PLA-2543, Monthly Operating Repts for Sept 1985

From kanterella
(Redirected from ML20138C190)
Jump to navigation Jump to search
Monthly Operating Repts for Sept 1985
ML20138C190
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/30/1985
From: Hirt J, Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-2543, NUDOCS 8512120494
Download: ML20138C190 (9)


Text

.1,...

[ AVERAGE DAILY UNIT POWER LEVEL s

LM j E\ ~%

3 DOCKET NO. 50-387 UNIT -One

( C DATI -October 4,1985 gg 3Y COMPLETED 8Y J.A. Hirt TELEPHONE (717)S42-3917 MONT1g S nte-ber. 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) 1MWe-Net s I 1035 37 1035 2 1014 l3 1033 3 1016 39 1029 -

4 Int? 20 1025 3 1014 1026 21 6 1014 2: 1075 7 630 23 1028 _

S 750 ,4 1027 9 971 1037 23 10 1016 26 1035 11 1014 :7 1032 1941 1037 12 :s 13 '041 29 1035 14 104I 30 1034 15 1036 3; -

16 1037 INSTRUCTIONS On this format,lut she average dady unit power levelin MWe Net for each day in the reputting inonth. Compute to the nearest whole nwgawatt.

19177) 0512120494 050730 l'DH ADOCK 05000307 H PDH '),,

l l

%g MMM 4%

.ag c.,- >@

w y ye .

y

. . . _ .. _ , a L7 nr. ; OPERATING DATA REPORT C DOCKET No. 50-387 DQ 4 DATE October 4, 1985 J,A. Hirt RfC 6N COMPLETED BY TELEPHONE (717)S42-3917 OPERATING STATUS Unit i Susquehanna Steam Elect ric Stat ion N"'"

1. Unit Name:
2. Reporting Penod:

September. 1985

3. Licensed Themul Power tMht): 3293
4. Nameplate Rating (Gross Mbel: 1152
5. Design Electrical Rating (Net MWeI: 1065
6. Masimum Dependable Capacity (Gross Mhel: 1068
7. Masimum Dependable Capacity (Net Mhel: 1032
8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reawnv None
9. Power Lesel To hhich Restricted,if Any INet MWel: None
10. Reasons For Restnetions,if Any: None This Month Yr to.Date Cumulatne
11. Hours in Reportmg renod 720 6.551 20.304
12. Number Of Houri Reactor was Critical 720 3,6I2.5 14.005.2
13. Reactor Resene Shutdown Hour, 0 41.8 513 2
14. Hours Generator On.Lin, 720 3,532.5 13.679.4
15. Unit Resene Shutdown Hours 0 0 0
16. Grou Thermal Energy Generated iMWHI 2.321.530 .19,856.409 41.485.197 17 Grou Electrical Energy Generated (MhHI 750,191 ._3,513.429 13.503.959
18. Net Electncal Energy Cencrated tMhH) 723,373 3.345,738 12,926,308
19. Umt Sernce Factor 100 51.9 67.4
20. Unit Asadability Factor 100 53.9 67.4
21. Unit Capacity Factor (Using MDC Neti 97.4 __

49.5 61.7

22. Unit Capacity Factor IUsing DER Net) 94.3 48 59,8 0 1.5 11,0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months iType. Date,and Duration of Ea(ni hefueling outaqe1 February 15, 1986; 84 day.
25. If Shut Down At End Of Report Period. Estimated Date of Startup: O
26. Units in Test Status IPrior to Commercial Operationt forecast Acinesed INITIAL CRITICALITY l INITIAL ELEC TRICITY C0\lMERCl AL OPER A flON l

t,",, I l

+pANN45 -

w

')[Eb, 'i -
-/ 7 '
  • M: 5
  • ' U "' R DOCKET NO. 50-387 UNIT SHUTDOWNS AND POWER REDUCTIONS One .-

g 3 UNIT NAME October 4, 1985 g@ , DATE

(

COMPLETED BY J.A. Hirt.

    1. pc 5 E REPORT MONTil Sep t ernbe r , 1985 (717)S42-3917 TELEPHONE  !

E c

, {?g  ; - E ~4

}gE Licensee E-t, $ *, Cause & Corrective h Date i ( 2 Event p {'! Action to

$E 5 j ;75 c Repori e mV g' Prevent Recurrence d

4 850907 5 0 F 5 N/A ZZ ZZZZZZ Control Rod Sequence Exchange.

= 3 4 1 2 F: For sed Reason: Methext: Exhibit G-Instructions 5 Scheduled A-Equiprnent Failure (Expbin) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Saam- Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Esent Repint tLERI File (NUREG.

D-Replatory Restrictitm 4-Continuation 0161)

E4)perator Traming & Ucense Esamination from previcus month F-Adnunistratne 5 G4)pe.ational Error (E xplain t 5-Reduction Exhibit I - Same Source 08/77) II O her( E splain) 9-Other

. a UNIT 1  !

SUSQUEHANNA STEAM ELECTRIC STATION Docket No. 50-387 Date October 4,1985 Completed by J.A. Hirt Telephone (717)S42-3917 i

Cha llenges to Main Steam Safety Relief Valves None.

Changes to the Offsite Dose Calculatlon Manual None. '

Major Changes to Radloactive Waste Treatment Systems None, m__._________.___.__.___.__..__.__.________________

[

. AVERAGE DAILY UNIT POWER LEVEL

,/

F~Q \%

3 DOCKET NO. 50-388 LM ~4 UNIT Two C DATE October 4, 1985

(+ 9 ggg gY COMPLETED BY J.A. Hirt TELEPHONE (717)S42-3917 MO N September, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (Mwe Net I 1042 37 1044 2 1034 is 1042 3 1033 g, 1037 .

4 1027 20 1034 g 1027 21 1035 6 1028  ;; 1034 7 1029 23 1035 8 1029 24 1037 9 1033 23 1047 10 1034 26 1043 l3 1048 1041 37

1050 3 1045 l3 1051 29 1042 34 746 1042 30 15 875 3 16 10k2 INSTRUCTIONS On this format.hst the avenge dady urut power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole messwatt.

14177) 1 l

y

~ hc ~~ ~g&

y Q -:+ 7 Z . . . . _ - - 3 t7 . rr J OPERATING DATA REPORT

  • N  %

YD O DOCKET NO. 50-388 O D DATE October 4, 1985 J.A. Hirt NIC fN COMPLETED BY TELEPHONE 1717)S42-3917 OPERATING STATUS Unit 2 b " '"

1. Unit Name: Susauehanna Steam Elect ric Station
2. Reporting Period: Spetember. 1985
3. Licensed Thennal Power iMhti: 3293 1152
4. Nameplate Rating (Gross Mhel:
5. Design Electrical Rating (Net MWei: 1065
6. Masimum Dependable Capacity (Gross Mhel:

1068

7. Masimum Dependable Capacity 4 Net Mwe): 1032
8. If Changes Occur in Capacity Ratings (ltems Number 3 Through 71 Since Last Report. Gise Reasons:

None

9. Power Lesel To which Restricted.lf Any tNet MWei. None
10. Reasons For Restrictions. lf Any: N ne This Month ir. to Date Cumulatne
11. Hours in Reportmg Period 720 5.543 ,

5,543

12. Number Of Hours Reactor was Critical 720 5.063,8 5.063.8
13. Reactor Rewne Shutdown Hours 0 432 1 432.7
14. Hours Generator On.Line 720 4.961.5 ___ 4.961.5
15. Urut Rewne Shutdown Hour, 0 0 0
16. Gross Thermal Energy Generated IMWH) 2.331.711 ._].5 .6 % . 5 0 7 15.695.507
17. Gross Electrical Energy Generated IMhH1 762,634 5,120.668 5.120.668
18. Net Electrical Energy Generated (MhH)

/36,4/4 J ,937.413 4.937.413

19. Umt Semce Factor 100 89 5 89 5
20. Unit Availability Factor 100 __

89.5 89 5

21. Unit Capacity Factor IUsing MDC Net) 99.1 86.3 86.3
22. Unit Capacity Factor 10$mg DER Neti 96.0 83.6 83.6
23. