Supplemental Deficiency Rept CP-86-23 Re Potential Failure of Reactor Protection Sys Permissive (P-10) to Reset During Power Reduction to Below P-10 Setpoint.Initially Reported on 860403.Procedures ABN-701A,Rev 2 Approved & Issued
ML20153D952
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/05/1988
From: Counsil W, John Marshall
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-23, TXX-88427, NUDOCS 8805090337
Download: ML20153D952 (2)


Text

.

r - ,

=l=' ===

F7 Log # TXX-88427

-- = File # 10110 r C 907.2 7UELECTR/C Ref. # 10CFR50.55(e)

Ul,,'",$[5,"$,,, May 5, 1988 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 P-10 PERMISSIVE SDAR: CP-86-23 (SUPPLEMENTAL REPORT)

Gentlemen:

On April 3, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving a potential failure of the reactor protection system permissive (P-10) to reset during power reduction to below the P-10 setpoint.

We determined that this deficiency was reportable under 10CFR50.55(e) in our report IXX-4835, dated June 5, 1986. This item was subsequently identified by our letter logged TXX-6435, dated May 13, 1987, as an. item for which a final report had been issued. However, the originally scheduled completion date for the implementation of corrective actions has passed and the actions are not complete. This report is submitted to status the implementation of those corrective actions.

As we reported in our letter IXX-4835, the corrective actions for this issue consist of revising three Operations procedures to provide the operator with additional infonnation concerning the P-10 permissive and actions to be taken under certain operating conditicas. The current status of the three -

procedures are as follows:

ABN-701A, Rev.2, "Source Range instrumentation Malfunction," revised per TXX-4835, approved and issued.

ABN-701A, Rev. 2, "Power Range Instrumentation Malfunction," revised per TXX-4835 and in final approval stage. (There was a typographical error in our report TXX-4835, procedure "ABN-703" should have been "ABN-703A.")

IP0-004A, Rev. 1, "Plant Shutdown from Minimum Load to Hot Standby,"

revised per TXX-4835 and in final approval stage.

" "*"^ o"" 3""' " " " ' " " ' - "

  • h

$$85$888E8888824s 6 S DCD

I

.('....,

TXX-88427 May 5, 1988 Page 2 of 2 Procedures ABN-703A and IP0-004A will be issued no later than May 31, 1988.

Records supporting our conclusions and corrective action implementation will be available for your inspector review at that time.

Very truly yours, hik naurN W. G. Counsil By: / ## /

J.*S. Marshall Generic Licensing Manager CBC:grr c-Mr. R. D. Martin, Region IV Resident Inspectors CPSES (3) l t