ML20209C339

From kanterella
Jump to navigation Jump to search
Trip Rept of Attendance at 830727 Meeting in San Francisco, CA Between Idvp & Util Re Status of Closure Efforts on Open Items in Idvp Final Rept.Projected Date for Issuance of Idvp Final Rept Suppl Is mid-Sept 1983
ML20209C339
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 08/08/1983
From: Polk H
Office of Nuclear Reactor Regulation
To: Lear G
Office of Nuclear Reactor Regulation
Shared Package
ML20209B094 List: ... further results
References
NUDOCS 8308160017
Download: ML20209C339 (4)


Text

  • -% ~~. pa near

.g'

$o UNITED STATES g

y*e g

NUCLEAR REGULATORY COMMISSION

\\.),*[.

AUG[ 1983

.M MEMORANDUM FOR: George Lear, Chief Structural and Geotechnical Engineering Branch Division of Engineering h

THRU:

T. Kuo, Leader Structural Engineering Section B Structural and Geotechnical Engineering Branch Divisi,on of Engineering FROM:

Harold Polk, Structural Engineer Structural Engineering Section B Structural and Geotechnical Engineering Branch

-d Division of Engineering

.?

TRIPREPORTFORTECHNICALINTERCHANGEMEETINGB i,T

SUBJECT:

IDVP AND PG&E ON DIABLO CANYON VERIFICATION CLOSUR The meeting was attended by P. T. Kuo and Harold Polk of the SGEB a' staff.

consultant, Paul Bezler of Brookhaven National Laboratory.

A list of meeting attendees is enclosed.

The purpose of the meeting was to disculis the progress of the IDVP and the status of the closure efforts on the items that were left open in the IDVP Final Report.

The IDVP work remaining before the program can be closed includes completion of sampling of the design review packages on the DCP reanalysis efforts, resolution of approximately 16 E0I's, completion of the-field verification of the DCP modifications, issuance of the ITR's on the DCP reanalysis efforts, and issuance of the necessary supplements to the IDVP Final Report. The schedule presented in the meeting call.s for release of all the ITR's on the DCP verification program (ITR's 50 thru 68) by August 30, 1983. Other release dates for the ITR's was August 1 and August 15, 1983.

The IDVP proposed to use tne date of Jund 30, 1983 as the cutoff date for the review of the DCP work.

However additional DCP work has been ongoing after that date. The IDVP will review this work as it is available.

The projected date for issuing the supplement to the IDVP Final Report is mid September 1983.

' C f.

5 &

I Harold Polk, Structural Engineer Structural Engineering Section 8 Structural and Geotechnical Engineering Branch, DE cc:

J. Knight M. Hart: man A. Ke 1 Cn, DaL.

f L /

r q DoMooy

~

4

l IDVP/DCP Meeting July 27; 1983 San Fransicso, CA AM Attendees Robert S. Cahn Diablo Canyon Project (DCP)

-Peter F. Mason DCP W. H. White DCP Bimal Sarker DCP y

Bron Shieker DCP J. R. Leahy DCP J. R. Mellin DCP

^

E. Connellson DCP

0. O. Brand DCP L. E. Shiplery DCP M. R. Tresler DCE M. J. Jaccbson DCP Louis Perrelli DCP C. W. Dick DCP N. C. Anderson DCP Howard Friend DCP Edward Denison Robert L. Cloud Associates R. L. Cloud Robert L. Cloud Associates David Raskin LNRA/IDVP John Cragin Teledyne Engineering Services Ron Wray Teledyne Engineering Services Curran Roller State of California Eric Havian Joint Intervenors

. _ =

(AM Part.- Continued) j '

Sig Auer DCP

~

Charles I. Browne.

RLCA y

't Vince Stephens

.RLCA Dave Peelle RLCA Fanson Loey

'RLCA Gary H. Moore DCP-Joe Higgins DCP J. K. McCall DCP 1

e a

I I

I i

's t

6 1

  • e

~

IDVP/DCP Meeting July 27. 1983 San Franci~co, CA s

PM Attendees Robert S. Cahn Diablo Canyon Project (DCP)

M. D. Tressler DCP W. H. White DCP Peter F. Mason DCP Joe Higgins DCP Carran Roller State of California Paul Bezler BNL/NRC P. T. Kuo NRC Harold Polk NRC

~

David Raskin LNRA/IDVP John Cragia Teledyne Engineering Services.

Ron Wray-Teledyne Engineering Services Edward Denison Robert L. Cloud Assoc.

R. L. Cloud Robert L. Cloud Assoc.

i R. C. Anderson DCP Ron Pevillo DCP 4

P

-.-.,--+,-----.._,--a_.

--w, p.

..,r

-