MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H7501999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209G7421999-07-0808 July 1999 Forwards SER Concluding That Licensee Individual Plant Exam of External Events Process Capable of Identifying Most Likely Severe Accidents & Severe Accident Vulnerabilities & IPEEE Met Intent of Supp 4 to GL 88-20 ML20196L0121999-07-0808 July 1999 Forwards Safety Evaluation Granting First 10-Year Interval Inservice Insp Requests for Relief B-6 (Rev 2),B-7 (Rev 2), B-12,B-13,B-14 & C-9,pursuant to Tile 10CFR50.55a(g)(6)(i) ML20196K6771999-07-0202 July 1999 Ack Receipt of & Encl Scenario for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721-22.Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20196J4881999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid as Version 2 ML20196J0401999-06-29029 June 1999 Forwards Safety Evaluation Re Plant,Units 1 & 2 Proposed Changes to Emergency Plan ML20196E6641999-06-22022 June 1999 Forwards Insp Repts 50-445/99-11 & 50-446/99-11 on 990418- 0529.No Violations Noted.Licensee Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance & Acceptable Radiological Control ML20207H3801999-06-0909 June 1999 Forwards Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Violations Identified & Being Treated as Noncited Violations ML20195G3771999-06-0909 June 1999 Ack Receipt of Ltr & Encl Objectives for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721.Based on Review,Nrc Determined That Exercise Objectives,Appropriate to Meet Plan Requirements ML20207G3291999-06-0707 June 1999 Ack Receipt of Which Transmitted Rev 27 to Comanche Peak Steam Electric Station EP Under Provisions of 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of EP No NRC Approval Required ML20207E9291999-06-0202 June 1999 Discusses 990526 Request That USNRC Exercise Discretion Not to Enforce Compliance with TS 4.8.2.1e Re Performance of Battery Performance Discharge Test,In Lieu of Battery Svc Test.Concludes Action Satisfactory & Discretion Exercised ML20207D7111999-05-28028 May 1999 Advises That Info Contained in Licensee 990514 Submittal Re License Amend Request 98-01-0 Will Be Withheld from Public Disclosure,Per 10CFR2.790. 10CFR2.790 ML20207D7011999-05-27027 May 1999 Advises That Info Contained in TU Electric 990514 Submittal (TXX-99115) Re License Amend Request 98-010 Will Be Withheld from Public Disclosure (Ref 10CFR2.790),per 990511 Application & Affidavit ML20207B7241999-05-25025 May 1999 Advises That Info Contained in Application & Affidavit 990507 (CAW-99-1333),submitting WCAP-15004,dtd Dec 1997,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20206Q0031999-05-14014 May 1999 Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 ML20206P5961999-05-12012 May 1999 Forwards Insp Repts 50-445/99-09 & 50-446/99-09 on 990419- 23.No Violations Noted.Nrc Determined That Releases of Radioactive Waste Effluents Controlled,Monitored & Quantified Well ML20206N7061999-05-12012 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206S5841999-05-11011 May 1999 Forwards Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint & Acceptable Radiological Controls ML20206K0311999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info,Without Encl ML20206H1701999-05-0606 May 1999 Forwards Copy of Exemption & Safety Evaluation Supporting Requirement in App K to 10CFR50.Proposal Will Use New Feedwater Flow Measurement Sys to Allow More Accurate Measurement to Thermal Power ML20206K3931999-05-0505 May 1999 Ltr Contract,Task Order 41, Comanche Peak Safety System Engineering Insp, Under Contract NRC-03-98-021 ML20206G1221999-05-0303 May 1999 Discusses 981215 Request That Document, Responses & Further Clarifications to NRC Questions from 980929 Meeting, Be Withheld from Public Disclosure.Determined Information to Be Proprietary & Will Be Withheld from Public Disclosure ML20206F5711999-04-30030 April 1999 Forwards Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Insp Re Focus on Radiation Protection Program Activities During Unit 2 Refueling Outage ML20206E5211999-04-27027 April 1999 Discusses GL 96-01 Issued on 960110 & TU Responses, ,970102 & 980502 for Cpses,Units 1 & 2.Determined That Submittals Provided Both Info Requested & Responses Required by GL 96-01 ML20206B3831999-04-23023 April 1999 Forwards FEMA Final Rept for 990311,Comanche Peak Steam Electric Station Medical Drill.No Deficiencies or Areas Requiring Corrective Actions Identified ML20206B5321999-04-22022 April 1999 Ack Receipt of Ltrs Dtd 970407,09 & 0204,which Transmitted Revs 6 & 7 to Safeguards Continency Plan,Rev 10 to Security Training & Qualification Plan & Rev 29 to Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20206A2301999-04-14014 April 1999 Refers to Public Meeting Conducted on 990329 in Glen Rose, Tx Re Results of Plant Performance Review Completed on 990211 & Transmitted to Licensee on 990319.List of Attendees Encl ML20205L8711999-04-0707 April 1999 Forwards Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Were Identified.Review of Operability Evaluation Re MOVs Disclosed That Licensee Failed to Include Info About Degraded ECCS Performance ML20205L1051999-04-0606 April 1999 Informs of Completion of Review of Tuec 980312 Submittal Re GL 97-05, SG Tube Insp Techniques. No Concerns Identified with SG Insp Techniques Employed at Cpses,Units 1 & 2,that Would Indicate Noncompliance with Current Licensing Basis ML20205F9141999-04-0101 April 1999 Informs That as of 990329 Dh Jaffe Has Been Assigned as Senior Project Manager for Plant IR 05000446/19920491999-03-24024 March 1999 Discusses Concern That Postulated Fire in CR Could Create Single Hot Short in Control Circuitry of MOVs Resulting in Spurious Operation.Required Hardware Mods Implemented to Control Circuits of Affected Mov,Per Insp Rept 50-446/92-49 ML20204F3311999-03-23023 March 1999 Forwards Discussion Items for 990323 Telcon 1999-09-07
[Table view] |
Text
_
. ... (pop O/6 UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION
- e WASHWOTON, D. C. 20555 w- W Ms. Billie Pirner Garde Citizens Clinic Director Government Accountability Project 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, DC 20036 TO F01A-85-614
Dear Ms. Garde:
This is in further response to your letter dated August 29, 1985, in which you requested, pursuant to the Freedom of Infonnation Act, all records relevant to the NRC staff's determination of a potential material false statement on U-Bolt sample, BN 85-077, that was issued on ' August 20, 1985, in regard to the Comanche Peak nuclear power plant.
The documents listed on enclosed Appendix B are being placed in the NRC's Public Document Room (PDR) located at 1717 H Street, NW, Washington, DC, in file folder FOIA-85-614 under your name.
The documents listed on enclosed Appendix C are available in other PDR files under the accession numbers indicated beside the document descriptions.
The documents listed on enclosed Appendix D are being withheld from public disclosure pursuant to Exemption 5-of the F0IA (5 U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5) of the Commission's regulations because they contain the predecisional advice, opinions, and recomendations of the staff. Release of the withheld documents would tend to inhibit the open and frank exchange of ideas essential to the deliberative process. There are no reasonably segregable portions of the withheld documents, and they are being withheld in their entirety.
Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined that the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The persons responsible for the denial of the documents listed on Appendix 0 are the undersigned and Mr. . lames M. Taylor, Director, Office of Inspection and Enforcement. -
8604020610 860307 PDR FOIA GARDE 85-614 PDR
Ms. Billie Pirner Garde -
2--
This denial may be appealed to the Executive Director. for Operations within 30 days from the receipt of this letter. Any such appeal must be in writing,
- addressed to the Executive Director for Operations, U.S. Nuclear Regulatory -
Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial FOIA Decision."
Sincerely, 4 w YA vb 7 Donnie H. Grimsley, Director Division of Rules and Records ,
Office of Administration
Enclosures:
As stated i
f O
4 0
L r
emis--- ,--e---we ee,-~ e -
-p m ---g-r-e,-- e---gy- c.--%% p- ,--c.-v.--,-o, -
wy- - - y--*- y e
-7 . .
GO GOVERNMENT ACCOUNTABluTY PROJECT 1555 Connecticut Awnue, N.W., Suite 202 Washington D.C. 20036 (202)232-8550 August 29, 1985 FREEDOM OF INFORMATION ACT REQUEST FREEDOel OF INFORWATK)N Director- I Office of Administration Nuclear Regulatory Commission
[O.E[ e$- g, / f' Washington, D.C. 20555 sh *
-(("
To Whom It May Concern:
Pursuant to the Freedom of Information Act ("FOIA"), 5 U.S.C. $552, the Government Accountability Project (" GAP")
requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapos, transcripts, summaries, interview reports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, computer runoffs, any other data compilations, interim and/or
? final reports, status reports, and any and all other records relevant to and/or generated in connection with the Staff's determination of Applicant's potential material false statement on U-Bolt sample (BN 85-077), issued August 20, 1985. Include in the-response any and all OI investigations of the issue.
This request includes all agency records as defined in 10 C.F.R. $9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and A.3 (approved October 8, 1980) whether they currently exist in the NRC official, " working", investigative or other files, or at any other location, including private residences.
If any records as defined in 10 C.F.R. $9.3a(b) and the NRC Manual, supra, and covered by this request have been destroyed and/or removed after this request,.please provide all surrounding records, ' including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection'with, and/or issued in order to implement the action (s).
