. . - . . - . . _ . . . . . - ..

s i

i ENCLOSURE 1 NOTICE OF VIOLATION l

i i

. Duke Power Company Docket Nos. 50-369 and 50-370 j McGuire Nuclear Station License Nos. NPF-9 and NPF-17 i

During the Nuclear Regulatory Commission (NRC) inspection conducted on March 1 through April 20, 1986, violations of NRC requirements were identified. In

accordance with the " General Statement of Policy and Procedure for NRC Enforce-i ment Actions," 10 CFR Part 2, Appendix C (1985), the violations are listed below:

A. Technical Specifications 4.11.1.2, 4.11.2.2, 4.11.2.3 and 4.11.4.1 require that the cumulative dose contributions from liquid and gaseous effluents for the current calendar quarter and year be determined at least once per 31 days.

. Contrary to the above, the contributions from liquid and gaseous effluents for the current calendar quarter or year were not calculated within the 31 day span preceding January 29, 1986.

This is a Severity Level IV Violation (Supplement I), applicable to both units.

B. Technical Specification 6.8.1.a requires that current written approved procedures, be established implemented and maintained covering reactor startup and safety related equipment operation.

1. The Reactivity Balance Calculation procedure (OP-0-A-6100-06),
requires in step 2.6 that if the rods are withdrawn to the upper limit j of the ECP band and criticality has not yet been reached, all control banks must be reinserted and a recheck of the calculations performed.
2. Operations Management Procedure 2.5, section 6.6 requires that the operator ensure redundant equipment is operable prior to removing equipment from. service.

Contrary to the above:

1. On March 11, 1986, McGuire Unit I was being taken critical when the control rods were withdrawn to the withdrawal limit specified in the
reactivity balance procedure and the control rods were not inserted as required.
2. On March 12, 1986 train 'B' of containment spray and train 'A' of SSPS (solid state protection system) were removed from service simulta- '

neously. Thus, both trains of containment spray were removed from service simultaneously.

i 8607180377 860702 A

PDR ADOCK 0D000369 G PDR

Duke Power Company 2 Docket Nos. 50-369 and 50-370 McGuire Nuclear Station License Nos. NPF-9 and NPF-17 )

l

) Items 1. and 2. above, singularly and collectively constitute a Violation for failure to follow procedures.

I This is a Severity Level IV Violation (Supplement I), applicable to Unit 1.

Pursuant to the provisions of 10 CFR 2.201, Duke Power Company is hereby required to submit to this Office within 30 days of the date of the letter transmitting 4 this Notice a written statement or explanation in reply including for each

violation
(1) admission or denial of the violation, (2) the reason for the
violation if admitted, (3) the corrective steps which have been taken and the

{ results achieved, (4) the corrective steps which will be taken to avoid further

violations, and (5) the date when full compliance will be achieved. Where good ,

j cause is shown, consideration will be given to extending the response time. '

j i FOR THE NUCLEAR REGULATORY COMMISSION 1 s .

D' W M h l

& .A . rQ Luis A. Reyes, Acting Director j Division of Reactor Projects 1

Dated at Atlanta, Georgia j this 1 day of July 1986 i

l i

l I

l 1

i i

r b._ . _ _ _ _ , . - _ _ . _ . _ . - . , _ _ - _ . _ . _ _ .__ _ , . . _ . _ , _ _ _ _ . _ . _ . , _ , . , . _ _ . , , , _ - . _ .