Forwards Undated Anonymous Ltr Re Allegations Challenging Integrity of Ongoing Idvp Effort
ML20211E379
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 10/02/1981
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Deyoung R, Fitzgerald J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), NRC OFFICE OF INVESTIGATIONS (OI)
Shared Package
ML20209B094 List: ... further results
References
NUDOCS 8702240297
Download: ML20211E379 (2)


Text

_,

  1. e UNITED STATES 8

NUCLEAR REGULATORY COMMISSION -

o

-d WASHINGTON, D. C. 20555

  • s.,...../

MEMORANDUM FOR: Richard'C. DeYoung, Director.

Office of Inspection and Enforcement James Fitzgerald, Acting Director-Office of Investiagtions FROM:

Harold R. Denton, Director Office of Nuclear Reactor Regulation

SUBJECT:

ALLEGATIONS CONCERNING THE DIABLO CANYON NUCLEAR POWER PLANT The enclosed letter is forwarded for further review and possible action by your office. The allegations challenge the integrity of the ongoing Independent Design Verificatton Program effort and would be serious if substantiated.

[

?

Har d R. D on, Director Office of uclear Reactor Regulation

t

~ x.

g.,,

. y..

s

_g r

l KRC

?lashin5 ton, D. C..

~.[

3

Dear Mr.' Richard DiYoung:

I am currently invol effort now in progress.ved in the ' Diablo Canyon Eeview worst nuclear power

. I must say that this is the-and it is not SAFE.., plant that I have sver worked on.-

I was ho of Sechtel that a complete reping with the introduction 4

be done.

anal Alas this is not to be. ysis of Unit 1 would

.accidentially or are forced down their throats. eng but just what caused the error and they will only If the that one mistake.

but the real danger. is that:The lateat review is for hosgri onlyect I

1

1) The thermal / deadweight analysis does not match Systems are failing when corrected.the seimic o
2) The so-called 'As-Built" pipe support drawings of all the chanare not as-built ~but instead are the ac past 13 years. ges to the support drawing over the The support have not been walked down in the field to show there'. latest configuration structurearenotshowonthydrawings.or orient g

review the thermalI only ask that you have R. L. ' Cloud & Assceiates

,Hosgri they are now/ Deadweight analysis as well as the doing.

If action is not taken, I may be ' force to seek aThis wi said.

public hearing on this.

andincompetence must'not be igored. This palnt in ny o is bad from the analysis to the supports.'

' Thank you for your time.

Sincerely l

A Concered Engineer 4

\\

y y.v.

-o 4,

+,

f y

i L

i

1. -

T MEMORANDUM FOR:. Richard C. DeYoun'g, Director Office of Inspection and Enforcement James Fitzgerald,' Acting Director Office of Investi,agtions FROM:

Harold R. denton, Director Office of Nuclear, Reactor Regulation

SUBJECT:

ALLEGATIONS CONCERNING THE DIABLO CANYON NUCLEAR POWER PLANT The enclosed letter is forwa ded for further review and possible action by your office. The allegations challenge the integrity of the ongoing

^

Independent Design Verification Program effort and would be serious if substantiated.

Harold R. Denton, Director

_ Office of Nuclear Reactor Regulation Distribution:

Docket File 50-272/323 TERA LB#3 File HDenton/ECase DEisenhut/RPurple RTedesco FMiraglia BBuckley JLee

&%CWr'Y

,nectD.L..%.u -

I

.DLr 4 3........D..L..:d...L......

.DL:

NRR:DIR

,~. cp.BBuckley:ph FM lia RT sco dei hut HDenton

,,,,}f,,',7f,f,,',',,f,,,,,,

I 82

~ ' ' ' ~ ' " "

e c.

3.c -:.a e m O F F I C I A L _R 2_C O F_; D.-C. O PY--

u '~

y ll ~., ; :. ["*'%

UNITED STATES f'y NUCLEAR REGULATORY COMMISSION

  1. .y n.

wAsmucTom, e, c. 20sss

%,,..e /

Dock'et No.: 50-275 MEMORANDUM FOR: Chairman Palladino Comissioner Gilinsky Comissioner Ahearne Comissioner Roberts Comissioner Asselstine' FROM:

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation

SUBJECT:

ALLEGATIONS CONCERNING THE DIABLO CANYON NUCLEAR POWER PLANT (Board Notification No. 82-62)

In accordance with present NRC procedures for Board Notifications the enclosed anonymous letter from a concerned engineer is provided to the Comission for information (Enclosure 1). The allegations expressed in the letter raise serious questions as to the design adequacy of Diablo Canyon, Unit 1.

The allegations are related to the ongoing Independent Design Verification Program which is the subject, in part, of Commission Order CLI-81-30.

The Office of Nuclear Reactor Regulation has requested the Office of 4 4 A che c A-ci.% r L C.

J Investigations to inigag)ppgcigt; acg%gMggcy g

e-concern g*-

thc vec vm 9

/.,

wfth Phase II of the Independent Design Verification Program r

(see Enclosure 2).

The material does not pertain to those matters that were resolved by ALAB 644.

g i

w Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation

Enclosures:

As stated

- Cth G..r ha w,. f s,.f h,

(;79. f or % l ng m, L,,4.,n,,,

Mc v.o 44 %,,.,.o m...

a... s 5df..; ( % ! '% < <.. m A& ef r m h.tti., wJJ 4:, ce,J.'4 =.

a.

.-