- p$3 L MEMORAtlDUM FOR: Mark Hartzman i
Mechanical Engineering Branch p
FROM:
Robert J. Bosnak, Chief Mechanical Engineering Branch
SUBJECT:
ASSIGt;MEtiT AS TEAM LEADER: DIABLO CAtlY0l1 SMALL BORE PIPIrlG REVIEW TEAM You are designated as team leader of the Small Bore Piping Review Team.
The team will consist of yourself as team leader, I. Yin, Region III as team member, and technical assistance contract personnel from Bill as team members.
You and the other team members should make travel plans to visit the site (San Luis Obispo), Region V (Walnut Creek), PGE/Bechtel (San Francisco) and IDVP offices of R. Cloud (. Berkeley) on an itinerary established by you to investigate, as necessary, the facts required to substantiate the. allegations which appear below.
You should plan to depart about January 3,1984 and attempt to conclude your activities by January 14, 1984 The principal small bore piping allegation is number 55. Other allega-tions which influence small bore piping design and are, therefore, assigned to your team for evaluation in addition to number 55 are the following numbers:
78, 79, 82, 85, 86, 87, 88, 89, 97 and 95.
In carrying out your assignment, the end product should be an evaluation of the collective effect of those of the allegations which are found to be substantiated on the performance of the small bore piping of Diablo Canyon Unit 1, presenting conclusions regarding such performance, and recommendations for operation at 5% and higher levels of power generation.
The IDVP program results should be reconciled with your conclusions should they differ, f
rt J. Bosnak, Chief Mechanical Engineering Branch Division of Engineering cc:
see next page I
'O
$70nqosr) p Aff'
a
. M. Hartzman 2-cc:
R. Vollmer J. Knight G. Lear T. Novak B. Buckley H. Schierling J. Keppler, RIII J. Martin, RV T. Bishop, RV
- D. Danielson, RIII
- 1. Yin, RIII M. Reich, BNL F. Cherny H. Brammer S
4
+
,W y
~
+
f CLtiq*p
-e UNITED STATES y y ', y.qf( g
' NUCLEAR REGULATORY COMMISSION g
J "df C
WASHING 70N,0. C. 20555 Y%W /e/
gv Docket No. S0-275 DEC 3 01982 MEMORANDUM FOR: George W. Knighton, Chief Licensing Branch #3, DL FROM:
Hans Schierling, Project Manager Licensing Branch #3, DL
SUBJECT:
MEETING NOTICE - DIABLO CANYON DESIGN VERIFICATION PROGRAM - SITE VISIT AND STATUS MEETING DATE a TIME:
nuary 12,1982 - 8:35 ~a.m.-2:30 p.m.:
Site Visit
~
o January 13, 1982 - 9:00 a.m.-3:00 p.m.:
Status Me %
LOCATION:
Site Visit: Diablo Canyon site near San Luis Obispo, Calif.
Status Meeting:,}EOffices,77BealeStreet,SanFrancisco, PG&
California gg PURPOSE:
Site Visit: NRC (NRR, OGC and OPE) will tour Diablo Canyon
~
Unit 1 to observe modifications completed, in progress, and planned.
Status Meeting: PG&E/Bechtel and IDVP (Teledyne et al.)
will brief and discuss with NRC the status of design verification effort in Phase I and Phase II.
PARTICIPANTS:
NRC Site Visit:
H. Schierling, et. al.
Status Meeting:
D. Eisenhut, et al.
PG&E Site Visit:
H. Friend, et al.
Status !!ceting:
G. Maneatis, et al.
Teledyne Status Meeting:
W. Cooper, et al.
NOTES:
1.
Parties other than those identified who intend to participate in the Site Visit should notify PG&E promptly.
2.
A verbatim transcript wi 1 be taken of the Status fleeting.
K%)
.)
kahs Schierling, Project Manager Division of Licensing
[
Contact:
H. Schierling, (NRC) 301-492-7238 0'
f J. Hoch (PG&E) 415-768-0881 M c: See next page D30
~
Qpp-
~-
c
-i 4.s
.c DIABLO CANYON PLANT VISIT WITH NRC AND OTHERS' JANUARY 12, 1983-l; 3c s
1.
Control Room E01 8017 -- HVAC Bus Transfer Switch-Discussed operation and redundancy of the pressurization system.
Discussed redundant fans and nonredundant. filters in the ventilation equipment room above the control room.
t 2.
Cable Spreading Room E0I 8043 -- Monitor Light Box Main Annunciator Cable Separation s
3.
Switchgear Room E0I 8042 -- Panels PY-11 and 13 Discussed the operation of the circuit brea'kers which transfer vital 120V AC power from the nomal source to the backup source. s Reviewed vital 125V DC and 120V AC instrument buses and panels.
Discussed separation of backup power to the instrument AC system.
i 4.
