Other: 05000346/LER-1986-015, :on 860321,domestic Water Lines Servicing Shower Eye Washes in Battery Rooms a & B Not Seismically Supported & Threatened safety-related Battery Chargers.Lines Removed.Portable Eye Wash Stations Installed, ML20076M966, ML20076M992, ML20138A211, ML20138A833, ML20138A863, ML20138E411, ML20138E443, ML20141H193, ML20141J293, ML20141J296, ML20141J352, ML20141J377, ML20141J384, ML20141J392, ML20141J401, ML20155E857, ML20155F634, ML20155G813, ML20195B451, ML20195B461, ML20195B561, ML20195B571, ML20195B841, ML20195B863, ML20195E855, ML20195F069, ML20195F083, ML20195F093, ML20197G705, ML20197G762, ML20198E208, ML20198E234, ML20198E325, ML20198J569, ML20198Q807, ML20198Q814, ML20198Q853, ML20198Q917, ML20198R025, ML20199E674, ML20199K964, ML20202F848, ML20202F877, ML20202G680, ML20202J825, ML20202J839, ML20203B345, ML20203B416, ML20203B646... further results
|
MONTHYEARML20195F0831983-05-23023 May 1983 Criticizes Public Hearings as Outrageous Farce,Idioditic & fraudulent.Full-scale Criminal Investigation of NRC Long Overdue Project stage: Other ML20076M9921983-05-31031 May 1983 Disposal of Low Level Radioactively Contaminated Secondary- Side Clean-up Resins in Onsite Settling Basins at Davis-Besse Nuclear Power Station Project stage: Other ML20076M9661983-07-14014 July 1983 Forwards Disposal of Low Level Radioactively Contaminated Secondary-Side Clean-up Resins in Onsite Settling Basins at Davis-Bessie Nuclear Power Station Project stage: Other ML20090H4961984-07-18018 July 1984 Forwards Addl Info Re Application for Disposal of Low Level Radwaste,Per 840716 Telcon Between J Swift & Wh Mcdowell Project stage: Request ML20094B8961984-07-30030 July 1984 Forwards Addl Info Re Util 830714 Request for Approval for Alternative Onsite Disposal of Very Low Level Radioactively Contaminated secondary-side Cleanup Resins Project stage: Request ML20101T4071985-01-29029 January 1985 Forwards Response to NRC Three Addl Questions Re 830714 Request for Approval for Alternative Onsite Disposal of Very Low Level Radioactively Contaminated Secondary Side Cleanup Resins,Per 10CFR20.302 Project stage: Request ML20138E4431985-09-30030 September 1985 Environ Assessment & Finding of No Significant Impact Re 830714 Request for Disposal of Low Level Radwaste.Proposed Action Will Have No Significant Impact on Human Environ Project stage: Other ML20138E4111985-10-15015 October 1985 Advises That 830714 Request to Dispose of Dredgings from Onsite Settling Basins on company-owned Land Acceptable. Environ Assessment & Finding of No Significant Impact Encl Project stage: Other ML20133K9781985-10-15015 October 1985 Forwards Independent Mgt Assessment of Toledo Edison Davis-Besse QA Program & Rept of Assessment of Actions at Davis-Besse Resulting from 850609 Loss of Feedwater Event Project stage: Request ML20141J4011986-02-0101 February 1986 Expresses Concern Re Safe Operation of Facility,Moving Spent Waste from Plant,Earthquakes & Tornados Project stage: Other ML20202J8391986-02-17017 February 1986 Resolution 1986-12 Requesting That NRC Rescind Approval for Radwaste Disposal at Plant.Served on 860415 Project stage: Other ML20203A0021986-02-17017 February 1986 Resolution 86-10 Opposing Util Application to Bury Radioactive Sludge at Plant.Served on 860415 Project stage: Request ML20205K4951986-02-25025 February 1986 Notice of Appointment of Hf Hoyt as Presiding Officer to Conduct Informal Proceeding to Consider & Decide All Issues Re Util 830714 Request for Authorization for Onsite Disposal of Byproduct Matl,Per 860220 Order.Served on 860226 Project stage: Other ML20141J3921986-03-0202 March 1986 Requests to Make Limited Appearance Statement Re Onsite Dumping of Low Level Radioactive Sludge Project stage: Other ML20138A2111986-03-10010 March 1986 Memorandum & Order Directing That Petition to Participate in Hearing Re Licensee Request for Onsite Disposal of Product Matl Be Filed by SA Carter & Other Parties by 860414.Notice of NRC Participation Required by 860428.Served on 860311 Project stage: Other ML20138A8631986-03-17017 March 1986 Forwards Listed Documents