- MEMCP.".::D M FOR:
Darrell G. Eisenhut, Director'
["}
Division of Licensing.
FRO ::
' Robert L.' Tedesco, Assistant Director-for Licensing Division of Licensing
~
SUBJECT:
WEEKL'Y' STATUS'- Sequoyah 1 &-2 and DiabloLCanyon [
s..
2 FOR PERIOD-0CTOBER 33 TO NOVEMBER 6 d'
l-Secuovah Units Y
Unit.i is at full power since November 1, 19811
' Unit;2 initial criticality occurred on November 5,1981. An IE Preliminary I'
' Notice will be issued.
Delay was the result of Unit 2 having ~a low pressurea e
reactor trip on November '4, while an instrument technician was working on a pressurizer pressure channel.
The explanation' on.why the required two p-of four coincidence signals was generated by this incident is not known.
The wiring in the control. cabinet for one channel was " wrapped" around the
,4 terminal of another channel. For some reason the wrapped wire frayed at b
~
the point of contact which.in turn generated the necessary second signal for a scram.
IE Bulletin is planned on this incident.
s 4
s
'Diablo Canyon'1 Friday, October 30, issued meeting notice for November 3 meeting with PG&E on recent seismic concerns as it relates to the containment annulus area of
{'
Diablo Canyon, Unit 1.
~
C Monday, November 2, issued Board Notification No. 81-35 transmitting PG&E letters dated October 23 and October 27 and Preliminary Notification No.
4 PN0-V-81-59 dated October 26 all dealing with recent seismic concern in regard L
.to the containment annulus area of Diablo Canyon, Unit 1.
Also on Monday,
[
November 2, NRR met with OI&E in preparation for November 3 meeting with PG&E..
L
--Tuesday November 3 held meeting with PG&E to discuss their progress in resolvi g
^
L the recently identified seismic issue.
v L
Wednesday, November 4, issued Board Notification No. 81-36 transmitting Preliminary Notification No. PNO-V-81-54 dated October 16 and PG&E lett2rs
~
4 1:
dated October 19 and 27 all dealing with seismic issue's. Also issued Board Notification No. 81-37 transmitting copy of transcript of November 3 meeting i
with PGLE.
L L0 fIUM0013 XA L&::
:::: :
. $2==--
"--
- - - = -
= - - - - -
x_
a..
V@g,g yv :
y
,s g
p g('
A(.,w: p N -
L
.s -
c Darrell G. Eisenhut!
- 2'-
Diablo Canyoni Unit 1 (c{ntinued)
^
xi Thursday, November 5, prepared proposed 10 CFR 50.54(f) letter for transmittal
~
to the ConcissJdifers. Also prepared proposed slides for November 9 Com.ission Briefing. ' Also prepared Board Notification No. 81-37 transmitting draft Cloud g
Report;' expect this notification to be issued on--November 6.
ki
~
f' 9
- Q, f
gg if[
. g cc.- w.-M-t 7!
Robert.L. Tedesco, Assistant Director s-for Licensing qj Division of Licensing
- s..
s f'/
cc:
'H. R.(Ce'nton '
E.Ir. 3ase 3
-; NRR Division Diredtors
- 3 yff 'Miraglia-w.'
- E.' Adspsam B. Bui?* iey,
i w-W qy':.. /
- C. Stabl.e.
s _
a.
~
.g eq.,
,y n<
+
,, j/
I0l;,,;dT ll.
.l4
,i w
.N'#
g y
_]
^
,+
R'
.,p
~ y
%5; ; j.;y ' Q
i' n
Y
'\\p d', -
w~
w.
r.
<a
>. g pkc' $
- gw
,r; r
, o%
l lw n,
w
- .Y v
{gs-
'*4
,4 a gV p
r
,T 15 r r; e
l
.g
. < vy.
'I L.
...,,,,