NUCLEAR REGULATORY COMMISSION UNITED STATES
-/
""/.t WASHINGTON, D. C. 20555
% %=
l DEC 16 1983 MEMORANDUM FOR:
Faust Rosa, Chief p
Instrumentation and Control Systems Division of Systems Integration FROM:
Voss A. Moore, Chief Human Factors Engineering Branch Diyision of Human Factors Safety
SUBJECT:
SPDS SAFETY ANALYSIS REPORT (SAR) REVIEW FOR DIABLO CANYON A copy of the subject SAR has been distributed to you via the Regulatory Information Distribution System (RIDS).
Please review the SAR to ensure that the SPDS is suitably' isolated from electrical or electronic interference with equipment and sensors that are in use.for safety systems.
If the licensee has not provided adequate design data in the SAR please formulate your request for information and forward it to us one week from the date on this memorandum.
Our schedule for a Safety Evaluation Report (SER) on the SAR is one month from NRC receipt of the report.
If'the licensee's SAR is acceptable for your review, please conduct the review and forward your SER input by three weeks from the date on this memorandum.
ph Yd's-C Voss A. Moore, Chief Human Factors Engineering Branch Division of Human Factors Safety cc:
D. Crutchfield J. Joyce u
Contact:
L. Beltracchi x24879 0
-Q h
gwwat y
W
i'/
Docket Nos.:
50-275 and 50-323 MEMORANDUM FOR:
R. Mattson, Director. Division of Systems Integration R. Vollmer. Director Division of Engineering FROM:
B. G. Eisenhut, Director, Division of Licensing
SUBJECT:
DIABLO CANYON SSER-20 Attached is the final draft of the Diablo Canyon SSER-20 regarding items that must be resolved prior to Step 2 (criticality and low power testing).
Input was provided as follows:
Section C.3:
P. T. Kuo B. Jagannath M. Hartzman H. Polk Section C.4:
J. Wenniel J. Knox M. Hartzman H. Walker R. LaGrange These contributors have reviewed an earlier draft of SSER-20.
Remaining sections were prepared by H. Schierling, Project Manager.
Please review Section 5 - Summary and Conclusions. The report is currently in final type with CRESS and can be issued imediately thereafter.
Please indicate your concurrence on-this memorandun.
1 i
h!cinal signed by
-C :c 2 3.Ilsechut Darrell G. Eisenhut. Director Division of Licensing DISTRIBUTION cc:
J. Knight Document Control (50-275/323)
L. Rubenstein NRC PDR PRC System LB#3 Reading GWKnighton JLee u e - u. u,,,,
gt y,,./gg' h$Nnhut
\\@
t DL:LB#3g D
83 L:DL L
o,,,c,,
i
=ner >..Hkh.i.er.W. 9 1 L....Mnigh,tcn,,
,,, t, f
. h.L.09..
.p...l..O.aa.
..jfMi...&/Vpys.
ems 1
i a c roav s a. a se, N= v m :
OFFICIAL RECORD COPY a.., -a -
n
- g ug4'o, 3
UNITED STATES 7
EV
,f' 7-NUCLEAR REGULATORY COMMISSION c
WASHINGTON. D. C. 20S55
%.)i. #
DEC 2 31983 Docket Nos.: 50-275 50-323 3
MEMORANDUM FOR:
Chairman Palladino Comissioner Gilinsky Commissioner Roberts Commissioner Asselstine Comissioner Bernthal FROM:
William Dircks, Executive Director for Operations
SUBJECT:
DIABLO CANYON SSER 20 - CRITICALITY / LOW POWER AUTHORIZATION WITH RESPECT TO DESIGN VERIFICATION PROGRAM Attached is SSER 20 for the Diablo Canyon Nuclear Power Plant, Unit 1.
SSER 20 presents the staff safety evaluation of those issues that resulted from the design verification effort and which previously were discussed in SSER 18, SSER 19 and in my memorandum to you dated November 7,1983.
We have ' concluded that those issues, flowing from the IDVP/ITP, which require a satisfactory resolution prior to authorizing criticality and low power testing (Step 2) have been satisfactorily resolved.
Final resolution of the remaining open items will be achieved prior to full oowyeauthorization(Step 3).
We hote, however, that the staff's status report related to our review of allegations is nearing completion and will be provided early next week.
That transmittal will orovide our position with respect to Step 2 as a result of our review of allegations.
,/"
/
William Dircks', Executive Director g
for Operations
Enclosure:
As Stated cc: