05000336/LER-1997-024, Forwards LER 97-024-01,documenting Condition Discovered at Mnps,Unit 2 on 970619.Suppl Provides Update on Analyses & Investigation of Condition.Commitments Made by Util,Encl

From kanterella
(Redirected from ML20199G344)
Jump to navigation Jump to search
Forwards LER 97-024-01,documenting Condition Discovered at Mnps,Unit 2 on 970619.Suppl Provides Update on Analyses & Investigation of Condition.Commitments Made by Util,Encl
ML20199G344
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/14/1999
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199G345 List:
References
B17518, NUDOCS 9901220265
Download: ML20199G344 (4)


LER-2097-024, Forwards LER 97-024-01,documenting Condition Discovered at Mnps,Unit 2 on 970619.Suppl Provides Update on Analyses & Investigation of Condition.Commitments Made by Util,Encl
Event date:
Report date:
3362097024R00 - NRC Website

text

_ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6 NohI R Pc Ferry Rd. (Route 156), T terford, CT 06385

. Nuclear Energy wai.cooe N,3 ear Po.er siatio.

Northeast Nuclear Eoergy Compaoy P.O. Box 128 Waterford, CT 06385-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilines System JAN I 41999 Docket No. 50-336 B17518 Re: 10 CFR 50.73(a)(2)(i)

U.S. Nuclear Regulatory Commission Document Control Desk '

Washington, DC 20555 Millstone Nuclear Power Station Unit No. 2 Licensee Event Report 97-024-01 l Violation of Technical Specification 4.0.5,  ;

ASME Section XI Surveillance Reauirements '

This letter forwards Licensee Event Report (LER) 97-024-01, documenting a l condition that was discovered at Millstone Nuclear Power Station, Unit No. 2, on  !

June 19,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i).

This LER supplement provides an update on the analyses and investigation of this condition.

The Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter are included in Attachment 1.

Very traly yours, NORTHEAST NUCLEAR ENERGY COMPANY

'y.~!,O b J. A. %rice Direc A' r - Millstone Unit No. 2

\

l cc: see page 2

@[I \

9901220265 990114 PDR ADOCK 05000336 S PDR 0%3422-5 REY.12 95

U.S. Nuclear Regul tory Commission

. B17518\Page 2 Attachments: 1. List of Regulatory Commitments

2. LER 97-024 01 cc: H. J. Miller, Region 1 Administrator S. Dembok, NRC Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 E. V. Imbro, Director, Millstone ICAVP inspections

{

~. . . . -.-. - .- . ... . , _ - - - - . . . _ . . - . - - - - . . . . - . - . _ - . - . . . . . . _ . .

I i

i F Docket No. 50-336 l B17518  :

t i l l

1 l

p I

I g

Attachment 1 l Millstone Nuclear Power Station, Unit No. 2 l Commitments .

! 6 i

i 1 ,

l I

l l t

. 1 l

! i i

l t

January 1999 P

4 4

.a l

n


e

9 U.S. Nucl:ar Regul tory Commitsion

. B17518\ Attachment 1\Page 1 Attachment 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17518.01: The appropriate procedure was Complete revised to require development of repair / replacement plans for snubber replacements.

B17518.02: The identified Hydrogen Monitoring Mode 4 from current System valves and piping will be added to the outage IST/ISI programs and will be tested and maintained in accordance with the applicable ASME Section XI and 10CFR50 Appendix J requirements.

1

)

. . . ..m_ _ . . ._. . . . _ .... _ __.~ _ . ._ _ _ _ ._ _. _. _ -. .. . __ . ..._ . ._ _ _._. _ _ .

I J

.. .. j o

Docket No. 50-336 B17518 1

~

l 1

I i

i I

l r

t i

t t

Attachment 2 )r i

Millstone Nuclear Power Station, Unit No. 2 i LER 97-024-01  !

l4 i 1  !

A t

I r i

l i f

f~ k

)

)

l i

i

{'  !

4 t i

i r

i January 1999  !

t i 1 1- S I

.e . -

... t 9