,m-
+< %
4 t
GAP requests.that fees be waived, because " finding the information can be considered as primarily benefitting the general public," 5-U.S.C. {552(a)(4)(a). GAP is a non-profit, i non partican public interest organization concerned with honest and open government. Through public outreach, the Project promotes whistleblowers as agents of government accountability.
Through its Citizens Clinic, GAP offers assistance ~to local public interest and citizens groups seeking to ensure the health and safety of their communities. The Citizens Clinic is currently assisting several citizens groups, local governments and intervenors in the central Texas area concerning the '
construction of the Comanche Peak nuclear power plant.
We are requesting the above information as part of an '
ongoing monitoring project on the ' adequacy of Region IV and the NRC's efforts to protect.public safety and health at nuclear
For any documents or. portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld.
This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir. 1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten days.
Sincerely, b
Billie Pirner Garde Director, Citizens Clinic
..--%e e
Re: FOIA-85-614 APPENDIX B
- 1. 07/23/85 Note from H. Denton to H.' Thompson and V. Noonan (1 page)
- 2. 04/22/85 Notes on 4/22/85 meeting (2 pages)
- 3. . 04/30/8 5 Memorandum from W. Paul Chen (ETEC) to V. S. Noonan (NRC),
CPSES - Assessment of Apparent Omissions in Applicant's Motion for Summary Disposition Regarding Cinched Down U-Bolts (6 pages) 4 03/29/85 Note from D. Terao to V. Noonan, Potential Misleading Statement by Applicant Regarding AWS/ASME Weld Design (2 pages) *
.5. -
04/03/85 Memorandum from V. Noonan to R. Bosnak, Assistance to Comanche Peak Project w/ attached note V. Stello to W. Dircks dtd 3/27/85
- 6. 04/05/85 Note from V. Noonan to R. Bosnak (1 page)
- 7. Undated Viewgraph: Meeting with Applicant on U-Bolt Sample (1 page)
- 8. 08/06/84 Discussion on Motions for Summary Disposition Filed by
~
, Applicant (87 pages) ~
s 4
e i
Re: F0!A-85-614
-APPENDIX C DATE DOCUMENT DESCRIPTION
- 1. 08/20/85 Board Notification No. 85-077: Staff's Detemination of Applicant's Potential Material False Statement on U-Bolt Sample (Accession f: 8508210260)
- 2. 11/26/84 Memorandum from V. Noonan to R. DeYoung: Comanche Peak Project Staff request for Office of Inspection and Enforcement advice on potential material false statement made by Applicants (withoutenclosures)
(Accession f: 8412050260)
- 3. 03/21/85 Memorandum from J. Taylor to V. Noonan: Office of Inspection and Enforcement request for additional information through Office of Investigations *
, (Accession f: 8508220247)
- 4. 04/04/85 Note from R. Vollmer to D. Eisenhut : Office of Inspection and Enforcement action pending until NRR review of technical issues Accession f: 8508220403)
- 5. 06/28/85 Memorandum from V. Noonan to J. Taylor: Staff's assessment of significance of Applicant's U-Bolt sample discussed in Applicant's motion for sumary disposition regarding cinched down U-bolts (Accession f: 8508220255)
- 6. 06/07/85 Memorandum from L. Shao to V. Noonan: Staff's assessment of significance of Applicant'sU-Bolt sample discussed in Applicant's motion for sumary disposition regarding cinched down U-Bolts (Accession f: 8508220262)
- 7. 06/07/85 Staff's as'sessment of significance of Applicant 's U-Bolt sample discussed in Applicant's motion for summary disposition '
regarding cinched down U-Bolts (Accession f 8508220267)
- 8. 07/19/85 Memorandum from J. Taylor to V. Noonan: Office of Inspection and Enforcement determination that Applicant has not'made a material false statement (Accession if ~ 8507310381)
- 9. 01/07/85 Affidavit of Robert C. Iotti and John C. Finneran, Jr.,
Regarding the Licensing Board's December 18,.1984, Memorandum (Accession f: 8501090396)
- 10. 12/18/84 Memorandum from the Board Reopening Discovery: Misleading Statement
'(Accession f: 8412190262)
O
_ _ _ _ . - -_ -_m< ~ ~.. .m,- ,
.m-w. . . <
- m. , . _
. i' r, -
- 11. 04/16/85 Memorandum from A. Vietti to V. Noonan : Forthcoming Meeting with Texas Utilities (Accessionf: 8504250382)
- 12. 04/22/85 U-Bolt meeting Attendance (Available in BN 85-053)
(Accession f: 8505100346)
- 13. 04/22/85 Overview of Presentation Regarding U-Bolt Torque Sample (Available in BN 85-053)
(Accession #: 8505100346)
, 14 . - 03/21/85 Memorandum from J. Taylor to V. Noonan: Possible Material False Statement concerning U-Bolt Supports at CPSES (Accession #: 8508220247)
- 15. 01/07/85 Motion of Reconsideration of Licensing Board's Memorandum (Reopening Discovery; Misleading Statement) .
. (Accession f: 8501090378)
- 16. 06/29/84 Letter from W. Horin (TUGCO) to P.-B. Bloch and K. McCollom:
Applicant's Motion for Summary Disposition of CASE's Allegations Regarding Cinching Down of U-Bolts (Accession f: 8407020516)
- 17. 06/29/84 Applicant's Motion for Summary Disposition of CASE's Allegations Regarding Cinching down of U-Bolts (Accession f: 8407020527)
- 18. 06/22/84 Affidavit of Robert C. Iotto and John C. Finneran, Jr.,
Regarding Cinching down of U-Bolts (Accession f: 8407020527)-
- 19. 11/05/84 CASE's Answer to Applicant's Response to Board Request for Information Regarding Cinching Down U-Bolts (Accession f: 8411090299)
- 20. 11/05/84 CASE's transmittal of Affidavit of CASE's Witness Jack Doyle. ,
(Accession f: 8411090281)
- 21. 11/05/84 CASE's Answer to Applicant's Response to Board Request for .
Information Regarding Cinching Down U-Bolts (Accession f: 8411090299)
- 22. 11/09/84 Applicant's Response to Board Request for Raw Data Regarding Cinching Down U-Bolts . -
(Accession #: 8411130719) ,
- 23. 11/09/84 Affidavit of John C. Finneran, Jr., Regarding'Information Related to Cinching Down of U-Bolts (Accession f: 8411130722)
- 24. 10/24/85 Memorandum from the Board (Raw Data on U-Bolts)
(Accession f: 8410260090) 9
.sy- +-
. . . _ . - - ..._ . _ _ __ . _ _ - ~ _.. . . . _ _ . _ . . . _ . . . . . - . _ . _ . - . . . _ . . . . _ _ .
.if.
+ -
i
- 25. 10/24/84 Applicant's Response to Board Request for Infonnation Regarding Cinching Down U-Bolts (Accession #: 8411060557)
- 26. 02/03/84 Applicant's Plan to Respond to Memorandum and Order (Quality Assurance.ofDesign) -
(Accession #: 8402070227)
- 27. 03/13/84 Supplement to Applicant's Plan to Respond to Memorandum and Order (Quality Assurance for Design)
(Accession f: .8403150032)
! 28. ~1 2/28/83 ASLB Memorandum and Order (Quality Assurance for Design)
(Accession I: 8401260285)
- 29. 02/08/84 ASLB Memorandum and Order (Reconsideration Concerning Quality Assurance for Design)
,(Accession f: 8402090121) -
30.-- 10/23/84 Applicant's Response to Board Request for Information Regarding l Cinching Down U-Bolts (Accession f: 8410250005)
, .31. 11/19/84 Applicant's Reply to CASE's Motion' Concerning Information i
Regarding Cinching Down U-Bolts (Accession f: 8411270189)
- 32. . 11/19/84 Affida.vit of John C. Finneran, Jr., Regarding CASE's Motion Concerning Sampling of Cinched Down U-Bolts (Accession f: 8411270196)
- 33. 03/29/85 Memorandum from D. Terao to V. Noonan : Staff findings on the Discrepancy In U-Bolt Test Results (Accession # 8504090415)
- 34. 04/22/85 Technical Conference between Texas Utilities and Comanche Peak 4
Project Team, (Available in BN 85-053) '
(Accession f 8505100346) i
- +
V i
4 - ,
t
~
I :
4 j -
i - ' .
+
. - ' " T'""::"_T: r t:m:r:lcn~~r: rc~~~~~~m~~rer~~+~rv .- -. ::.L _ _ - -
Re: FI0A-85-614 APPENDIX D l
- 1. Undated notes of E. Haller (4 pages)
- 2. January 9,1985 - Note to J. Axeirad, IE, from E. Holler, IE,
Subject:
Comanche Peak - Alleged "U" Bolt Material False Statement (1 page)
- 3. March 21,1985 - Memorandum for W. J. Dircks, EDO, from J. M. Taylor IE,
Subject:
Request for an Investigation by the Office of Investigations (1'page)
- 4. Undated / Unsigned memorandum to B. Hayes, 01, from W.J. Dircks, EDO,
Subject:
Possible Material False Statement Concerning U-Bolt Supports at Comanche Peak Steam Electric Station (1 page) i m.