Trip Rept for 821112 Info Exchange Meeting Between Teledyne Engineering Svcs & Util in Waltham,Ma to Review Corrective Action Plans for Annulus Structure
ML20209B794
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 11/30/1982
From: Polk H
Office of Nuclear Reactor Regulation
To: Schauer F
Office of Nuclear Reactor Regulation
Shared Package
ML20209B094 List: ... further results
References
NUDOCS 8212130049
Download: ML20209B794 (3)


Text

. ' -

Y j

9/FfQZ gg UNITED STATES

'[' i'/y$j NU. CLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 D

'4 NOV 3 0 sez FD DRANDLM FOR: FranzP..Schduer, Chief Structural Engineering Branch Division of Engineering

~

IHRU:

T. KEo,iSection B Icader

~

tructural Engineering Branch A.

i Division of Engineering

'FROM:

Harold.E. Polk Structural Engineering Branch Division of Engineering

SUBJECT:

TRIP REPORI FOR TcTmYNE ENGI1N SERVICES MEETING, NOVDBER 12, 1982 FOR DIABLO CANYON b

An inforn$ tion exchange 2neeting between PG&E and Tele' yne' Engineering Serhices d

(TES) was held in Waltha:n, Mass on November 12, 1982. The announced purpose..

of ~ the.neeting was to review corrective action plans.with respect to the annulus 1 structure. Tne meeting was attended by representatives from Diablo Canyon.

Project (DCP),. Robert L. Cloud Associates (RICA), Teledyne Engineering Services (IES), Broo&avenNational Laboratory (BNL) and the staff. A list of attendees is attached.

Detdiledfindingsandconcernspert$iningto.therehiewofthe 1981/1982 URS/Blune redel of the contaitraent were. discussed in the meeting. The primary.

. concern of TES.(Di s. Holly and Biggs) was. expressed in a letter from Ronald.Wray,-

TES to B. A. >bneatis, PG&E dated October 15, 1982. The two concerns, as su:r.arined in the letter are reproduced belcu.

1.

Wether the URS/Blb:ne consolid$ tion of radidl beams at the two lower levels, i.e.,ically o~r conservatively the 101 ft. and..

106 ft. elevatien, can. realist represent the structural stiffness and, hence, response of the radial bea:n numbers at those levels.

.-2.

Whether the strbetur$1 response deheloped from the condensed frame rode 1~s used by URS/Blume can account for the_ local.a:plified response for the.three. lower

~

levels at locations on the. tangential beans that span between the main radial beams or on secondary radial beams.which connect to tangential beams.rather than span be m een the polar crane wall and odter columns.

\\b w n om

_I e

k 3

3

__l-_---

J

-_----___-_-_i__-__-_---_-__-_-

Rese concerns were also expressed in a letter frca Willia:a Cooper,.TES, to H. R. Denton, KRC, dated October 15, 1982. L e concerns expressed are cen-sistent with the results reported in NUREG/CR-2834 published in August, 1982.

the concerns of the IDYP with the flexibility of the pi,t$ched, which Ed TES has issued in.1982 EOI's977,1103,3006,3307,dt pe supports, ccr.pted stiffness of radial. beams in-the seismic rodel and the effect of tangential.

beamscon the local amplified response. spectra. 'IES expressed the concern that the effects of the secondary structure has not been analysed by either the structural discipline nor the piping discipline.

Scce of the conservatisms in the redeling were discussed by PG6E as a justificatica for the nodeling methods used. PG&E. stated that all of the pipe loads are assumed to reach their peaks sinultaneously as well as all the other loads in the load combination equation. Also the-piping supports do not necessarly react loads.in each of the three orthogonal axis sinultaneously, therefore any a. plification in a directica that does not influence the piping loads would not be of concern.

Corrective action plans for_the containment annulus structure were discussed.

_ Such. options.as... fixes involving action.taken at the structural levely or at the pipmg supports, were touched upon. Representatives from the Diablo Canyon Eroject (DCP) informd the neeting participants that,. currently,...

nodifications are being made to the steel framework of the. contai:raent_ annulus structure. Tnese rodifications. include changes in the member connectivity to

~ achieve more rigid joints instead of shear or pinned connections..One of the

-items discussed was changes to.the connectivity_between the. steel beams.and crane wall so that they cculd be considered virtually fixed. Tne possibility of taking credit for current damping values for the Diablo Canyon Plant design was also discussed.. Le cutcome of the discussions regarding plans.for.

corrective action was, that at this point, the DCP has as yet not nude any decisions with respect to any particular solution.

Scae $dditionEl ccderns were exoressed.by the IDVP with reg $rd to the horizontal floor res

~

horizontal analysis.rense spectra calculated for the annulus _ structure.of the The and thus only general concerns were addressed.

B e.IDVP requested.PG&E to provide a proposal on how the concerns of the IDVP shculd be resolved.

s Pa old E. Polk Structural Engineering Branch Division of Engineering Seenextp$ge i

4 4-

- ps- _

~~

3 l

t cc:

R. Volla r D. Eisenhut 1 Shight' P. Kuo t H. Polk M. Reich, E'E.

A. Philippscopoulos, B:1 li. Schierling B. Buckley 9

6 h

e

=

4

.r l

g nr,,,

/

ig UNITED staff s

- ! }

s.,

g NUCLEAR REGULATOFIY COlVhilS

,.g y;

WASHINGTp V. D.l 1 40555 SQ v /

EC1

'Af f

Docket No.: 50-275 7

George W. Kn](ghtog/,

MEMORANDUM FOR:

ief, Licensing Branch No. 3, DL HansE.'chiehg,ProjectManager,LicensingBranchNo.3,DL FROM:

SUBJECT:

[

F0TI C F ETING WITH PACIFIC GAS & ELECTRIC COMPANY D

CONTRACTORS - DIABLO CANYON UNIT 1 DESIGN V II 'I iTION PROGRAM l

J DATE & T' E:

Jr a December 9:00 AM - o.uu PM LOCATION:

PG&E Offices, Room 1760 77 Beale Street San Francisco, California PURPOSE:

To update and discuss with.PG&E and the IDVP the status of the Diablo Canyon Design Verification Program Phase I and Phase II.

NOTE: This meeting will be transcribed.

PARTICIPANTS:

NRC D. Eisenhut, R. Engleken, J. Knight, H. Schierling, L. Rubenstein, L. Chandler, P. Kuo, J. Crews, T. Bishop, and P. Morrill PG&E/Bechtel Project Orcanization G. Maneatis, H. Friend, J. Hoch et. al.

IDVP f

\\W'.. Cooper, et. al.

M V\\

Hans E. Schierling, roject Manager Licensing Branch No. 3 Divisicn of Licensing cc: See next page

Contact:

H. Schierling, NRC 301/492-7238 J. Hoch, PG&E 415/768-0881 Y

g l'L \\)M.\\

^

i Yff '

4 Diablo Canyon Mr. Malcolm H. Furbush Vice President - General Counsel Pacific Gas & Elec.tric Company P. O. Box.7442 San Francisco, California 94120 l

cc: Philip A. Crane, Jr., Esq.

Resident Inspector /Diablo Canyon NPS Pacific Gas & Electric Company c/o U. S. Nuclear Regulatory Commission P. 0. Box 7442 P. O. Box 369 San Francisco, California 94120 Avila-Beach, California 93424

'anice E. Kerr, Esq.

California Public Utilities Commission

. Ms. Raye Fleming 1920 Mattie Road

.350 McAllister Street Shell Beach, California 93440 San Francisco, California 94102

'Joel Reynolds, Esq.

Mr. Frederick Eissler, President John R. Phillips, Esq.

Scenic Shoreline Preservation Center for Law in the Public. Interest Conference, Inc.

10951 West Pico Boulevard-4623 More Mesa Drive Third Floor

. Santa Barbara, California 93105 Los Angeles, California 90064 Ms. Elizabeth Ap'felberg Paul C. Valentine, Esq.

1415 Cozadero 321 Lytton Avenue San Luis Obispo, CA 93401 Palo Alto, California 94302 Mr. Gordon A. Silver Mr. Byron S. Georgiou Ms._ Sandra A.. Silver

/

Legal Affairs Secretary 1760 Alisal Street Governor's.0ffice San Luis Obispo, CA 93401 State Capitol Sacramento, California 95814 Harry M. Willis, Esq.

Seymour & Willis.

Herbert H. Brown, Esq.

601 California Street, Suite 210J Hill, Christopher & Phillips, P.C.

San Francisco, CA 94108 1900 M Street, N.W.

Washington, D. C.

20036 Mr. Richard Hubbard MHB Technical Associates Mr. Dick Blankenburg Suite K Editor & Co-Publisher l

1725 Hamilton Avenue-South County Publishing Company.

San Jose, CA 96125 P. O. Box 460 Arroyo Grande, California 93420 Mr. John Marrs, Managing Editor San Luis Obispo County Telegram Tribune Mr. James 0. Schuyler 1321 Johnson Avenue

- Vice President - Nuclear Generation P. 0. Box 112

. Department

-San Luis Obispo, CA 93406 Pacific Gas & Electric Company P. O. Box 7442 L

San, Francisco, California 94120 4

e--,

ew e e,

4 w.

_ w

~

Diablo Canyon r

!?'"

r. 'Malcolm H. Furbush

^

' Eruce.:'orton, Esq.

uit-202 3216' North 3rd Street Phoenix,- Arizona 85012 Mr. W. C. Gangloff Wastinghouse Electric Corporation

- P. 0. Box 355 LPittsburg,~ Pennsylvania 15230

David F. Fleischaker, Esq.

P. 0. Box'll78 Oklahoma City, Oklahoma 73101 e.

Arthur C.~Gehr, Esq.

Snell & Wilmer e.

i 3100 Valley Center Phoenix, Arizona 85073 Mr. Owen H. Davis, Director Federal Agency Relations Pacific Gas and Electric Company 1050 17th Street., N.W.

Suite 1180

- Washington, D. C.

20036 Regional Administrator - Region V U.5-,Muclear Regulatory Commission 1250 Maria Lcne

~

? ' s 210

..a: ut Cr:ai;. California 9a5^6 0-

?:.is ?re:t+-

b a

9 e

1 1

7 :.

+

N Je.'

=*

~

3 s-r

.w

(,

MEETING NOTICE Document Control (50- 27d DEC 1 1982 r

NRC POR L POR TERA NSIC LB#3 Reading J. Lee

'G. Knighton 1

Project Manager HSchierling E. Case D. Eisenhut/R. Purple T. Novak J. Youngblood A~. Schwencer G. Knighton E. Adensam C. Thomas, ql G. Lainas i

W. Russell D. Crutchfield T. Ippolito

'J. P. Knight W. Johnston D. Muller T. SPEis R. Houston L. Rubenstein F. Schroeder M. Ernst J. Kramer f

l Attorney, OEL E. L. J V

Regione Adaiins e at-Re en ACRS (: 5)

J. M.

lor PARTICIPNTS (NRC):

DGEisenhut REngelken

.LChandler PKuo

~~

'JCrews TBishop PMorrill b

a i am -ii J