in Response to 860310 Memorandum & Order (Notice of Informal Hearing & Opportunity to Become Party) Re Util Request to Dispose of Low Level Radioactively Contaminated Matls at Plant Site.W/O Encls Project stage: Other ML20138A8331986-03-17017 March 1986 Notice of Appearance in Proceeding.Certificate of Svc Encl Project stage: Other ML20202G6801986-04-0505 April 1986 Requests to Make Limited Appearance Statement Re Facility Radioactive Waste Landfill.Unrestricted Use of Land on Which Sludge Disposed Opposed.Identities & Amounts of Buried Radioisotopes Speculative.Served on 860411 Project stage: Other ML20205M3981986-04-0707 April 1986 Amended Emergency Resolution 29-86 Urging Governor of State of Oh to Aggressively Examine & NRC to Hold Formal Hearings on Burial of Nuclear Waste on Site.Served on 860414 Project stage: Other ML20202J8231986-04-0808 April 1986 Petition of G Zatroch for Leave to Intervene & Request for Hearing Re Radioactive Sludge Disposal at Plant Site.Served on 860415 Project stage: Request ML20202J8251986-04-10010 April 1986 Requests NRC Consider Statement in Informal Hearing Re Disposal of Low Level Radwaste at Facility.Opposes Site for Ground Burial of Low Level Radwaste.Served on 860415 Project stage: Other ML20205M4671986-04-10010 April 1986 Requests to Become Party in Proceeding Re Disposal of Byproduct Matl Onsite Under Terms of 10CFR20.302(a). Organization Intends to Perform Independent Analysis of Possible Impacts of Proposed Actions.Served on 860414 Project stage: Other ML20205M5431986-04-10010 April 1986 Forwards Author to Lakewood City Council & Resolution 6004-85,per 860310 Memorandum & Order.Submittal Serves as Author Official Notice of Intent to Intervene in Informal Hearing.Served on 860414 Project stage: Other ML20205M6091986-04-10010 April 1986 Requests to Make Statement at Hearing Re Disposal of Radwaste at Lake Erie Shoreline.Nrc Should Order Util to Find Offsite Facility to Hold Low Level Radwastes.Served on 860414 Project stage: Other ML20205M8201986-04-10010 April 1986 Comments in Opposition to NRC Approval of Amend to License NPF-3 to Permit Burial of Radioactive Sludge Onsite.Served on 860414 Project stage: Other ML20203A0261986-04-11011 April 1986 Petition of Citizens for Land & Water Use,Inc for Leave to Intervene & Request for Hearing Re Util Request to Bury Low Level Radioactive Dreggings Onsite.Served on 860415 Project stage: Request ML20203B4161986-04-14014 April 1986 Forwards Petition for Intervention & Notice of Appearance in Proceeding.W/O Encls.Related Correspondence Project stage: Other ML20210S2831986-04-14014 April 1986 Submits Resolution 13-86 Requesting NRC to Rescind Approval for Disposal of Radwaste at Davis-Besse Plant Site.Served on 860501 Project stage: Other ML20203B3501986-04-14014 April 1986 Petition of Ef Feighan for Leave to Intervene & Request for Hearing Re Util Proposal to Store Low Level Radioactive Sludge Onsite.Served on 860416 Project stage: Request ML20203B6461986-04-14014 April 1986 Notice of Appearance in Proceeding.Certificate of Svc Encl. Served on 860417 Project stage: Other ML20155E8571986-04-14014 April 1986 Petition of State of Oh for Leave to Intervene as Party. W/Certificate of Svc.Served on 860417 Project stage: Other ML20155F6371986-04-15015 April 1986 Resolution 86-11 Expressing Opposition to Util Application for Permission to Bury Radioactive Sludge at Facility.Served on 860421 Project stage: Request ML20197G7051986-04-15015 April 1986 Resolution 19-1986 Opposing Application of Toledo Edison Co for Permission to Bury Radioactive Sludge at Facility & Declaring Emergency Project stage: Other ML20203B3231986-04-16016 April 1986 Petition of Save Our State from Nuclear Wastes,Consumers League of Ohio,A Gleisser & Gs Cook for Leave to Intervene & Request for Hearing on Radioactive Sludge Disposal Issue. Served on 860416 Project stage: Request ML20203B3451986-04-16016 April 1986 Requests to Become Party in Matter of Util Burying Radwaste at Facility.Served on 860416 Project stage: Other ML20155F6341986-04-17017 April 1986 Notice of Appearance in Proceeding.Certificate of Svc Encl Project stage: Other 05000346/LER-1986-015, :on 860321,domestic Water Lines Servicing Shower Eye Washes in Battery Rooms a & B Not Seismically Supported & Threatened safety-related Battery Chargers.Lines Removed.Portable Eye Wash Stations Installed1986-04-18018 April 1986
