Notice of Violation from Insp on 921122-930102.Violation Noted:Licensee Failed to Comply W/Requirements of Standing Order SO-0-20 by Performing Inadequate Review of Danger Tagout 92-2455
ML20127K081
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/19/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20127K074 List:
References
50-285-92-33, NUDOCS 9301260034
Download: ML20127K081 (2)


Text

,

APPENDILA NOTICE Of VIOLATION Omaha Public Power District Docket:

50-285 fort Calhoun Station License:

DPR-40 During an NRC inspection conducted on November 22, 1992, through January 2, 1993, a violation of likC requirements was identified.

In accordance with the

" General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C, the violation is listed below:

10 CfR Part 50, Appendix B, Criterion V, and the fort Calhoun Quality Anurance Plan, Revision 3, Section 2.1, Paragraph 4.2.1, require, in part, that activities affecting quality shall be prescribed by documented instruct ions or procedures and shall be accomplished in accordance with these instructions or procedures.

Section 4.1.18 of Standing Order 50-0-20 states, in part, that extensive tag outs may require more than one sheet and, in this case, should be thoroughly checkad to ensure that nothing has been overlooked.

The tag out review shall also include the return to service positions.

The shift supervisor, or his designate, will sign the tag sheet to show his revies and approval.

Contrary to the above, on December 3, 1992, the licensee failed to co.nply with the requirements of Standing Order 50-0-20 by performing an inadequate review of Danger Tagout 92-2455, thus failing to identify the incorrect return-to-service valve position for Valve FW-1055.

This resulted in the overpressurization of the steam generator blowdown processing system, actuation of the fire suppression deluge dry-pipe system in Room 19, and ultimately treatica of a condition that caused the inoperability of motor-driven fire Pump FP-1 A.

lhis is a Severity level IV violatlon.

(Supplement 1) (285/9233-01)

Pursuant to the provisions of 10 CFR Part 2.201, the Omaha Public Power District is hereby rcquired to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, AllN:

Document Control Desk, Washington, D.C. 20555, with a copy to the Regional Administrator, Region IV, a copy to the llRC Resident Inspector at the facility that is the subject of this notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

This reply should be clearly marked as a " Reply to a Notice of Violatlon" and should include for each violation:

(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliante will be achieved.

if an adequate reply is not received within the time specified in this Notice, an order or demand for information may be issued as to why the license should not be modified, I

9301260034 930119 PDR ADOCK 05000205 0

PDR

)

i 2

suspended, or revoked, or why such other action as may be proper should not be i

taken.

Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas, this 19th day of January 1993 4

1 1

I l

l.

- r L

1 a

I l

l b

-r I

.E-.e-+

.....i.+.....-.w.-~,

, - -, -.. -. ' -,m..

, - ~.

ee r..#-.

..m..+-:....-,..,-_,-,,,,w%,...., >..,..--mm.m y

-r....

v..,

e--,..

r--~4,*

-