05000245/LER-1997-038, Forwards LER 97-038-00,documenting Event That Occurred at Plant,Unit 1 on 971008,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr Submitted

From kanterella
(Redirected from ML20198R697)
Jump to navigation Jump to search
Forwards LER 97-038-00,documenting Event That Occurred at Plant,Unit 1 on 971008,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr Submitted
ML20198R697
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/05/1997
From: George Gellrich
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198R701 List:
References
B16825, NUDOCS 9711130363
Download: ML20198R697 (2)


LER-2097-038, Forwards LER 97-038-00,documenting Event That Occurred at Plant,Unit 1 on 971008,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr Submitted
Event date:
Report date:
2452097038R00 - NRC Website

text

,

- . Nhg Rape Ferry Rd. (Route 156), Waterfor.1, Cr 06385 Nuclear Energy m o,,,3 3 ,,po ,,,si,so ,

Northeast Nuclear Energy Company

  • " P.o. Box 128 Taterford, Cr 06385-0128 (860) 447-1791 Fax (860) 444 4277 The Northeast Utihties System NOV - 51997 p_qc.ket No 50-245 3.

B16825 Re: 10CFR50.73(a)(2)(ii)

U.S. Nuclear Regulatory Commission

} *

- Attention: Document Control Desk

.- Wainington, DC 20555 This letter forwards Licensee Event Report (LER) 97-038-00, documenting an event that l y' , occurred at Millstone Unit No.1 on October 8,1997. This LER is st.bmitted puisuant to

,-' 10CFR50.73(a)(2)(ii).

~5 The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only.

B16825-1 NNECO commits to review existing analysis and Systemetic Evaluation Program topical reports related to the Reactor Building roof for Safe 1 Shutdown Earthquake (SSE)irputs prior to fuel handling.

B16825-2 NNECO commits to evaluate the need and, if necessary, perform a re-analysis of the Reactor Building roof structure prior to fuel handling B16825-3 NNECO commits to develop and implement a plan to restore the Reactor Building roof structure to meet the requirements of the SSE analysis including modifications as required prior to fuel handling.

B16S25-4 NNECO commits to perform a detailed review of the Reactor Building structure to assess the adequacy for SSE inputs prior to startup from this refueling outage. i 9

/ f 9711130363 971105 PDR ADOCK 05000245 S PDR kk,k ,

Ot04:s2 8 Rf.Y.12-95

I U.S. Nuclear Regulatory Commission -

I B16825\Page 2 of 2 Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY For: P D. Hinnenkamp Director, Unit Operations d

By: Gii. Gellrich Director, Engine #ig

Attachment:

LER 97-038-00 cc: 11. J. Miller, Region 1 Administrator T. A. Eastick, Senior Resident Inspector, Millstone Unit No.1 S. Dembek. NRC Project Manager Millstone Unit No.1

[

- - - - - - - - - - - - - - - - - - - -