptance by the NRC staff will be considered as a long-term issue. The staff notes that it appears that 24" should be used for the "OD" as specified in the ASME Code, and the analysis revised as necessary.

- Loading and load combinations (Page 3 of Attachment 2) - Attachment 2 only listed loading and load combinations that were not considered. Please confirm that, except for the loading and load combinations stated in Attachment 2, all other loading and load combinations listed in BWRVIP-41 have been considered.

-- Measurement uncertainty (Page 5 of Attachment 2)- Please explain how the NDE uncertainty was established.

- Crack growth evaluation (Page 5 of Attachment 2)-Instead of providing the allowable crack size due to flow induced vibration (FIV), please provide the estimated fatigue crack growth due to FIV at the end of the next fuel cycle to be added to the " adjusted flaw sizes".

If you should have any questions regarding this request, please contact me at (301) 415-1475.

Sincerely, Original signed by Richard P. Croteau, Project Manager Project Directorate 1-3 9006 % j f PDR y1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

$DR Docket No. 50-271 g *U p h*p W @ Ante cc: See next page DISTRIBUTION L OsehetMe'h '

M C. Cowgill R. Croteau r i oi" * '8 A. Lee T. Clark l- . PUBLIC 'Q, ,[ h_ k j o
Vermont Yankee r/f ACRS Chia-Fu Sheng

~ J. Zwolinski OGC DOCUMENT'NAME: G:\CroteauWYMA1681.RAI To receive a copy of this document.' indicate in the box: "C" = Copy without-attachment / enclosure '"E" - Copy with attachment / enclosure- "N" = No copy 0FFICE PDI 3/PN - , l- PDI-3/LA_, f A ld, EMCS l0 PD)a'5/D _.rM l NAfE Acroteau - P TCtark M /- TSulliven 6E 4W f DATE h/b /98 (o/ cl /98 @ / 'L. /98 " L / 4 /9s 0FFICIAL RECORD CUPT '

k

~ 'I D. Reid Vermont Yankee Nuclear Power Station cc:

Regional Administrator, Region i Mr. Raymond N. McCandless U. S. Nuclear Regulatory Commission Vermont Division of Occupational 475 Allendale Road and Radiological Health King of Prussia, PA 19406 Administration Building Montpelier,VT 05602 Mr. David R. Lewis Shaw, Pittman, Potts & Trowbridge Mr. Gautam Sen 2300 N Street, N.W. Licensing Manager Washington, DC 20037-1128 Vermont Yankee Nuclear Power Corporation Mr. Richard P. Sedano, Commissioner 185 Old Feny Road Vermont Department of Public Service Brattleboro,W 05301 120 State Street,3rd Floor Montpelier, VT 05602 Resident inspector Vermont Yankee Nuclear Power Station Public Service Board U. S. Nuclear Regulatory Commission State of Vermont P.O. Box 176 120 State Street Vemon, VT 05354 Montpelier, VT 05602 Mr. Peter LaPorte, Director Chairman, Board of Selectmen ATTN: James Muckerheide Town of Vemon Massachusetts Emergency Management P.O. Box 116 Agency Vemon, VT 05354-0116 400 Worcester Rd.

P.O. Box 1496 Mr. Richard E. McCullough Framingham, MA 01701-0317 Operating Experience Coordinator Vermont Yankee Nuclear Power Station Jonathan M. Block, Esq. l P.O. Box 157 Main Street l

Govemor Hunt Road P. O. Box 566 Vemon, VT 05354 Putney, W 05346-0566 G. Dana Bisbee, Esq. Mr. Michael J. Daley Deputy Attomey General Trustee and Legislative Representative 33 Capitol Street New England Coalition on Nuclear Concord, NH 03301 6937 Pollution, Inc Box 545 Chief, Safety Unit Brattleboro, VT 05301 Office of the Attomey General One Ashburton Place,19th Floor Mr. Michael J. Daly Boston, MA 02108 Trustee and Legislative Representative New England Coalition on Nuclear Ms. Deborah B. Katz Pollution, Inc.

Box 83 P.O. Box 545 Shellbume Falls, MA 01370 Brattleboro, VT 05302