ML20209B345

From kanterella
Jump to navigation Jump to search
Forwards List of Documents Re Diablo Canyon Design Verification Program Which Will Be Placed in Shearon Harris Lpdr
ML20209B345
Person / Time
Site: Harris, Diablo Canyon, 05000000
Issue date: 04/16/1982
From: Miraglia F
Office of Nuclear Reactor Regulation
To: Rothschild M
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Shared Package
ML20209B094 List: ... further results
References
NUDOCS 8204290026
Download: ML20209B345 (2)


Text

s >3 G t:tsg,

$o, UNITED STATES

[4Y, 4. (f(.,g NUCLEAR REGULATORY COMMISSION

,, ;,, i, ",y,M/,.,E WASHINGTON, D C. 20555

  • }'Q.ff t,

APR 161982

  • ...+

MEMORANDUM FOR:

M. Rothschild, Office of the Executive Legal Director FROM:

F. J. Miraglia, Chief, Licensing Branch No. 3 DL

SUBJECT:

DOCUMENTS ON DIABLO CANYON TO BE SENT TO LPDR FOR SHEAR 0N HARRIS I

At the public meeting that was held on April 7, 1982 regarding Shearon Harris,

~

s.

we indicated we would provide the LPDR with copies of some documents regarding Diablo Canyon Design Verification Program. We have assembled a set of such documents that in our view would provide interested persons infonnation on the background and status of that program (see enclosed).

It is requested that you take the necessary steps to have this information provided to the LPDR.

If you have any questions, please call me (X27161).

=

\\1 dd M&

Frank Jhhi a'glidChief Licensing Branch No. 3 Division of Licensing cc:

R. Tedesco Enclosures :

See attached List N

b gofff v 3b f' o

y f, a\\

q

.e,4

.,c' Listinglof Documents Regarding Diablo-Canvon Design Verification Program

1.. Commission Order CLI-81-30, November 19, 1981 2.

Letter H.

R.~ Denton, NRR, to M. H. Furbush, PG&E, November 19, 1981 3.

Letter M. H. Furbush', PG&E, to H. R. Denton, NRR, D'ecember 4, 1981 transmitting detailed program plan for independent seismic design verification.

4.

Commission Paper SECY-82-89, March 1 1982 transmitting NRC' staff evaluation of Diablo Canyon proposed seismic design verification program.

5.

Letter P. Crane, PG&E, to H. R. Denton, NRR and R. H. Engelken, RV, March 30, 1982 transmitting PG&E. tenth semimonthly status -report including updated list of open items and errors.

6.

W. E. Cooper, TES, to G. A. Maneatis, PG&E, et.al. transmitting TES Program Management Plan - Phase I for Independent Design Verification Program,-April 2, 1982 4

e

    • mi

-

  • esg>,m aine.amn,e-.,

e p-% $gnepus., e m -

--a g-

-=-

g

-e egg.e m