- on 860321,domestic Water Lines Servicing Shower Eye Washes in Battery Rooms a & B Not Seismically Supported & Threatened safety-related Battery Chargers.Lines Removed.Portable Eye Wash Stations Installed
Project stage: Other ML20203D7401986-04-18018 April 1986 Raises No Objection to Treating RM Bimber Presenting Views on Burial of Very Low Level Radwaste,As Limited Appearance Statement.Bimber Fails Requirements to Be Party to Proceeding Project stage: Other ML20203D7501986-04-19019 April 1986 Provides Cover Ltr Inadvertently Omitted from . Forwarding of Notices & Correspondence to Stated Address Requested.Related Correspondence Project stage: Other ML20141J3771986-04-21021 April 1986 Comments in Opposition to Burying Low Level Radioactive Sludge Onsite.Recommends Public Hearing on Onsite Disposal. Served on 860425 Project stage: Other ML20141H1931986-04-22022 April 1986 Response Opposing Citizens for Land & Water Use 860411 Petition for Leave to Intervene.Petitioner Failed to Plead Admissible Contention to Identify Deficiencies in Licensee Method of Low Level Waste Disposal.W/Certificate of Svc Project stage: Other ML20141J3841986-04-23023 April 1986 Response Opposing Petition of City of Ashtabula,Oh for Leave to Intervene.Certificate of Svc & Svc List Encl Project stage: Other ML20141J3521986-04-23023 April 1986 Advises That Encl TC Brown W/Resolution Passed by City of Lakewood,Oh on 860106 Should Be Treated as Limited Appearance Statement & Not as Official Notice of TC Brown Intent to Become Party to Hearing.W/O Encl Project stage: Other ML20141J2961986-04-23023 April 1986 Requests That League of Ohio Sportsmen Forwarding Resolution Addressing Burial of Very Low Level Radwaste Be Treated as Limited Appearance Statement Project stage: Other ML20141J2931986-04-23023 April 1986 Requests That Lj Lucas Re Burial of Very Low Level Radwaste Be Treated as Limited Appearance Statement Project stage: Other ML20203G1931986-04-23023 April 1986 Response Opposing G Zatroch 860408 Petition for Leave to Intervene.No Objection to Treating Ltr as Limited Appearance Statement.Petitioner Failed to Demonstrate Right of Standing.W/Certificate of Svc & Svc List Project stage: Other ML20210K7421986-04-25025 April 1986 Requests That Councilman Kay 860210 Intervening Statement Be Treated as Limited Appearance Statement.Requirements to Become Intervening Party Not Met.Mayfield Heights,Oh,Too Far to Confer Standing.Related Correspondence Project stage: Other ML20210K7511986-04-25025 April 1986 Response Opposing Petition of PE Dornbusch for Leave to Intervene.Suggests That Petition Be Treated as Limited Appearance Statement.Dornbusch Ltr Fails to Comply w/860310 Memorandum & Order.W/Certificate of Svc Project stage: Other ML20210L3651986-04-25025 April 1986 Requests That Congressman Feighan 860414 Petition to Participate in Proceeding Be Treated as Limited Appearance Statement & Not as Petition to Intervene Per 10CFR2.714(d). Related Correspondence Project stage: Other ML20210L3791986-04-25025 April 1986 Requests That Councilwoman J Klein Intervening Statement Re Resolution 86-10 Be Treated as Limited Appearance Statement. J Klein Has Not Met Requirements to Become Intervening Party.Resolution Deficient in Citations & Supporting Data Project stage: Other 1986-04-10
[Table View] |
Text
ikbh E
DOLKETED NNRC UNITED STATES OF A R
NUCLEAR REGULATORY COMMISSION h
, _ Lw Y J100 Before the Administrative Judge In the Matter of
)
)
TOLEDO EDISON COMPANY, et al.
)
Docket No. 50-346-ML
)
(Davis-Besse Nuclear Power
)
Station, Unit No. 1)
)
LICENSEE'S RESPONSE OPPOSING THE PETITION OF GEORGE ZATROCH FOR LEAVE TO INTERVENE The Toledo Edison Company et al.
(" Licensee") hereby re-sponds to the letter from George Zatroch to the NRC, dated April 8, 1986, petitioning for leave to intervene.
