ML20209B850
Text
/
q -.
- x.,
g,, g.
~*
+
.~ o UNITED STATES f
- g f' ggg NUCLEAR REGULATORY COMMISSION i ~,
j 5
4: y-WASHINGTON, D. C. 20555 -
5.
.s o[
JAN 21 1983
~
MEMORANDUM FOR:. Hans Schierling, Project Manager Licensing Branch No. 3..
Division of Licensing FROM:
Harold Polk, Structural Engineer
. Structural Engineering Branch Division of. Engineering
SUBJECT:
BROOKHAVEN NATIONAL LABORATORY, REQUEST FOR ADDITIONAL INFORMATION ON DIABLO-CANYON CONTAINMENT ANNULUS STRUCTURE During the December 21, 1982 meeting between NRC, BNL, PG&E and TES, the BNL representatives made a nember of requests for additional information
]
to expedite the BNL analysis. These requests centered around structural 1
and piping details.
Enclosed is a list summarizing these requests.
Please formally transmit these requests to the PG&E Diablo Canyon Project Office.
8
~
/.
etural Engineer Harold Polk, St Structural Engineering Branch Division of Engineering
Enclosure:
As stated cc:
J. Knight G. Knighton P. Kuo M. Hartsman H. Polk i
Q w
_