ML20209B128

From kanterella
Jump to navigation Jump to search
Submits Weekly Status of Facilities for Period 811030-1106
ML20209B128
Person / Time
Site: Sequoyah, Diablo Canyon, 05000000
Issue date: 11/06/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20209B094 List: ... further results
References
NUDOCS 8112020073
Download: ML20209B128 (2)


Text

. pt v

.c

34 I'O.

@g d'n inJITFD ST ATis N

kgpghi,

. NUCLEAR REGULATORY COMMISSION r,4

/

,+:

.g.

November 6,1981' 1

A

y g

s

MEMCP.".::D M FOR:

Darrell G. Eisenhut, Director'

["}

Division of Licensing.

FRO ::

' Robert L.' Tedesco, Assistant Director-for Licensing Division of Licensing

~

SUBJECT:

WEEKL'Y' STATUS'- Sequoyah 1 &-2 and DiabloLCanyon [

s..

2 FOR PERIOD-0CTOBER 33 TO NOVEMBER 6 d'

l-Secuovah Units Y

Unit.i is at full power since November 1, 19811

' Unit;2 initial criticality occurred on November 5,1981. An IE Preliminary I'

' Notice will be issued.

Delay was the result of Unit 2 having ~a low pressurea e

reactor trip on November '4, while an instrument technician was working on a pressurizer pressure channel.

The explanation' on.why the required two p-of four coincidence signals was generated by this incident is not known.

The wiring in the control. cabinet for one channel was " wrapped" around the

,4 terminal of another channel. For some reason the wrapped wire frayed at b

~

the point of contact which.in turn generated the necessary second signal for a scram.

IE Bulletin is planned on this incident.

s 4

s

'Diablo Canyon'1 Friday, October 30, issued meeting notice for November 3 meeting with PG&E on recent seismic concerns as it relates to the containment annulus area of

{'

Diablo Canyon, Unit 1.

~

C Monday, November 2, issued Board Notification No. 81-35 transmitting PG&E letters dated October 23 and October 27 and Preliminary Notification No.

4 PN0-V-81-59 dated October 26 all dealing with recent seismic concern in regard L

.to the containment annulus area of Diablo Canyon, Unit 1.

Also on Monday,

[

November 2, NRR met with OI&E in preparation for November 3 meeting with PG&E..

L

--Tuesday November 3 held meeting with PG&E to discuss their progress in resolvi g

^

L the recently identified seismic issue.

v L

Wednesday, November 4, issued Board Notification No. 81-36 transmitting Preliminary Notification No. PNO-V-81-54 dated October 16 and PG&E lett2rs

~

4 1:

dated October 19 and 27 all dealing with seismic issue's. Also issued Board Notification No. 81-37 transmitting copy of transcript of November 3 meeting i

with PGLE.

L L0 fIUM0013 XA L&::

:::: :

. $2==--

"--

- - - = -

= - - - - -

x_

a..

V@g,g yv :

y

,s g

p g('

A(.,w: p N -

L

.s -

c Darrell G. Eisenhut!

- 2'-

Diablo Canyoni Unit 1 (c{ntinued)

^

xi Thursday, November 5, prepared proposed 10 CFR 50.54(f) letter for transmittal

~

to the ConcissJdifers. Also prepared proposed slides for November 9 Com.ission Briefing. ' Also prepared Board Notification No. 81-37 transmitting draft Cloud g

Report;' expect this notification to be issued on--November 6.

ki

~

f' 9

- Q, f

gg if[

. g cc.- w.-M-t 7!

Robert.L. Tedesco, Assistant Director s-for Licensing qj Division of Licensing

s..

s f'/

cc:

'H. R.(Ce'nton '

E.Ir. 3ase 3

-; NRR Division Diredtors

- 3 yff 'Miraglia-w.'

- E.' Adspsam B. Bui?* iey,

i w-W qy':.. /

C. Stabl.e.

s _

a.

~

.g eq.,

,y n<

+

,, j/

I0l;,,;dT ll.

.l4

,i w

.N'#

g y

_]

^

,+

R'

.,p

~ y

%5; ; j.;y ' Q

i' n

Y

'\\p d', -

w~

w.

r.

<a

>. g pkc' $

gw

,r; r

, o%

l lw n,

w

.Y v

{gs-

'*4

,4 a gV p

r

,T 15 r r; e

l

.g

. < vy.

'I L.

...,,,,