Advises Encl Info Should Be Issued to Appropriate Boards & Parties as Board Notification 82-72.Info Discusses Results of Region IV Investigation at Teledyne
ML20211E601
Person / Time
Site: Fermi, Summer, Limerick, Diablo Canyon, 05000000
Issue date: 07/08/1982
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Lainas G, Novak T, Tedesco R
Office of Nuclear Reactor Regulation
Shared Package
ML20209B094 List: ... further results
References
NUDOCS 8702240360
Download: ML20211E601 (1)


Text

F(:,.., fg 4,,.. %

,___-_ g =

UNITED STATES.

NUCLEAR REGULATORY COMMISSION g[- _4 g (

l

/

,o A. '.

g y

wasHsucTen. o. c. 2osss 4

tu a.

4

\\.',,. **

W, (.! cu. s [ 7 j

_4, a

(UL 8 1982

"&6

( 2b

/

. MEMORANDUM FOR:

Robert Tedesco, Assistant Director for Licensing ' I

, Thomas Novak, Assistant DirectoAfor Operating Reactors Gus Lainas, Assistant Director for Safety Assesstrent l

af X FROM:

Darrell G. Eisenhut, Director q

Division of Licensing

SUBJECT:

BOARD fl0TIFICATION 82-72 5'

Yi I have determined that t'he attached information concerning the results of a y

e Region IV investigation at Teledyne should be sent to the appropriate Board" and parties in accordance with the procedures of Office Letter No.19.

The investigation was stimulated by an allegation relating to the Fitzpatrick

),5 and Yankee Electric facilities.

The results reflect an audit of tthe.

Teledyne internal QA program.

Since the investigation may be viewed'as a

-e cross-cut of the Teledyne QA program, its results reflect the gener'al level of conformance to QA requirements at Teledyne.

It is therefore applicabla to all plants for which Teledyne is doing work.

These plants include

~

Diablo Canyon, Ferme 2 Summer, Limerick, and the operating reactors listed en the first page of the inspection report.

6-

'/

s e

It is the opinion of the staff that this' report does not constitute a major-safety concern.

Issue this as Board Notification 82-72.

j p

\\

y isenhut D r ctor Division of Licensing

Enclosure:

As Stated 3..

y o#

'R s

e e

i f

ll'l-~5)*,,.

's_

eMoog,

  • '* ' d,yj O

' #o, UNITED STATES

['e 7 i ',.-, ' {Y NUCLEAR REGULATORY COMMISSION U$

WASHING TcN. D. C. 20555 6

t,.

]

~ [..

  • Q0.b tOMC A

dill a mot C. b' 2 i

c eg e o-

~

MEMORANDUM FOR:

h'ose'on Attached List v -:.

4 "FROM:

Hans Schierling, Project Manager Design Verification Program'

.p, Licensing Branch No. 3

/

Division of Licensing

SUBJECT:

DIABLO CANYON BOARD NOTIFICATION 82-67 Att' ached Board Notification 82-67 was issued on July 1,1982 consist-

~ :.

' ng of a letter, also dated July 1,1982 from H. R. Denton to W. Cooper of i

jieledynewithaBNLreportenclosed.

Some copies for the NRC internal distribution did not include the transmittal letter which has now been

-v

'l ncluded.

We have determined that the Board Notification packages to the i

Chairman and the Commissioners were complete packages. We also detennined

,e sulectively that the addressees on the Board Notification Service List received complete packages.

e

'I Ql n.

y J.. L {

.s Hans Schierling, Project Manager.

Design Verification Program W

Licensing Branch No. 3 l-Division of Licensing, NRR

Attachment:

/

As stated I

! m urn I

NN

-r,

,=,---.m

--p._

c -,

--_.y--

---9_

,,_,r

.-te r v e-


~-9

m

,i

9 I

' Addressees-2-

Document Control'(50-275/323)

NRC PDR L PDR PRC NSIC LB#3 File-

,a F. Miraglia

^

H. Schierling H. Denton/E. Case B. Jones, OELD Attorney E. Christenbury, OELD J. Scinto, OELD 1

k e

9 6

er e

e Pa mr