| | Start date | Site | Title | Topic |
|---|
| ENS 58216 | 25 March 2026 19:30:00 | Cf Industries | Lost Source | Moisture Density Gauge |
| ML26057A158 | 5 March 2026 | | Technical Basis for Continued Applicability of GSI 187 Conclusions for Continued Use of TID 14844 to Demonstrate Compliance with 10 CFR 50.49 with Updated Accident Source Terms Endorsed in Later Versions of Regulatory Guide 1.183 | Probabilistic Risk Assessment Generic Issues Program Backfit Power Uprate |
| L-2026-032, Annual Radioactive Effluent Release Report (ARERR) for 2025 | 26 February 2026 | Turkey Point | Annual Radioactive Effluent Release Report (ARERR) for 2025 | Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
| ML26051A050 | 26 February 2026 | 07109341 | Enclosure 2 - CoC 9341 Rev 12 | Exclusive Use |
| ML26030A200 | 25 February 2026 | 07109337 | Safkeg-LS Model No. 3979A, CoC No. 9337, Revision 6, CoC | |
| 3F0226-02, Response to License Termination Plan Request for Supplemental Information | 25 February 2026 | Crystal River | Response to License Termination Plan Request for Supplemental Information | Environmental Justice Spill |
| ML26057A114 | 20 February 2026 | BWX Technologies | BWXT Nuclear Operations Group, Inc., Semi-Annual Effluent Monitoring Report | |
| ML26033A017 | 13 February 2026 | Fort Calhoun | Safety Evaluation Report to Approve Revision 2 of the Fort Calhoun License Termination Plan | |
| IR 05000220/2025004 | 12 February 2026 | Nine Mile Point | Integrated Inspection Report 05000220/2025004 and 05000410/2025004 and Independent Spent Fuel Storage Installation Inspection Report 07201036/2024001 and Exercise of Enforcement Discretion | Enforcement Discretion Functionality Assessment FLEX Significance Determination Process Notice of Violation Operability Determination Containment high range radiation monitor Fuel cladding Through-Wall Leak Fire Protection Program High Residence Time Continuous basket shim |
| ML26029A125 | 3 February 2026 | Salem | Regulatory Audit Plan in Support of License Amendment Request Regarding Cobalt-60 Production (EPID L-2025-LLA-0112)(Public Version) | Anticipated operational occurrence FLEX Integrated leak rate test |
| ML26033A033 | 2 February 2026 | Fort Calhoun | FCS Response to Audit Request Q-6 | |
| ML26030A059 | 30 January 2026 | Oyster Creek | OCNGS LTP LAR Audit Question Responses 9-8-2025 | Spill |
| ML26030A060 | 30 January 2026 | Oyster Creek | OCNGS LTP Additional Audit Question 10-6-2025 | Spill |
| ML26021A159 | 30 January 2026 | Crystal River | License Termination Plan Request for Supplemental Information | Pre-submittal Spill |
| ML26036A008 | 27 January 2026 | Crystal River | LTP Supplemental Information Request Clarification Call | Spill |
| RS-26-003, Response to Request for Additional Information Related to Request for Exemption from 10 CFR 50-82(a)(8) | 20 January 2026 | Dresden | Response to Request for Additional Information Related to Request for Exemption from 10 CFR 50-82(a)(8) | Exemption Request |
| CNL-25-048, Application to Revise Technical Specification 5.5.3 Radioactive Effluent Controls Program to Support Revision of the Offsite Dose Calculation Manual That Accounts for Radionuclides Generated When Using Potassium Hydroxide | 15 January 2026 | Sequoyah | Application to Revise Technical Specification 5.5.3 Radioactive Effluent Controls Program to Support Revision of the Offsite Dose Calculation Manual That Accounts for Radionuclides Generated When Using Potassium Hydroxide | Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report License Renewal |
| ML25363A185 | 14 January 2026 | 07003103 | Enclosure 2 - LES Amendment 112 - LAR 25-02 June 2025 ISA Methodology (Public) | Decommissioning Funding Plan Exemption Request Commercial Grade Depleted uranium Basic Component |
| IR 05000070/2025002 | 30 December 2025 | Vallecitos Nuclear Center 07000754 Vallecitos | Northstar Vallecitos, LLC, NRC Inspection Report 05000070/2025002, 05000073/2025002, 05000183/2025002 and 07000754/2025002 | High Radiation Area Fire Barrier Fire Protection Program |
| L-2025-190, Corrected Amendment 33 to the Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | 29 December 2025 | Saint Lucie | Corrected Amendment 33 to the Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Boric Acid Loop seal High Radiation Area Grab sample Anticipated operational occurrence Coatings Fuel cladding Power Uprate Overexposure Spent fuel rack Spill |
| ML26014A182 | 22 December 2025 | 07000113 | Enclosure 5 - Decommissioning Cost Estimate for License SNM-95 (Redacted) | License Renewal |
