ML20209B427
Text
+f UNITEJ STATES
'a 8
3 g
NUCLEAR REGULATORY COMMISSION
(
rf j
WASHINGTON, C. C. 20555
/
JUN 4 1982 Docket No. 50-275 MEMORANDUM FOR: Pat Sullivan, Chief Administrative Branch Office of the Secretary FROM:
Hans Schierling, Project Manager Licensing Branch tio. 3 Division of Licensing
SUBJECT:
REQUEST TRANSCRIPT OF MEETING TO BE HELD JUNE 10, 1982 -
DIABLO CANYON This is to confirm the telephone request by Jean Lee for a reporter to prepare a transcript of the meeting to be held on June 10, 198'2, with Pacific Gas and Electric Company and Teledyne Engineering Services re-garding the Diablo Canyon Nuclear Power Plant, Unit 1 (see the enclosed meeting notice for details of the meeting). We need the transcript within two. days following the meeting so that we can make copies for our internal use as well as for the parties to this proceeding. We antici-pate attendance of approximately 30 peopic.
Pleasecontactme(x27238) or Jean, Lee (x28413) if you need additional information.
kT_)
(k kg Hans Schierling, P'roject Manager Licensing Branch No. 3 Division of Licensing Enclosurei Veeting notice i
dtd. 6/4/82
\\
4
/
N
\\ poH/055'Y I
.z.
7 a
-=
/pa neu,{o.,
a UNITED STATES NUCLEAR REGULATORY COMMISSION
{.%@pg,\\ ed./
a
.:. j wassancrow, o. c.2osss
~
Docket No.:
50-275 MEMORANDUM FOR:
F. J. Miraglia, Chief Licensing Branch No. 3, DL FROM:
H. E. Schierling, Project Manager, Licensing Branch No. 3. DL '
SUBJECT:
NOTICE OF MEETING WITH PACIFIC GAS & ELECTRIC COMPANY AND TELEDYNE ENGINEERING SERVICES - STATUS 0F DIABLO CANYON DESIGN VERIFICATION PROGRAM DATE & TIME:
i 12:00 noon LOCATION:
Teledyne Offices 130 Second Avenue Waltham, Massachusetts (Phone: 617/890-3350)
PURPOSE:
To discuss status of the design verification program efforts, includingschedulesandQAprogram(seeattache,dagenda).
NOTE: Meeting will be transcribed.
PARTICIPANTS:
NRC H. Denton, D. Eisenhut, R. Vollmer, L. Chandler, and H. Schierling l
PG&E G.Maneatts,J.Hoch,H. Friend (Bechtel),etial.
Teledyne W. Cooper, et. al.
F 3
Hans Schierling, Project Manager Design Verification Program D p @ 6.c y '
Licensing Branch No. 3 Division of Licensing.
Attachment:
As stated cc:
See next page m
.l..
~
e-
~
l.
Mr. Malcolm H. Furbush DIABLO CANkON Vice President - General Counsel Pacific Gas & Electric Conpan'y P.O. Box 7442 San Francisco, California 94120 9!
Philip A. Crane, Jr., Esq.
cc:
Pacific Gas & Electric Company P.O. Box 7442 San Francisco, California 94120 Janice E. Xerr, Esq.
California Public utilities Commission i
350 M:Allister Street San Francisco, California 94102 Mr. Frederick Eissler, President i
Scenic Shoreline Preservation Conference, Inc.
4623 More liesa Drive
~
Santa Barbara, California 93105 1
Ms. Elizabeth Apfelberg 1415 Cozadero San Luis Obispo, California 93401 Mr. Gordon A. Silver Hs. Sandra A. Silver 1760 Alisal Street San Luis Obispo, California 93401 liarry M. Willis, Esq.
Se3nour & Willis 601 California Street, Suite 2100 San Fran:isco, California 91108 Mr. Richard Habbard 11H3 Technical Associates Suite K 1723 Hamilton Avenue San Jose, California 95125 Mr. John ftares, fianaging Editor San Luis Obispo County Telegram-Tribune 1321 Johnson Avenue P. O. Box 112 San Luis Obispo, California 93406 s.
e e
[
t g
D
, 7,..
=
.\\
Mr. Malcolm H. Furbush
,2-cc:
Resident Inspector /Diablo Canyon NPS c/o U. S. Nuclear Regulatory Commission P. O. Box 369 Avila Beach, California 93424 Ms. Raye Fleming 1920 Mattie Road Shell Leach, California 93440 Joel Aeynolds, Esq.'
John R. Phillips, Esq.
Center for Law in the Public Interest 10951 West Pico Boulevard Thiro floor Los Angeles, California 90064 Paul C. Valentine. Esq.
321 Lyttun Avenue Palo Alto, California 94302 Mr. byron S. Georgiov Legal Affairs Secretary Governor's Office State Capitol
~
Sacramento, California 95814 Herbert H. Brown, Esq.
Hill, Christopher & Phillips, P.C.
1900 h Street, N.W.
Washington, D.C.
20036 Mr. Dick Blankenburg, Editor & Co-P0blisher South County Puclishing Cor.ipany P. O. Box 460 Arroyo Grance, Cali fornia 93420 lir. Ja..es.0. Schuyler Vice President - Nuclear Generation Department Pacific Las & Electric Company P.O. box 7442 c
San Francisco, California 94120
. fh bruce Norton, Esq.'
Suite 204 321614 orth 3rd Street Phoenix, Arizona 85012 a
7 y,.
s
+~
s.
Mr. Malcolm H. Furbush 3-Mr. W. C. Gangloff Westinghouse Electri,c Corporation P. O. Box 355 Pittsburgh, Pennsylvania 15230
-l X
< s.
David F.' Fleischaker, Esq.
P. O. Box 1178
' ^ Oklahoma city, Oklahoma 73101 _,,.
[
Arthur C. Gehr, Esq.
Snell A Wilmer 3100 Valley Center Phoenix l Arizona 85073 Mr. Owen H. Davis, Director Federal Agency Relations Pacific Gas and Electric Company 1050 17th Street, N.W.
Suite 1180 Washington, D.c.
20036 f
1 i
i j
4 e
i i
r 4
J e
I 8
i e
O 4
s a
7
./
Q.Q
..,,Q;,r.
..'- y c,
?,
y b
f-AGENDA NRC Meeting with PG&E and Teledyne 1..
Overview of IOVP'- Phase I (Teledyne)
- status of program
- additional verification and sampling
- Teledyne conclusions and recommendations on QA findings by R. F. Reedy
~
- interim technical reports - purpose and status 2.
Overview of IOVP
- Phase II (Teledyne)
- status of program 3
3.
Project Schedule (PG&E)
- IDVP by Teledyne
- Technical Program by PG8E i
- NRC interaction dates 4.
QA Program for Diablo Canyon Project
- PG&E/Bechtel consolidated QA program for veri.fication program i
1 5.
OtherIssues(NRC) s 1
i e
e e
6 e
l id d '4C
@ Maug4
,71 f,,
UNITED STATES w~
~
y'y g
NUCLEAR REGULATORY COMMISSION s
rg E
WASHINGTON, D. C. 20555 T(CV'd lo 4 D
JIJN 41982~
)
MEMORANDUM FOR:
James Fitzgerald, Acting Director Office of Investigations Richard C. DeYoung, Director Office of Inspection and Enforcement FROM:
Harold R. Denton, Director Office of Nuclear Reactor Regulation
SUBJECT:
ANONYMOUS ALLEGATIONS CONCERNING DIABLO CANYON NUCLEAR POWER PLANT The enciesed letter is forwarded for appropriate action by your office.
The individual alleging deficiencies has indicated corrective action that he would find appropriate. NRR does plan to have the p.iping system thermal / deadweight analysis included within the scope of Phase II of the Independent Design Verification Program, m
Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosure:
As stated i
I Q t-f
c/18I81-g n1.
, 3:
NRC Washington, D. C.
Dear Mr. Richard DiYoung:
I am currently involved in the Diablo Canyon Review e ffort now in progress., I must say that this is the worst nuclear power plant that I have ever worked on.
and it is not SAFE.
I was hoping with the^ introduction of Bechtel that a complete rb-analysis of Unit 1 would be done.
Alas this is not to be.
The PG&E management /
engineers only correct the mistakes tnat are found accidentially or are forced down their throats.
If the error is an generic one, they will not review everything but just what caused the error and they will only correct that one mistake.
The lateat review is for hosgri only but the real danger.is that:
- 1) The thermal / deadweight analysis does not match the seimic or current field support configuration.
Systems are failing when corrected.
- 2) The so-called 'As-Built" pipe support drawings are not as-built but instead are the accumulation of 'all the changes to the support drawing over the past-13 years.
The support have not been walked dcwn in the field to show there'. latest configuration or orientation _to_the pipe. Also interferences with structure are not show on the drawings.
I only ask that you have R. L. Cloud & Associates review the thermaI/ Deadweight analysis as well as~the Hosgri they are now doing.
This will confirm what I have said.
If action is not taken, I may be. force to seek a public hearing on this.
'I am pro-nuclear but invalid analysis andincompetence must,not be igored. This palnt in =y opinion is bad from the analysis to the supports.
Thank you for your time.
Sincerely A Concered Engineer
,V al M%~ I ~ m,,En w
a e,
- - - ~
- ~s
_