APPENDIX A NOTICE OF VIOLATION Omaha Public Power District Docket:
50-285/87-17 Fort Calhoun Station License:
DPR-40 During an NRC inspection conducted on June 8-12, 1987, a violation of NRC requirements was identified. The violation involved a failure to identify and evaluate an as-found over thrust condition in Limitorque valve operators.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987), the violation is listed below:
10 CFR 50, Appendix B, Criterion XV and XVI as implemented by the OPPD Quality Assurance Manual QADP-17 states, ir part, " Measures shall be established to control materials, parts, or components which do not conform to requirements in order to prevent their inadvertent use...
Measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected...."
Contrary to the above, measures were not established to identify and control the use of Limitorque valve operators which were found to have thrust switches set so that thrust limits of the operators had been j
exceeded.
This is a Severity Level IV violat h.
(Supplements)(285/8717-02)
Pursuant to the provisions of 10 CFR 2.201, Omaha Public Power District is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, I
including for each violation:
(1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achieved, I
1 l
(3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, l
consideration will be given to extending the response time.
Dated at Arlington, Texas this 1st day of July 1987 8707070264 870701 PDR ADOCK 0500 5
0 e-_________-__________________