Licensee submits that Mr. Zatroch's request should be denied.
Licensee has no objection to Mr. Zatroch's letter being treated as a limited appearance statement.
I.
Introduction This proceeding involves the authorization which the Nuclear Regulatory Commission granted to the Licensee to bury very low-level radioactive waste at the Davis-Besse site.
The 8604280372 860423 PDR ADOCK 05000346 h(.2)
e 0
waste in question is resin from the Davis-Besse plant's second-ary system demineralizer.
Approval of Licensee's proposal was sought in ace
- dance with 10 C.F.R. S 20.302(a) and IE Information Notice No. 83-05 (February 24, 1983), and was granted by the Nuclear Regulatory Commission in October, 1985.
Subsequent to this aporoval, several individuals and orga-nizations requested a hearing. On February 20, 1986, the Com-mission instituted an informal proceeding upon these requests.
Commission Order (February 20, 1986).
The Commission stated that the petitions to intervene must set forth with particularity (1) the interest of that person in the proceeding; (2) how that interest may be affected by the results of the proceeding, including a delineation of the reasons why that person should be permitted to intervene that makes perticular reference to (a) the nature of the person's rignt under the Atomic Energy Act to be made a party, (b) the nature and extent of the person's property, financial, or other interest in the preceeding, and (c)'the possible effect of any order that may be entered in the proceeding on the person's interest and (~) the specific as-pect or aspects of the subject matter of the proceeding that the person seeks to have litigated.
Id. at 3.
The Commission further stated that the standing of petitioners to intervene will be governed by existing NRC prec-edents under 10 C.F.R.
S 2.714(d).
Id. at 4.
On March 10, 1986, the Presiding Officer issued a Memoran-dum and Order providing notice of the informal proceeding and opportunity to become a party.
51 fed. Req. 8,920 (1986).
The r
Order reiteratad the pleading requirements that were set forth in the Commission's. February 20, 1986 Order, and further pro-vided:
[P]etitioners are to describe specifically any deficiencies in the appli-cation, cite particular sections or por-tions of the application which relate to the deficiency, and state in detail the reasons why a particular section or portion of the application is deficient.
Petition-ers must also submit all data and material in their possession which supports or 11-lustrates each of the deficiencies com-plained of.
Data and material from gener-ally available publications may be cited rather than furnished.
Petitioners must also state what relief they seek with respect to each of their complaints.
A broad statement requesting denial or e
recision of the license or its amendment without stating why such extreme relief is appropriate will not satisfy the require-l ment to state the relief sought.
Id (emphasis in original).
II.
Lecal Standards for Intervention The Commission's and Presiding Officer's Orders require i
that a petitioner " set forth with particularity" its interest 4
and how that interest may be affected.
Those orders also pro-vide that the standing of petitioners to intervene will be gov-erned by existing NRC precedent under 10 C.F.R.
5 2.714(d).
contemporary concepts of judicial Under NRC precedentf standing are to be used in allowing or disallowing interven-i tion.
Portland General Electric Co. (Pebble Springs Nuclear _
Plant, Units 1 & 2), CLI-76-27, 4 N.R.C.
610, 613-14 (1976).
The standing test is bifurcated.
A petitioner must allege (1) " injury in fact" -- some injury that has resulted or will probably result -- and (2) an interest "arquably within the zone of interest protected by the statute."
Id. at 613, citina Sierra Club v. Morton, 405 U.S. 727 (1972); Warth v. Seldin, 422 U.S.
490 (1975).
Nevertheless, it is generally assumed that an individual has the requisite interest if he resides in close proximity to the plant.
Virginia Electric and Power Co.
(North Anna Power Station, Units 1 and 2), ALAB-522, 9 N.R.C.
54, 56 (1979).
In cases involving applications for a permit to construct or a license to operate a commercial nuclear reactor, residence within 50 miles of the site is generally sufficient to estab-lish standing.
Tennessee Valley Authority (Watts Bar Nuclear Plant, Units 1 and 2), ALAB-413, 5 N.R.C. 1418, 1421 n.4 (1977); Thiladelchia Electric Co,.
(Limerick Generating Station, Units 1 & 2), LBP-82-43A, 15 N.R.C.
1423, 1433 (1982).
How-ever, while nearby residence will also establish standing to intervene in a materials licensing proceeding,1/ closer proxim-ity should be required in those types of cases than in reactor licensing proceedings.
In Boston Edison Co. (Pilgrim Nuclear Power Station), LBP-85-24, 22 N.R.C.