Auxiliary Building Feedwater Pump Room E0I 8019 -- Fire Protection (FCV-95 circuitry)
Reviewed valve lineup for the turbine driven pump.
~
Component Cooling hater System Pump Area Conducted walkdown of the CCWS; special attention placed on the post-LOCA sample coolers (supply and return), and the "c" header isolation valve (FCV-355).
LS:1682A
..,, ~, - - -. - -,
5 Y
5.
Turbine Building (No E0I)
Looked at the control room pressurization system fans and ducts; also the diesel engine exhaust pipes.
1 6.
4KY Switchgear and Cable Spreading Rooms -
E01 8039 -- Fire Protection (openings in floor) 7.
Diesel Generator E0I 8045 -- Diesel Generator Control Circuit Separation Looked at engine air intake pipe and filters, and tornado barriers.
8.
Intake Structure it.
O 5
s I
r
' ' L' i
s t
LS:1682A j
u i
a 0
Ofablo Canyon f
.Mr. Malcolm' H. Furbush.
Vice President - General Counsel Pacific Gas & Electric Company P. O. Box 7442 4.
San Francisco, California 94120 n
cc: Philip A. Crane, Jr., Esq.'
Resident Inspector /Diablo Canyon NPS Pacific Gas & Electric Company c/o U. S. Nuclear _ Regulatory'Comissic P. O. Box 7442-P. 0. Box 369 San Francisco, California 94120.
Avila Beach, California 93424 2
Janice E. Kerr, Esq.
Ms. Raye Fleming-California Public Utilities Commission 1920 Mattie Road -
350 McAllister Street Shell Beach, California. 93440 San Francisco, California 94102 3
Joel Reynolds, Esq.
Mr. Frederick Eissler, President John R.' Phillips, Esq.
Scenic Shoreline Preservation Center for Law in the Public Interest Conferance. Inc.
10951 West Pico Boulevard 4623 More Mesa Drive Third Floor.
Santa Barbara, California 93105 Los Angeles, California 90064 Ms. Elizabeth Apfelberg Paul C. Valentine, Esq.
.1415 Cozadero 321 Lytton Avenue San Luis Obispo, CA 93401 Palo Alto, California 94302-Mr. Gordon A. Silver Mr. Byron S. Georgiou Ms. Sandra A. Silver' Legal Affairs Secretary 1760 Alisal Street Governor's Office San Luis Obispo, CA 93401 State Capitol Sacramento, California. 95B14 Harry M. Willis, Esq.
Seymcur & Willis Herbert H. Brown, Esq.
601 Californi' Street, Suite' 2100 Hill, Christopher & Phillips, P.C.
San Francisco, i; 94108 1900 M Street, N.W.
Washington, D. C.
20036 Mr. Richard Hubbard MHB Technical Associates Mr.~ Dick Blankenburg Suite K Editor & Co-Publisher 1725 Hamilton Avenue South County Publishing Company San Jose, CA 96125 P. O. Box 460 Arroyo Grande, California 93420 Mr. vonn Marrs, Managing Editor San Luis Obispo County Telegram Tribune Mr. James 0. Schuyler 1321 Johnson Avenue Vice President - Nuclear Generation P. 0. Box 112 Department San Luis Obispo CA 93406 Pacific Gas 8 Electric Company r
P. O. Box 7442 San Francisco, California 94120 l:
\\
-~
e Diablo Canyon Mr. Malcoln H. Furbush - *~
i Bruce Norton, Esq.
Suite 202 3216 North 3rd Street Phoenix, Arizona 85012
'Mr. W. C. Gangloff Westinghouse Electric Corporation P. O. Box 355 Pittsburg, Pennsylvania 15230-David F. Fleischaker Esq.
P. O. Box 1178 Oklahoma City, Oklahoma 73101 Arthur C. Gehr. Esq.-
Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. Owen H. Davis, Director
~
Federal Agency Relations Pacific Gas and Electric Company 1050 17th Street, N.W.
Suite 1180 Washington, D. C.
20036 Regional Administrator - Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane-Suite 210 Walnut Creek, California 94596 Dr. Jose Roesset 3506 Duval Road Austin, Texas 78759 t
l i
1 l
--,i j r MEETING NOTICE DEO "
Document Control (50-275)
NRC PDR L PDR TERA NSICL LBi3 Reading J. Lee G. Knighton Project Manager-Hans 9chforlinn E. Case O. Eisenhut/R. Purple j-T. Novak J. Youngblood A. Schwencer G. Knighton E. Adensam C. Thomas G. Lainas W. Russell D. Crutchfield T. Ippolito J. P. Knight W. Johnston D. Muller T. SifJis R. Houston-L. Rubenstein F. Scriroeder M. Ernst J. Kramer Attorney, OELD E. L. Jordon Regional Adminstrator, Region V ACRS (16)
J. M. Taylor PARTICIPANTS (NRC):
HSchierling DEisenhut HFriend GManeatis WCooper e
e 3-e v.
.-,