ML20234D542

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-285/87-17 on 870608-12 & Notice of Violation.One Unresolved Item Also Identified in Paragraph 2.a.(2) of Encl Insp Rept
ML20234D542
Person / Time
Site: Fort Calhoun 
Issue date: 07/01/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20234D544 List:
References
IEB-85-003, IEB-85-3, IEIN-86-029, IEIN-86-29, NUDOCS 8707070250
Download: ML20234D542 (3)


See also: IR 05000285/1987017

Text

_

_ _ _ _ _ -

-

.

In Reply Refer To:

E

Docket:

50-285/87-17

Omaha Public Power District

ATTN:

R. L. Andrews, Division Manager-

Nuclear Production

1623 Harney Street

Omaha, Nebraska

68102

Gentlemen:

This refers to the inspection conducted by Mr. D. E. Norman of this office

during the period June 8-12, 1987, of activities authorized by NRC Operating

License DPR-40 for the Fort Calhoun Station, and to the discussion of our

findings with you and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included your actions relative to IE

Bulletin (IEB) 85-03, IE Notice (IEN) 86-29, and previously identified

inspection finding 285/8616-01. Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, and observations by the NRC inspector. The inspection findings

are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

One unresolved item is identified in paragraph 2.a.(2) of the enclosed

inspection report.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

C:ESk'dhDRHunter

RSB/ES

C

/B

C:RSB

RElrelan

TFWesterman

)jdEGagliardo

DENorman/tw

[f p//87

}/(/87

f go/87

\\ h /g /87

g/$0/87

/

/

WEEEERgiggg;,

1

go /

ed

\\p

_ _ _ _ _ _ _ _ _ _ _ _ _

}

-

.

l

!

I

Omaha Public Power District

-2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed by:

R.E. HALL

J. E. Gagliardo, Chief

Reactor Projects Branch

.,

i

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-285/87-17

cc w/ enclosures:

W. G. Gates, Manager

Fort Calhoun Station

P. O. Box 399

Fort Calhoun, Nebraska

68023

l

l

Harry H. Voigt. Esq.

LeBoeuf Lamb, Leiby & MacRae

j

1333 New Hampshire Avenue, NW

j

Washington, D. C.

20036

Kansas Radiation Control Program Director

I

Nebraska Radiation Control Program Director

)

l

!

l

l

l

_ _ _ _ _ _ . _ . _ _ _ _ _ _ _ . _

]

1

4

Omaha Public Power District

-3-

{

l

l

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB
  • RRI

R. D. Martin, RA

i

i

RPSB

  • Section Chief (RPB/B)
  • MIS System
  • RIV File

DRSP

  • RSTS Operator
  • RSB
  • Project Inspector, RPB
  • D. Weiss, RM/ALF

i

  • R. Hall

NRR Project Manager

  • D.

Norman

j

  • R. Ireland
  • w/766

)

l

l

l

l

.

-_---- _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ .