ML20210R180

From kanterella
Jump to navigation Jump to search

Forwards SE Re Approval of Relief Requests for Pump & Valve Inservice Testing Program.Relief Requests (RR-P-1 & RR-P-2) Authorized Per 10CFR50.55a(a)(3)(ii) for 6 Months from Date of Ltr & RR-P-2 Authorized,Per 10CFR50.55(a)(3)(i)
ML20210R180
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/27/1997
From: Berkow H
NRC (Affiliation Not Assigned)
To: Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20210R186 List:
References
TAC-M98893, TAC-M98894, NUDOCS 9709020337
Download: ML20210R180 (3)


Text

__ _ _ _ - _ _ _ - - _

August 27, 1997 Mr. C. K. McCoy Distribution THarris (e-mail TLH3-SE)

Vice President Docket File HBerkow {

Southern Nuclear Operating PUBLIC LBerry Company, Inc. PDil-2 Reading DTerao Post Office Box 1295 BBoger JJohnson, Ril Birmingham, Alabama 35201-1295 OGC O-15 B18 PSkinner,Ril ACRS, T-2, E26 KDempsey GHill (4) GTracy, EDO

SUBJECT:

APPROVAL OF RELIEF REQUESTS FOR THE PUMP AND VALVE INSERVICE TESTING PROGRAM - VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS M98893 AND M98894)

Dear Mr. McCoy:

i By letter dated May 29,1997, Southern Nuclear Operating Company, Inc. (SNC) submitted the second 10-year interval inservice Testing (IST) Program for Pumps and Valves for the Vogtle Electric Generating Plant (VEGP), Units 1 and 2. Included in this submittal were four relief requests (RR-G-1, RR-G-2, RR P-1, and RR-P-2). Pursuant to 10 CFR 50.55a, the staff reviewed these relief requests against the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI. A Safety Evaluation (SE) l documenting this review is enclosed. The SE concludes that RR-G-1 and RR-G-2 were previously approved in a letter dated November 27,1996; RR P-1 is authorized pursuant to 10 CFR 50.55a(a)(3)(ii) for an interim period of 6 months from the date of this letter; and RR-P-2 is authorized pursuant to 10 CFR 50.55(a)(3)(i).

t if you have any questions regarding this aoproval, please have your representative contact Duke Wheeler at (301) 415-1444.

Sincerely, ORIGINAL SIGNED BY V. NERSES FOR:

Herbert N. Berkow, Director Project Directorate ll 2 Division of Reactor Projects.-l/II Office of Nuclear Reactor Regulation .

Docket Nos. 50-424 and 50-425 cc w/ encl: See next page M CFD""FC MiB COPY f {

' DOCUMENT NAME: VOG98893.LTR OG d b OFFICE PDll-2 - PDil-2/LA h PDil-2/D /

NAME L R cn L BERRY Mitflerue/i; NEkh DATE k111/97 #h/97 8 / / I /97 h /)7/97 COPY [YEhNO kYEShO YES NO /IES) NO (VOFFICIAL RECORD COPY 9709020337 970827

pn atn.

p +4 UNITED STATES

- ;j. j NUCLEAR REGULATORY COMMISSION

\....,/

t WASHINGTON, D.C. 30e464001 August 27, 1997

{

Mr. C. K. McCoy Vice President Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

APPROVAL CF RELIEF REQUESTS FOR THE PUMP AND VALVE INSERVICE TESTING PROGRAM - VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. M98893 AND M98894)

Dear Mr. McCoy; By letter dated May 29,1997, Southern Nuclear Operating Company, Inc. (SNC) submitted the second 10-year interval inservice Testing (IST) Program for Pumps and Valves for the Vogtle Electric Generating Plant (VEGP), Units 1 and 2. Included in this submittal were four relief requests (RR-G 1, RR-G-2, RR P-1, and RR-P 2). Pursuant to 10 CFR 50.55a, the staff reviewed these relict requests against the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI. A Safety Evaluation (SE) documenting this review is enclosed. The SE concludes that RR-G-1 and RR-G-2 were previously approved in a letter dated November 27,1996; RR-P-1 is authorized pursuant to 10 CFR 50.55a(a)(3)(ii) for an interim period of 6 months from the date of this letter; and RR P-2 is authorized pursuant to 10 CFR 50.55(a)(3)(i)

If you have any questions regarding this approval, please have your representative contact Duke Wheeler at (301) 415-1444.

Since, rely,

/c ht - 4%

Herbert N. Berkow, Directo Project Directorate 11-2 Divhlon of Reactor Projects - t/11 Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosure:

Safety Evaluation cc w/ encl: See next page

Vogtle Electric Generating Plant I

cc:-

Mr. J. A. Bailey - Harold Rebels, Director -

Manager,- Licensing Department of Natural Resources Southem Nuclear Operating _ 205 Butler Street, SE. Suite 1252

-- Company, Inc. Atlanta, Georgia 30334 P. O., Box 1295 Birmingham, Alabama 352011295 Attomey General

-1 j'

Law Department Mr. J. B. Beasley 132 Judicial Building  !

General Manager, Vogtle Electric Atlanta, Georgia 30334 1 Generating Plant

. Southem Nuclear Operating - Mr. R. D. Barker -

' Company, Inc. Program Manager P. O.' Box 1600 Fossil & Nuclear Operations Waynesboro, Georgia 30830 Oglethorpe Power Corporation 2100 East Exchange Place

- Regional Administrator, Region ll P. O.- Box 1349 U. S. Nuclear Regulatory Tucker, Georgia 30085-1349 Commission Atlanta Federal Center Charles A. Patrizia, Esquire 61 Forsyth Street, SW., Suite 23T85 Paul, Hastings, Janofsky & Walker Atlanta, Georgia '30303 10th Floor .

-1299 Pennsylvania Avenue .

Office of Planning and Budget Washington, DC 20004-9500

-- Room 615B 270 Washington Street, SW. Arthur H. Domby, Esquire Atlanta, Georgia 30334 Troutman Sanders NationsBank Plaza Mr. J. D, Woodard 600 Peachtree Street, NE.

Executive Vice President Suite 5200-

' Southem Nuclear Operating Atlanta, Georgia 30308-2216-Company, Inc.

- P. O, Box ' 295 Resident inspector Birmingham, Alabama 35201-1295 U.S. Nuclear Regulatory Commission 8805 River Road Steven M. Jackson .Waynesboro, Georgia 30830 Senior Engineer - Power Supply-Municipal Electric Authority- Office of the County Commissioner of Georgia _

Burke County Commission 1470 Riveredge Parkway, NW. Waynesboro, Georgia' 30830 Atlanta, Georgia 30328,4684

__-