| ML25231A255 | 22 December 2025 | 07201042 | 2. Proposed Technical Specification for CoC No. 1042, Amd 5 Rev 0 | Time of Discovery Tornado Missile Commercial Grade Dedication Safe Shutdown Earthquake Nondestructive Examination Finite Element Analysis Stress corrosion cracking Fuel cladding Liquid penetrant Basic Component Seal weld Restart |
| ML25241A169 | 18 December 2025 | Crystal River | Partial Site Release SER | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Sewage Treatment Plant Annual Radiological Environmental Operating Report Process Control Program Spill |
| ML25351A093 | 15 December 2025 | NS Savannah | Us Dept of Transportation, Maritime Admin., Final Status Survey Report 1 of 5, Revision 1 | |
| ML25352A127 | 15 December 2025 | Salem | NRC Acceptance Review Results for Salem LAR S25-01 | |
| ML25345A144 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-096, Rev. 0, Bfm Dcglep Values Assuming the Residential Scenario with Drinking Water | |
| ML25345A137 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-111, Rev. 0, Surface/Sub Surface Characterization Survey Plan | Spill |
| ML25345A117 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-012, Rev. 0, Basement Fill Model: Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways | |
| ML25345A111 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-015, Rev. 0, Building Surface Dcgl Values | |
| ML25345A124 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-015, Rev. 1, Basement Fill Model: Calculation of Embedded Pipe Dcgl Values | |
| ML25345A132 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-062, Rev. 1, Method for Determining Nuclide Fractions and Gross Activity Dcgls | |
| ML25345A116 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-009, Rev. 0, Area Factors for Soil - Industrial Use Scenario | |
| ML25345A113 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-006, Rev. 1, Area Factors for Use with Oyster Creek Dcgl Values for Buildings/Structures | |
| ML25345A150 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-103, Rev. 0, Industrial Use Scenario with Open Drinking Water Pathway: an Assessment of Impact on Dcgl Values for Surface Soil | |
| ML25345A131 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-060, Rev. 1, in Situ Object Counting System (Isocs) as Applied to Final Status Survey at Oyster Creek Nuclear Generating Station (OCNGS) | Spill |
| ML25345A141 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-091, Rev. 0, Bfm Dcgl W/F Values Assuming the Residential Scenario Without Drinking Water | |
| ML25345A139 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-089, Rev. 0, Soil Dcgl Values Assuming the Residential Scenario Without Drinking Water | |
| ML25345A143 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-093, Rev. 0, Bfm Dcglep Values Assuming the Residential Scenario Without Drinking Water | |
| ML25345A112 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-004, Rev. 0, Resrad Building Surface Dcgl Values | |
| ML25345A130 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-063, Rev. 0, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways | |
| ML25345A133 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-081, Rev. 2, Groundwater Dose Calculation Methodology to Support the License Termination Plan | |
| ML25345A125 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-016, Rev. 0, Calculation of Buried Pipe Dcgl Values | |
| ML25345A129 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-055, Rev. 0, Basement Fill Model: Probabilistic Analyses for the Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways | |
| ML25345A149 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-102, Rev. 0, Dcglbp Values Assuming the Residential Scenario with Drinking Water | |
| ML25345A136 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-103 Rev. 0, Distribution Coefficient (Kd) of Radionuclides in Soil Samples | |
| ML25345A127 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-108, Rev. 1, Instrument Efficiency Determination for Use in Min. Detectable Concentration Calculations for Final Status Surveys at OCNGS | Coatings |
| ML25345A118 | 11 December 2025 | Oyster Creek | Calculation ENG-OCS-013, Rev. 1, Basement Fill Model: Calculation of Dcgl W/F Values Assuming Industrial Use of Scenario Exposure Pathways | |
| ML25345A138 | 11 December 2025 | Oyster Creek | Technical Support Document No. 24-085, Rev. 0, Probabilistic Dose Comparisons: Building Occupancy Scenario Vs. Room Renovation Scenario | |
| ML25345A142 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-092, Rev. 0, Bfm Dcgl W/F Values Assuming the Residential Scenario with a Drinking Water Pathway | |
| ML25345A145 | 11 December 2025 | Oyster Creek | Technical Support Document No. 25-101, Rev. 0, Dcglbp Values Assuming the Residential Scenario Without Drinking Water | |