Requests Completion of Audit of Status of Util Actions Responding to Followup Items 1,2,9 & 12 in Sser 18,to Allow Inclusion of Results in Next SER Suppl
ML20209C640
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 12/06/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20209B094 List: ... further results
References
NUDOCS 8312190417
Download: ML20209C640 (2)


Text

I

'. g ;f) "' ",,,

e

+

s

[o, UNITED STATES II s.

c.,

3g g

NUCLEAR REGULATORY COMMISSION

  • ""v~**

~

5

~E WASHINGTON. D. C. 20555 o

%, v,/

DEC 6 m Docket Nos.:

50-275

~

and 50-323 MEMORANDUM FOR:

John B. Martin, Regional Administrator, Region V FROM:

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation

SUBJECT:

DIABLO CANYON - VERIFICATION OF SSER FOLLOW-UP ITEMS SER Supplement 19 for Diablo Canyon lists 15 Follow-up Items in Table C.8.3 which originally had been identified.in SER Supplement 18.

By letter of November 14, 1983 we rtquested the licensee to provide a status on each item.

The licensee responded by letter of November 28, 1983. We request that you audit and verify the licensee's actions on items 1, 2, 9 and 12 as discussed on December 5,1983 by H. Schierling with T. Bishop.

We request that you complete this audit by December 14, 1983 so that the results can be included in our next SER. Supplement.

\\

\\

.r.

\\

p bkector r Tf. Efs t

Division of Licensing Office of Nuclear Reactor Regulation cc:

J. Knight T. Bishop J. Wermiel P. Morrill H. Schierling

&Yh

/>

i l

swm g.

N

~

P Docket Nos.: 50-275 DEC 6 1983 and 50-323 MEMORANDUM FOR:

John B. Martin, Regional Administrator, Region V FROM:

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation

SUBJECT:

DIABLO CANYON - VERIFICATION OF SSER FOLLOW-UP ITEMS SER Supplement 19 for Diablo Canyon lists 15 Follow-up Ittms in Table C.8.3 which originally had been identified in SER Supplement 18.

By letter of November 14, 1983 we requested the licensee to provide a status on each item.

The licensee responded by letter of November 28, 1983. We request that you audit and verify the licensee's actions on items 1, 2, 9 and 12 as discussed on December 5,1983 by H. Schierling with T. Bishop. We request that you complete this audit by December 14, 1983 so that the results can be included g

in our next SER Supplement.

,-:gt -'slem nf gg:c.; u. risc:ous Darreil G. Eisenhut Division of Licensing Office of Nuclear Reactor Regulation cc:

J. Knight T. Bishop J. Wermiel P. Morrill H. Schierling DISTRIBUTION H. Denton Document Contro150-275/323 PRC System LB#3 Reading JLee TMNovak HSchierling LChandler GWKnighton DGEisenhut k(

DL:LBd3 4J D

DL R

HSchierh ng/y Q nfghton T

  • 1 ut 12/g/83 12/4/83 1

/83 12/ /83 svwWp

_. '.:s. ~.7,',, y., ; -[

" y > -

.[.;.-Q

{

~

,= -

.. n. :. a : \\

c',-y; l ]'

  • V * [l *%:., ';j.

P.

 ? ;l.' "'s,.Q e

pi DISTRIBUTION I

Docket Nos.: 50-275 DEC 0 71983 Decument Control (50-275/323) f]

and 50-323 L PDR 5

NRC PDR t

PRC System MEMORANDUM FOR:

H. Denton LB43 Reading Lc E, Case JLee J

J. Carter b

diahsamaser 3

D. Eisenhut BBuckley IF H. Thompson GWKnighton R. Vollmer Artorney, DELD R. Mattson T. Speis J. Sniezek o

T. Ippolito T. Movak G. Lainas l

F. Miraglia G. Holohan t.

FROM:

Hans Schierling, Project Manager Licensing Branch No. 3 Division of Licensi.ng

SUBJECT:

DAI1.Y JiIGHLIGHT

i Diablo Canyon, Unit.1,

rie 1.

The primary system is " solid" at 400 psi. 'Riactor Coolant pimips k.

have been operated on the 1-minute and 10-minute cycles.,

c t

2.

The missile shield is in place and remaining modification work j

has been started on the dome service crane.

3.

The condenser hydrotest is complete. Several condenser tubes have 3

j leaks in the rolled joint on the tube sheet (tubes can be rerolled

' i tostopleakage).

T 2

4.

Testing of the control rod drives has been started (current test, J;

coil current test and rod drop test).

l-The infonnation is current as of December 6.*1983.

i f u.t n s W hy:

hk33 Schiertag Hans Schierling, Project Manager Licensing 4 ranch No. 3 Division of Licensing

[

3 1

cc:

S. Black

)

))

gt[on

~

2

.DL B/Cs DL:LB#3 DL:L g

HSchig

ft 83 l} /d/83 M W M M 03-~

. ~..

n..

P P

L'

'g, bsc y

H.E_* PGSARY NOTIFICATICS OF EVENT OR UNUSUAL OC ' RRENCE-PNO-V-83-59 Date: 12/02/83ffl

/~l-/

~ ~ ~ ~

This prelininary notificacion constitutes EARLY n.c of events of POSSIBLE safet, or public interest significance.

The information'is,as initially received without verification or aIYthat is known by NRC staff on this date.

evaluation and is basically /

Facili,ty: N/A Emergency Classification:

Notification of Ur. usual Ev, Alert Site Area Emergency General E=ergency X Not Applicable

SUBJECT:

NUCLEAR PLANT QUALITY ALLEGATIONS MADE TO LOCAL TV STATION A former velding inspector at Bostrom Berg :n Metal Products Company of Oakland, California, has contacted a San Francisco television station, KGD-TV (ABC), with allegatiois that he f alsified various inspection documentation on f abricated metal products sold to Diablo Canyon, South Texas, Comanche Peak, and an unidentified WPPSS project. The television station has centacted Region V and Bostrom Bergen concerning the allegations but has not yet aired a story.

The TV reporter contacted the Region V Public Af f' airs Officer about the allegations on the afternoon of December 6.

The reportar put the alleger lu cuutact with the Dieuctor. of the Region V Office of Investigations.

On Dece=ber 7,1983, an executive of Bostrom Bergen contacted the Region V duty officer.

Ile snid that Bostro::t Bergen had been confronted with these allegations by a TV reporter several days earlier.

He said the Company has conducted an investigation which ha.s largely refuted the allogationc.

The Region V inspection team at Diablo Canyon looking into other allegations has been Ande aware of the new charges. The Region IV Vendor Inspector Branch has been notified.

This information is current as of 9 a.m. PST on Thursday, December 8,1983.

CONTACT:

J. KANCHETT, FTS 463-3712 D15IRIBUTION:

p

//lJf~~

H St.

//l2 2.- Av MNBB hr;cil Phillips E/W Chairman Palladtno EDO NRR LE Willste Air Rights

~

NMSS Cor=. G111nsky PA OIA RES Mail:

Com=. Bernthal MPA AEOD ADM:DMB Cor.s. Roberts ELD DOT: Trans only Cor:m. Asselstine RegionsJ' #1.M SECY ' ACRS -

CA TNPO NSAC PDR Resident Inspector Licensee (Reactor):

RV: FORM 211 (revised 3/14/S3) p[

mn i c cul2 i

o

r s.

.1 DISTRIBUTION P'

Document Centrol (50-275) i-L PDR NRC POR PRC System Docket No.: '50-275

.e DEC 0 91983 LB#3 Reading JLee MEMORANDUM FOR:

H. Denton C -... :...,

E. Case GWKnighton

~

J. Carter Attorney, OELD D. Eisenhut J. P. Knight R. Purple J. Wermiel H. Thompson R. Vollmer R. Mattson T. Speis J. Sniezek T. Ippolito T. Novak G. Lainas F. Miraglia G. Holohan FROM:

Hans Schierling, Project Manager Licensing Branch No. 3 Division of Licensing

SUBJECT:

DAILY HIGHLIGHT Status of Diablo Canyon Unit 1

~

1.

Control rod testing approximately 70% complete, IAC still. working on position indicator problem with one drive assembly.

2.

Between 12/8/83 and 12/12/83 reacter temperature will be increased to approximately 165*. Chemical control will be established on the primary loo ~p.in'preparatioh:.for heatasp. arid criticalityjphaie : l't -

To assure positive control of oxyger., all exposed areas will be inerted with nitrogen.

3.

Condensate flush preparations are in progress and program is scheduled to start on 12/12/83.

4.

Cold system tests scheduled for completion on 12/15/83.

l#

Information is current as of December 8, 1983.

6:.

Nais.. Sch,'c;Rng

Hans Schierling, Project Manager Licensing Branch No.~3 k.

Division of Licensing

(

t-cc:

S. Black 1

9J

[

DL B/Cs DL:LB#3 D lB HSchierling:ft K

ton 1/ $/83 p/q/83

~~

20.:10 20#

ITO9182 OS Y I T 80'/31

~ /c#nwi3irs ar d

~~

[ DMEMB1:R SM98[

~

., v v

e q,%

Control rod. test' paNHywem.a 1.

still working on position.pproximately 700 complete.

IEC indicator probism with one drive

. assembly.

2.

Between 12/8/83.and 12/12/83 rgachdr temperature will.he-

. increased to.hpproximately 165

. Chemical control will be established bn th'e primary loop in preparation for heataup

.and criticality phase.

To assure positive control of oxygen, all, exposed areas will be.inerted with ni.trogen.

3 Condensate flush preparatidne are in progress.and program is

- schedule-d to start on 12/12/83.

4.

Cold sy, stem tests scheduled for completion on 12/15/83.

g

a.

Activities at Otablo Canyon for December 7,190 1.

Control rod testing still in progress. Three rod clusters in Banks A and 8 to be empleted.

2.

Wash-down in main un!t condenser to remove the die used in the hydro test is in progress.

3.

Scheduled to start acid cleaning the secondary system on December 15, 1983.

1

. - ~ - -