ML20209B850

From kanterella
Jump to navigation Jump to search
Forwards Requests for Addl Info Re Structural & Piping Details for Transmittal to Util
ML20209B850
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 01/21/1983
From: Polk H
Office of Nuclear Reactor Regulation
To: Schierling H
Office of Nuclear Reactor Regulation
Shared Package
ML20209B094 List: ... further results
References
NUDOCS 8301260083
Download: ML20209B850 (1)


Text

/

q -.

x.,

g,, g.

~*

+

.~ o UNITED STATES f

  • g f' ggg NUCLEAR REGULATORY COMMISSION i ~,

j 5

4: y-WASHINGTON, D. C. 20555 -

5.

.s o[

JAN 21 1983

~

MEMORANDUM FOR:. Hans Schierling, Project Manager Licensing Branch No. 3..

Division of Licensing FROM:

Harold Polk, Structural Engineer

. Structural Engineering Branch Division of. Engineering

SUBJECT:

BROOKHAVEN NATIONAL LABORATORY, REQUEST FOR ADDITIONAL INFORMATION ON DIABLO-CANYON CONTAINMENT ANNULUS STRUCTURE During the December 21, 1982 meeting between NRC, BNL, PG&E and TES, the BNL representatives made a nember of requests for additional information

]

to expedite the BNL analysis. These requests centered around structural 1

and piping details.

Enclosed is a list summarizing these requests.

Please formally transmit these requests to the PG&E Diablo Canyon Project Office.

8

~

/.

etural Engineer Harold Polk, St Structural Engineering Branch Division of Engineering

Enclosure:

As stated cc:

J. Knight G. Knighton P. Kuo M. Hartsman H. Polk i

Q w

_