97, 99 (1985), aff'd on l'/
Armed Forces Radiobiology Research Institute (Cobalt-60 Storage Facility), ALAB-682, 16 N.R.C.
150, 154 (1982) (resi-dance within three miles of facility sufficient).
other grounds, ALAB-816, 22 N.R.C.
461 (1985), the Licensing Board held that residence 43 miles from a plant was insuffi-cient to establish standing in a proceeding addressing spent fuel storage.
The application of a stricter rule to a materi-als licensing proceeding was also advanced by former Comm!.s-sioner Ahearne:
[T]here is some difficulty using the con-cept of " geographical proximity."
For power reactors, geographical proximity (living within about 50 or 60 miles is suf-ficient to establish standing because we infer a health and safety interest from that proximity.
Clearly a reactor poses a threat for a broader geographic area than most activi-ties licensed under a materials license.
Whereas living 50 or 60 miles may be suffi-cient to establish standing for a reactor.
I could not expect it to be sufficient for most materials licenses.
Rockwell International (Energy Systems Group Special Nuclear Materials License No. SNM-21), CLI-83-15, 17 N.R.C.
1001, 1005 (1983) (additional views of Commissioner Ahearne).
In a formal NRC proceeding, a petitioner must also plead at least one admissible contention in order to be granted party status.
10 C.F.R.
5 2.714.
The requirement in this informal proceeding that a petitioner must identify and support issues with particularity dictates the imposition of an analogous requirement here.
Where a petitioner has failed to identify with specificity a cognizable issue and to support that issue with citation, discussion, data, and documents or references, the petitioner should be denied party status..
III.
Mr. Zatroch's Request Should Be Denied Mr. Zatroch has not demonstrated his standing to intervene in this proceeding.
He has not alleged any injury.
He states that he resides ir. Shef field Lake.
Sheffield Lake, however, is approximately fifty-three miles from the Davis-Besse site.
Residence this far away is insufficient to establish standing per se.
When a petitioner fails to demonstrate standing as of 4
right, a presiding officer may still allow intervention as a matter of discretion.
Portland General Electric Co. (Pebble Springs Nuclear Plant, Units 1 and 2), CLI-76-27, 4 N.R.C.
- 610, a
614-17 (1976).
A petitioner, as the proponent of an order per-mitting discretionary intervention,.has the burden of persua-sion.
In the case at hand, Mr. Zatroch has made no such affir-mative showing.
Mr. Zatroch has also failed to identify a single issue.
He has therefore not complied with the Presiding Officer's in-structions in the March 10, 1986 Memorandum and Order, which required petitioners to specify deficiencies in Licensee's ap-plication, to provide citation and discussion, and to provide supporting data, materials, or references.
r.
i IV.
Conclusion For the reasons stated above, Mr. Zatroch's request to in-tervene should be denied.
Licensee has no objection to Mr.
Eatroch's letter being treated as a limited appearance state-ment.
Respectfully submitted, 1C>'
Jay E.
- Silberg, P.C.
David R. Lewis SHAW, PITTMAN, POTTS & TROWBRIDGE Counsel for The Toledo Edison Company et al.
Dated: April 23, 1986
i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Administrative Judge In the Matter of
)
)
Docket No. 50-346-ML TOLEDO EDISON COMPANY, ET AL.
)
)
(Davis-Besse Nuclear Power
)
Station, Unit No. 1)
)
CERTIFICATE OF SERVICE I hereby certify that a true copy of the foregoing LICENSEE'S RESPONSE OPPOSING THE PETITION OF GEORGE ZATROCH FOR LEAVE TO INTERVENE was mailed, first class mail, postage pre-paid, to the attached service list, this 03nd day of April, 1986.
lV f
_ K II. Silberg SHAW, PITTMAN, POTTS & TROWBRIDGE 1800 M Street, N. W.
Washington, D. C. 20036 (202) 822-1474
i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Administrative Judge In the Matter of
)
)
Docket No. 50-346-ML TOLEDO EDISON COMPANY, ET AL.
)
)
(Davis-Besse Nuclear Power
)
Station, Unit No. 1)
)
SEPVICE LIST Helen F. Hoyt, Esquire Charles A.
Barth, Esquire Administrative Judge Office of the Executive Legal t
Atomic Safety and Licensing Board Director U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Washington, D. C.
20555 Docketing & Service Section George Zatroch Office of the Secretary 3595 East Erie Avenue U. S. Nuclear Regulatory Commission Sheffield Lake, Ohio 44054 Washington, D. C.
20555 1
i
-