Omaha Public Power District Docket:
50-285 Fort Calheun Station Operating License:
OPR-40 t
During an NRC inspection conducted on November 14-18, 1988, a violation of NRC requirements was identified. The violation involved failure to follow instructions.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2. Appendix C (1988), the I
violation is listed below:
Criterion V of Appendix B to 10 CFR Part 50 and the licensee's approved i
quality assurance program descriptica require that activities affecting i
quality shall be prescribed by documented instructions and shall be accomplished in accordance with these instructions.
i The weld data form specified in Modification Package MR-FC-88-60 and the i
visual inspection instructions of Procedure QDP-20 Appendix G require that the flare bevel welds shall be flush with the joint member.
4 Contrary to the above, the NRC inspector observed that four Quality Control (QC) accepted flare bevel welds in Modification Package MR-FC-88-60, which were identified on Drawing No. A-5606 as Welds VAS-79-7 through VAS-79-10, were less than flush. The welds were reinspected by QC at the i
request of the NRC inspector and determined to be less than flush by 3/32
(
to 1/8 inch.
l This is a Severity Level IV violation.
(Supplement I)(285/8843-02) t Pursuant to the provisions of 10 CFR 2.201, Omaha Public Power District is hereby required to submit a written statement or explanation to this Office within 30 days of the date of the letter transmitting this Notice.
This reply, i
should include for each violation:
(1) the reason for the violation if l
admitted (2) the corrective steps that have been taken arid the results achieved. (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good 7
cause is shown, consideration will be given to extending the response time.
i I
Dated at Arlington, Texas, I
this j g day of g y, g' %,1988 i
\\
k5 pp KO O PDv 0