MONTHYEARML20217N7591999-10-18018 October 1999 Provides Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 ML20217M3861999-10-15015 October 1999 Provides Addl Changes to SAR Update Certificate Amend Request,Containing Changes That Resulted from re-evaluation of Autoclave head-to-shell O-ring Leakage Analysis Provided by DOE SAR Repts ML20217G1811999-10-14014 October 1999 Forwards Reissued Amend to Coc for Usec Paducah Gdp.Coc Corrects Coc Issued on 991006.Amend Number & Effective Date Were Inadvertently Incorporated as 3 & 991026,instead of 4 & 991105 ML20217G1731999-10-14014 October 1999 Requests Addl Info Re Applications Dtd 990924,requesting Amends to Cocs for Paducah & Portsmouth GDPs for Revised QA Programs.Encl Identifies Specific Info Needed.Info Should Be Provided within 30 Days ML20217F6801999-10-12012 October 1999 Forwards Updated Paducah GDP Certificate Amend Requests at NRC for Approval ML20217B2801999-10-0606 October 1999 Forwards Insp Rept 70-7001/99-203 on 990921-23.No Violations Noted ML20217B3521999-10-0606 October 1999 Forwards Amend 3 to Certificate of Compliance GDP-1 to Revise Six Technical Safety Requirements Sections.Sections Are 2.1.4.17,2.1.4.8,2.3.4.1,2.3.4.4,2.3.4.16 & 3.10.4.b. Compliance Evaluation Rept Also Encl ML20212K8941999-10-0404 October 1999 Forwards Insp Rept 70-7001/99-10 on 990720-0907 & Forwards NOV Indicating That Some Personnel Were Incorrectly Granted Unescorted Access to Controlled Access Areas Without Having Necessary Specific Training ML20216J8931999-10-0101 October 1999 Forwards Copy of Security Incident Log & Associated Info for Sept 1999 ML20216J9081999-09-30030 September 1999 Forwards Revised Written Event Rept 99-10,rev 3,pertaining to Corroded Fire Sprinkler Heads Affecting Operability of high-pressure Fire Water (HPFW) Sprinkler Sys.No Commitment Contained in Rept ML20217M3701999-09-29029 September 1999 Submits bi-monthly Update on Progress of Mods to Upgrade Audibility of Criticality Accident Alarm Sys (Caas).Schedule for CAAS Audibility Upgrades Attached ML20212H1251999-09-24024 September 1999 Notifies NRC of Change in Regulatory Commitments Associated with Submittal Date for Update of Application SAR Chapter 3.Specifics of Commitment Changes of Listed ML20212H3801999-09-24024 September 1999 Responds to 990723 RAI Re 1999 Annual Update to Certification Applications ML20212F0981999-09-22022 September 1999 Forwards Insp Rept 70-7001/99-12 on 990830-0902.Purpose of Insp Was to Determine If Security Requirements Adequately Implemented & Included Review of Approved Plant Security Plan.No Violations Identified ML20212H3721999-09-22022 September 1999 Forwards NRC Form 790 Classification Record Documents for Paducah & Portsmouth GDPs That Were Generated During Month of Aug 1999.Without Encl ML20217J1211999-09-20020 September 1999 Submits Listed Comments on NRC Proposed Rule, Reporting Requirements for Nuclear Power Reactors ML20212D4291999-09-17017 September 1999 Forwards Required 30-day Written Event Rept Re Criticality Accident Alarm Sys Response Time in Bldg C-710.Encl 2 Contains Commitments Contained in Submittal ML20212D4231999-09-16016 September 1999 Informs That Review of Event Rept Er 99-12 Revealed Listed Two Statements Inadvertently Omitted from Document ML20212B6611999-09-15015 September 1999 Forwards Insp Rept 70-7001/99-202 on 990816-20.No Violations Noted ML20212D2361999-09-15015 September 1999 Submits Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 ML20212A5441999-09-14014 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7001/99-07 ML20212A5531999-09-14014 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7001/99-08 ML20211Q9951999-09-10010 September 1999 Forwards 30-day Written Rept ER-99-12,re Loss of Power to Autoclave Position 1 North & 1 South Process Gas Leak Detection (Pgld) in Bldg C-333-A.Caused by Electrical Short Circuit.Submitted Work Request 501636 for PI SEX-4 ML20216E4891999-09-0909 September 1999 Responds to Violations Noted in Insp Rept 70-7001/99-08. Corrective Actions:On 990602 Responsible Organization Manager Met with FP Engineer Performing Bldg Reappraisal & Made Clear Expectation for Prompt Reporting of Deficiencies ML20211P2091999-09-0909 September 1999 Provides Staff Written Clarification of NRC Reporting Expectations of When Double Contingency Losses Should Be Reported to NRC IAW Bulletin 91-001, Reporting Loss of Criticality Safety Controls, & Suppl ML20211P3831999-09-0303 September 1999 Forwards Coc GDP-1,amend 3 & Coc GDP-2,amend 4 for Paducah (Pgdp) & Portsmouth (Ports) Gdps,Respectively by Revising Pgdp & Ports QAPs in Vol 3 of Respective Certificate Applications ML20211L6441999-09-0202 September 1999 Forwards Insp Rept 70-7001/99-11 on 990802-06.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20211M3551999-09-0101 September 1999 Forwards Copy of Security Incident Log & Associated Info for Month of Aug 1999,IAW 10CFR95.57(b) ML20211K4041999-08-31031 August 1999 Forwards Responses to Remaining NRC Questions/Comments from 980601 & 0709 NRC RAIs Re SAR Update ML20211M7031999-08-30030 August 1999 Forwards Proprietary Rev 0 to Arming & Arrest Authority Security Plan for Paducah & Portsmouth Gaseous Diffusion Plants, for Review & Approval.Encl Withheld ML20211G9971999-08-26026 August 1999 Forwards Rev 2 to Written Rept Er 99-10,re Corroded Fire Sprinkler Sys in Bldg C-337 & C-333.Analysis of Root Cause Has Not Been Completed.Statistically Based Sprinkler head- Sampling Plan Has Been Completed & Approved ML20211B5021999-08-20020 August 1999 Forwards Amend 2 to Certificate of Compliances GDP-1, Revising Paducah GDP Technical Safety Requirements Re Audibility Requirements for Criticality Accident Alarm Sys at Facility & Related Sections of SAR ML20211F1761999-08-20020 August 1999 Requests That Paducah GDP facility,C-709 Lab Annex Bldg Be Added to List of Facilities to Be Exempted from CAAS Detection Coverage ML20211D9751999-08-20020 August 1999 Forwards Rev 1 to Final Written Event Rept Er 99-11,re Unplanned Actuation of C-333-A Autoclave 1 North Autoclave Steam Pressure Control Sys (Aspcs) on 990623 ML20211A7011999-08-17017 August 1999 Forwards Copy of Final Amend to 10CFR76 for Info of Subcommittee.Final Rule Is Being Transmitted to Fr for Publication.Final Rule Will Amend Regulations That Apply to Paducah & Portsmouth Gaseous Diffusion Plants ML20211D5811999-08-16016 August 1999 Submits Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 ML20210P7421999-08-10010 August 1999 Forwards Insp Rept 70-7001/99-08 on 990529-0719 & Nov. Violations of Concern Because Late Reporting of Problems with safety-related Equipment Could Negatively Impact Continued Availability of Equipment ML20210Q6061999-08-0909 August 1999 Forwards NRC Form 790 Classification Record Documents for Paducah & Portsmouth Gdps,Per 10CFR95.57.Records Were Generated During Month of July 1999.Without Encl ML20210L6571999-08-0404 August 1999 Informs That Staff Completed Initial Review of 990720 Application to Amend Coc GDP-1.Staff Anticipates Completing Review by 990930 ML20211A7901999-08-0404 August 1999 Forwards Info Requested During Briefing by NRC Staff on 990726 Re NRC Interactions with Usec ML20210H3161999-07-30030 July 1999 Forwards Rev 1 to Written Event Rept ER-99-10,re Corroded Fire Sprinkler Heads Affecting Operability of HP Fire Water Sprinkler Sys in Bldg C-337 & C-333.Testing & Analysis of Root Cause & Corrective Actions Necessary Are Not Complete ML20210J1331999-07-30030 July 1999 Forwards Copy of Security Incident Log & Associated Info for Month of July 1999,per Reporting Requirements of 10CFR95.57(b) ML20210H2181999-07-29029 July 1999 Responds to Violations Noted in Insp Rept 70-7001/99-07. Corrective Actions:Smoke Watch Was Established Covering Area Affected by Process Gas Leak Detection Inoperabilty & Individuals Involved Were Counseled for Personnel Errors ML20210P7871999-07-29029 July 1999 Provides bi-monthly Update on Progress of Modifications to Upgrade Audibility of Criticality Accident Alarm Sys,In Response to NRC 981217 Request ML20210F9761999-07-28028 July 1999 Forwards Compliance Evaluation Rept Prepared to Support Amend of Coc GDP-1 Re Criticality Accident Alarm Sys Audibility.Notice of Amend Forwarded to Ofc of Fr Also Encl ML20210J7921999-07-27027 July 1999 Forwards Proprietary NRC Form 327, Special Nuclear Matl (SNM) & Source Matl (SM) Physical Inventory Summary Rept, for Paducah & Portsmouth Gdps.Rept Covers Period Ending 990528.Proprietary Info Withheld,Per 10CFR2.790(d) ML20210G0391999-07-26026 July 1999 Forwards Compliance Evaluation Rept & Fr Notice for Revised Qaps,Per 990212 Application ML20210H6001999-07-26026 July 1999 Forwards NRC Form 790 Classification Record Documents for Paducah & Portsmouth Gaseous Diffusion Plants That Were Generated During Month of June 1999.Without Encl ML20210D8181999-07-23023 July 1999 Submits Response to SA Toelle Ltr Dtd 990614, 10CFR76.68(a)(3) Decreased Effectiveness Reviews & RAI for Paducah & Portsmouth Transmittals of 1999 Annual Update to Certification Applications ML20210E4291999-07-23023 July 1999 Forwards Required 30-day Written Event Rept Re Unplanned Actuation of C-333-A Autoclave 1 North Autoclave Steam Pressure Control Sys (Aspcs) on 990623.Investigation Ongoing for Root Cause 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G1731999-10-14014 October 1999 Requests Addl Info Re Applications Dtd 990924,requesting Amends to Cocs for Paducah & Portsmouth GDPs for Revised QA Programs.Encl Identifies Specific Info Needed.Info Should Be Provided within 30 Days ML20217G1811999-10-14014 October 1999 Forwards Reissued Amend to Coc for Usec Paducah Gdp.Coc Corrects Coc Issued on 991006.Amend Number & Effective Date Were Inadvertently Incorporated as 3 & 991026,instead of 4 & 991105 ML20217B2801999-10-0606 October 1999 Forwards Insp Rept 70-7001/99-203 on 990921-23.No Violations Noted ML20217B3521999-10-0606 October 1999 Forwards Amend 3 to Certificate of Compliance GDP-1 to Revise Six Technical Safety Requirements Sections.Sections Are 2.1.4.17,2.1.4.8,2.3.4.1,2.3.4.4,2.3.4.16 & 3.10.4.b. Compliance Evaluation Rept Also Encl ML20212K8941999-10-0404 October 1999 Forwards Insp Rept 70-7001/99-10 on 990720-0907 & Forwards NOV Indicating That Some Personnel Were Incorrectly Granted Unescorted Access to Controlled Access Areas Without Having Necessary Specific Training ML20212F0981999-09-22022 September 1999 Forwards Insp Rept 70-7001/99-12 on 990830-0902.Purpose of Insp Was to Determine If Security Requirements Adequately Implemented & Included Review of Approved Plant Security Plan.No Violations Identified ML20212B6611999-09-15015 September 1999 Forwards Insp Rept 70-7001/99-202 on 990816-20.No Violations Noted ML20212A5441999-09-14014 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7001/99-07 ML20212A5531999-09-14014 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7001/99-08 ML20211P2091999-09-0909 September 1999 Provides Staff Written Clarification of NRC Reporting Expectations of When Double Contingency Losses Should Be Reported to NRC IAW Bulletin 91-001, Reporting Loss of Criticality Safety Controls, & Suppl ML20211P3831999-09-0303 September 1999 Forwards Coc GDP-1,amend 3 & Coc GDP-2,amend 4 for Paducah (Pgdp) & Portsmouth (Ports) Gdps,Respectively by Revising Pgdp & Ports QAPs in Vol 3 of Respective Certificate Applications ML20211L6441999-09-0202 September 1999 Forwards Insp Rept 70-7001/99-11 on 990802-06.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20211B5021999-08-20020 August 1999 Forwards Amend 2 to Certificate of Compliances GDP-1, Revising Paducah GDP Technical Safety Requirements Re Audibility Requirements for Criticality Accident Alarm Sys at Facility & Related Sections of SAR ML20211A7011999-08-17017 August 1999 Forwards Copy of Final Amend to 10CFR76 for Info of Subcommittee.Final Rule Is Being Transmitted to Fr for Publication.Final Rule Will Amend Regulations That Apply to Paducah & Portsmouth Gaseous Diffusion Plants ML20210P7421999-08-10010 August 1999 Forwards Insp Rept 70-7001/99-08 on 990529-0719 & Nov. Violations of Concern Because Late Reporting of Problems with safety-related Equipment Could Negatively Impact Continued Availability of Equipment ML20210L6571999-08-0404 August 1999 Informs That Staff Completed Initial Review of 990720 Application to Amend Coc GDP-1.Staff Anticipates Completing Review by 990930 ML20211A7901999-08-0404 August 1999 Forwards Info Requested During Briefing by NRC Staff on 990726 Re NRC Interactions with Usec ML20210F9761999-07-28028 July 1999 Forwards Compliance Evaluation Rept Prepared to Support Amend of Coc GDP-1 Re Criticality Accident Alarm Sys Audibility.Notice of Amend Forwarded to Ofc of Fr Also Encl ML20210G0391999-07-26026 July 1999 Forwards Compliance Evaluation Rept & Fr Notice for Revised Qaps,Per 990212 Application ML20210D8181999-07-23023 July 1999 Submits Response to SA Toelle Ltr Dtd 990614, 10CFR76.68(a)(3) Decreased Effectiveness Reviews & RAI for Paducah & Portsmouth Transmittals of 1999 Annual Update to Certification Applications ML20210V3481999-07-16016 July 1999 Informs That Staff Completed Review of New Payment Surety Bonds (Psb) for Paducah & Portsmouth Gdps,Which Were Provided in .Cancelled Psbs for Liberty Mutual Insurance Co & Safeco Insurance Co of America,Encl ML20209F0611999-07-0909 July 1999 Forwards Insp Rept 70-7001/99-09 on 990621-25.No Violations Noted ML20196K0981999-07-0101 July 1999 Forwards Insp Rept 70-7001/99-07 on 990413-0528 & Nov. Violations Re Failure to Fully Evaluate Situation in Which Safety Sys Relied Upon to Mitigate Consequences of Accident Was Inappropriately Returned to Svc ML20196A1571999-06-17017 June 1999 Confirms Discussions Between K O'Brien & L Jackson to Conduct Meeting on 990630 to Discuss Apparent Violation ML20207F1311999-06-0404 June 1999 Responds to Requesting Copy of OI Rept 3-1998-033 Re Docket Potential Violation of 10CFR76.7 Concerning Employee Protection at Plant.Request Denied for Listed Reasons ML20207F2571999-06-0202 June 1999 Informs That NRC Disagrees with Usec Conclusion for Not re-opening Issue 2 of Compliance Plan,Since Proposed Change to Sarup Submittal Constitutes Major Rev to Operating Safety Bases Contained in Technical Safety Requirements ML20207E8201999-05-18018 May 1999 Refers to Investigation Case 3-1998-033 Re Apparent Violation Involving Usec & Lockheed-Martin Utility Service, Inc Mgt Discriminating Against Employee at Paducah Gaseous Diffusion Plant.Synopsis Encl.Without Encl 2 ML20206N3851999-05-12012 May 1999 Forwards Amend 1 to Coc GDP-1 & Amend 3 to Coc GDP-2 IAW 990316 Applications,Revising Paducah & Portsmouth Gaseous Diffusion Plants Technical Safety Requirement Sections 3.1.1 & 3.10.4 ML20206H5161999-05-0606 May 1999 Informs That NRC Will Not Be Able to Complete Review of Paducah Certificate Amend Request on Criticality Accident Alarm Sys Audibility Upgrade by 990507,as Indicated in NRC .Review Should Be Completed by 990630 ML20206E6481999-04-29029 April 1999 Forwards Insp Rept 70-7001/99-04 on 990224-0412.No Violations Noted ML20205R8041999-04-20020 April 1999 Forwards Partially Withheld Insp Rept 70-7001/99-201 Conducted on 990322-26.Scope & Results of Insp Summarized in Rept ML20205K4251999-04-0707 April 1999 Forwards Compliance Evaluation Rept for GDP-1 & GDP-2, Supporting Change in Title of Executive Vice President, Operations.Notice of Amend,Which Has Been Forwarded to Ofc of Fr for Publication,Encl ML20205K4481999-04-0707 April 1999 Forwards Addl Info Needed for Staff to Complete Review of 990112 Application for Amend Re Seismic Upgrades for Bldgs C-331 & C-335 at Paducah Gaseous Diffusion Plant ML20205J3021999-04-0202 April 1999 Forwards Insp Rept 70-7001/99-05 on 990322-25.No Violations Noted.Insp Included Review of Approved Paducah Physical Security Plan ML20204H9611999-03-18018 March 1999 Forwards RAI Re 990212 Applications Requesting Amends to Coc for Paducah & Portsmouth Gaseous Diffusion Plants for Revised QAPs ML20204C2721999-03-17017 March 1999 Ack Receipt of Application to Amend Coc GDP-1,re Criticality Sys Audibility Upgrades,Transmitted by Ltr . NMSS Anticipates Completing Technical Review by 990301 ML20204F2511999-03-17017 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7001/98-18.Actions Will Be Examined During Future Insp ML20207M1081999-03-11011 March 1999 Discusses Us Enrichment Corp Participation in Round Robin Sample Exchange Program Administered by Nbl for Verfying Quality of Licensee U Destructive Measurement Sys.Invoices FL0237-99 & FL0238-99 for Amount Listed Encl ML20207K3011999-03-11011 March 1999 Forwards Insp Rept 70-7001/99-01 on 990113-0223.No Violation Noted.Continuing Problems with Some Plant Staff Understanding & Adherence to long-standing Plant Policies & Procedures Were Found ML20207J7641999-03-11011 March 1999 Requests Addl Info,Specified in Encl,Re 980918 Paducah Gaseous Diffusion Plant Seismic Hazard Analysis,Rev 2,for Staff Review ML20207G2231999-03-0505 March 1999 Discusses Insp Rept 70-7001/98-18 on 981201-990112 & Forwards Notice of Violation Re Failure to Maintain Control of Classified Matter at Paducah Facility ML20207B3361999-03-0202 March 1999 Ack Receipt of 990212 Applications for Amend to Cocs GDP-1 & GDP-2.Staff Has Completed Initial Administrative Rev of Applications & No Omissions of Deficiencies Were Identified. Staff Anticipates Completing Review by 990416 ML20203G4011999-02-0909 February 1999 Forwards Insp Rept 70-7001/99-02 on 990125-29.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20202G2501999-01-29029 January 1999 Discusses 990125 Meeting with Us Enrichment Corp in Lisle,Il Re Implementation Status of C/A Plans for Nuclear Criticality Safety Program & Basis for Proposed Changes to Completion Dates for Some C/A.List of Attendees Encl ML20202F0531999-01-29029 January 1999 Forwards Renewed Cocs for Paducah & Portsmouth Gaseous Diffusion Plants Located in Paducah,Ky & Piketon,Oh. Compliance Evaluation Rept Encl Also ML20202F5731999-01-26026 January 1999 Informs That Chairman Has Sent Rept to Congress on Gaseous Diffusion Plants,As Required by Aec.Rept Discusses Status of Health,Safety & Environ Conditions at Plants Located Near Paducah,Ky & Portsmouth,Oh for Period from 971001-980930 ML20202F0461999-01-26026 January 1999 Expresses Appreciation for 981104,comments on Draft Rept to Congress.Changes Were Made to Rept to Address All of Comments Except for One.Event Notification Summary Was Not Revised to Addl Info Requested ML20202F5591999-01-26026 January 1999 Expresses Appreciation for 981104,comments on Draft Rept to Congress.Future Repts Will Be Prepared in Conjunction with Recertification Reviews ML20199H1011999-01-15015 January 1999 Forwards Second NRC Rept to Congress,Covering Period from 971001-980930.Rept Discusses Status of Health,Safety & Environ Conditions at Gaseous Diffusion Plants Near Paducah,Ky & Portsmouth,Oh ML20199G2161999-01-14014 January 1999 Forwards Amend 23 to Coc GDP-1,revising TS Requirement 2.3.4.7 on Product & Tails Withdrawal Facilities Criticality Accident Alarm Sys 1999-09-09
[Table view] |
Text
-.., - ... - . . . . . . .. . . . - - - . . - - - . _ . - . - - - . .- - ... .- .
L .
l- '.
, Octoberr14, 1998 o
Mr. J. H. Miller. '
i Vice President - Production United States Enrichment Corporation Two Democracy Center 6903 Rockledge Drive Bethesda, MD 20817
SUBJECT:
RESPONSE TO INSPECTION REPORT 70-7001/98009 Dear Mr. Miller-I This refers to your September 30,1998, supplemental response to the Notice of Violation (NOV) transmitted to you by our letter dated June 30,1998, with inspection Report 70-7001/98009. We have reviewed your corrective actions for the violation and have '
no further questions at this time. Your corrective actions will be examined during future -
inspections. ,
?
~ If you have any questions, please contact me at (630) 829-9816. .j l
l Sincerely, Original Signed by ;
Timothy D. Reidinger, Acting Chief l: Fuel Cycle Branch f Docket No. 70-7001 cc: . H. Pulley, Paducah General Manager L L. L. Jackson, Paducah Regulatory Affairs Manager l J. M. Brown, Portsmouth General Manager ,
1 S. A. Toelle, Manager, Nuclear Regulatory l Assurance and Policy, USEC -
- Paducah Resident inspector Office Portsmouth Resident inspector Office R. M. DeVault, Regulatory Oversight Manager, DOE J. C. Hodges, Paducah Site Manager, DOE DOCUMENT NAME: G:\SEC\ PAD 98009.RE2 Tm r+ceive e copy of this docuenent, Indicete in the boa:"C" = Copy without enclosure "E* = Copy with enclosure"N' = No copy i OFFICE Rill _
lC, Rlll ,l l l NAME Krsek:ib[f/ ReidingerW
- i. DATE 10/14/98 % 10/l@98'
'0FFICIAL RECORD COPY 9810190256 981014 "
.PDR ADOCM 07007001 C pm
1 o
J. Miller ' ,
bec w/itr dtd 09/30/98: Docket File PUBLIC IE-07 .
R. Pierson, NMSS P. Ting, NMSS W. Schwink, NMSS 1 P. Harich, NMSS M. L. Horn, NMSS R. Bellamy, RI EJM, Rll (e-mail)
D. B. Spitzberg, RIV/WFCO ,
Greens w/o enci y
a
~. n r } G g a \/ "'
,a .
USEC A Global Energy Company 'j September 30,1998 GDP 98-1070 i
l U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Paducah Gaseous Diffusion Plant (PGDP)
Docket No. 70-7001 Revised Response to Notice of Violation (NOV) 70-7001/98009-02 I On July 30,1998, USEC responded to the subject NOV (see USEC letter GDP 98-1059) which concerned the " testing of the Switchyard C-537 fire sprinkler system for Transformer No. 72, an i
activity which affected quality, was conducted without documented instructions, procedures, or i drawings appropriate to the circumstances." USEC's response to this NOV committed to submit a l
- revised response to this NOV by September 30,1998. USEC conducted an evaluation of the root cause and developed additional actions to those in the previous response. These additional actions i
have been incorporated into a revised response. Accordingly, the revised response to NOV 98009-02 is provided in Enclosure 1. Changes to this NOV response are indicated by margin bars.
Additionally, as committed to in USEC's response to IR 98011 (See USEC letter GDP 98-1067 dated i
September 4,1998), Enclosure 1 also envelopes the concerns that NRC expressed in IR 98011 regarding the " oversight of activities that have the potential to impact plant operations." Enclosure i 2 lists the commitments contained in this submittal. Any questions regarding this matter should be directed to Larry Jackson at (502) 441-6796.
Sincerel av Pu ey GeneralManag r-Paducah Gaseous Diffusion Plant
Enclosures:
As Stated
[- cc:: ' NRC Region III. Office ; #
NRC Resident Inspector - PGDP
[
i I
I g [/0& f l u fL5 ~ ~^
P.O. Box 1410, Paducah, KY 42001 Telephone 502 441-5803 Fax 502-441-5801 http://www.usec.com O& ices in Uvermore, CA Paducah, KY Portsmouth. OH Washington, DC OCT 05. 3
d
~
i Enclosure 1 GDP 98-1070 l
Page1of3 i
l UNITED STATES ENRICHMENT CORPORATION (USEC)
REVISED REPLY TO NOTICE OF VIOLATION (NOV) 70-7001/98009-02 [ l Resta._lement of Violation Title 10 of the Code of Federal Regulations, Part 76.93, " Quality Assurance," requires, in part, that the Corporation shall establish, implement, and maintain a Quality Assurance Program.
Section 2.5 ofthe Quality Assurance Program, " Procedures," required, in part, that activities affecting !
quality shall be prescribed by documented instructions, procedures, or drawings appropriate to the I circumstances, and shall be accomplished in accordance with these documents.
Contrary to the above, on May 14,1998, testing of the Switchyard C-537 fire sprinkler system for Transformer No. 72, an activity which affected quality, was conducted without documented instructions, procedures, or drawings appropriate to the circumstances. Specifically, the task test package did not include documented instructions or procedures, as appropriate, to ensure a minimum water flow rate, from the common water supply header to both the fire sprinkler and plant air systems, for continuous operation of the plant air compressors at a level suflicient to provide the minimum system air capacity required for operability of the criticality accident alarm system horns.
USEC Response L Background Dry compressed air is supplied from three buildings (C-600, C-620, and C-335) and an auxiliary air supply is located in Building C-607. Air compressor facilities may be operated separately or together to maintain air supply to the distribution headers. The minimum operability requirements for on-line air availability was 11,250 scfm.
Compressor trips have previously occurred during flow testing of the deluge systems in the switch yards. To mimmize the risk of a compressor trip, prior to this event, testing was initiated with the transformer deluge system's supply valve (S2) closed. This method had been used previously with no resultant compressor trips. To preclude a surge of water that could reduce the water pressure to the C-335 XLE compressors, the S2 valve was slowly opened. However, the full flow of water through the transformer deluge system resulted in a reduced flow of cooling water available to the Centac compressor in C-335 and caused the compressor to trip.
.. - _ - . .= . __ - -- _- . - .-.. -_-
g <
r d
l l
Enclosure 1 GDP 98-1070 Page 2 of 3 II. Reason for the Violation The reason for this violation was that the evaluation conducted by power operations, utility operations, and fire services prior to the testing at C-537 was inadequate in that the impact of the ambient water temperature, the closed sanitary water header, and a partially closed
! compressor cooling water valve were not accurately assessed. i A review of the events that led to this NOV and those associated with NCV 98011-01 and l l NOV 98011-02 determhied that the process for control of work and infrequent operational l evoh:tions are not adequately defined. Specifically, USEC determined that improvements are l needed in the communication of system interrelationships so that appropriate compensatory l measures and written guidance can be implemented prior to initiating work. Due to incomplete l j communication ofinformation, planners failed to recognize the interfaces between operating l 1
safety systems and non-safety systems. Additionally, compensatory requirements were not l specified, and subsequent Operation's review and approval failed to identify the impact of the l work activities.
l III. Corrective Actions Taken and Results Achieved
- 1. All flow testing ofswitchyard fire suppression systems was suspended until corrective actions are taken to prevent recurrence.
- 2. Routine testing and maintenance of fire hydrant and suppression systems that place !
flow demands on the sanitary and fire water system were stopped until the potential impacts on safety systems'can be addressed.
, 3. Current plant modifications being implementea and those modifications in the planning phase were reviewed to ensure that similar vulnerabilities did not exist for future work.
4
- 4. As committed to in the original response to this NOV, USEC has evaluated the l process for controlling work to determine what actions are necessary to ensure that l ;
i the impact ofwork directly and indirectly affecting safety related systems is accurately l assessed. Some of the actions taken as a result of this evaluation are listed below: l l
l A dedicated agenda item (Plant Status-Operations) for the Daily l l Communication & Teamwork (DC&T) meeting was initiated to ensure plant l wide work activities (planned or emergent) are communicated to impacted l organizations and any problems are resolved. Previously, all significant work l activities were not reported in the DC&T Meeting. l l
Enclosure 1 GDP 98-1070 Page 3 of 3 l
+
Shift turnover status sheets were developed for Recirculating Cooling Water [
( RCW), Chemical Operations, Utilities, and Power Operations and added to l the existing sheets of Cascade Operations, Feed / Sampling Operations, and l Withdrawal Operations. These were added to the turnover to help ensure l equipment outages, planned activities, and planned maintenance items were j identified to all groups within Operations. l l
The Operations Manager briefed the Shift Front Line Managers on recent l issues associated with oversight and control of work activities. The briefmg l made the FLMs aware ofissues that have resulted in recent regulatory l problems and potential violations. l IV. Corrective Action to Be Taken Programmatic requirements to guide the review and approval of work control packages will be l implemented by May 17, 1999. The intent of this corrective action is to implement l programmatic requirements for Operations to review proposed maintenance activities to ensure l the operational impacts have been reviewed and addressed prior to implementation. The l development of these programmatic requirements are intended to: l l
Address how Work Packages identify the interfaces between safety-related and non- l safety-related systems impacted by the Work Package; l l
Address how Limiting Conditions of Operation (LCO) and Technical Safety l Requirements (TSR) are addressed and LCO actions implemented prior to l commencement of work activities as appropriate; and l l
- Address how infrequent or nonstandard operational activities are adequately I coordinated and controlled. l V. Date of Full Compliance USEC achieved full compliance with TSR 2.4.4.2 on May 14,1998, when the C-335 Centac compressor was restarted and the on-line plant air availability was restored to the minimum required for CAAS horn operable level.
i
- s. 1
+ sa :. , . [
s.
i.
l .
I Enclosure 2 GDP 98-1070
!. Page1of1 i
l LIST OF COMMITMENTS NOV 98009-02 i
Programmatic requirements to guide the review and approval of work control packages will be [- f
. implemented by May 17,1999.
, l '
k i
It j
1 I
.1 l
l 4
I a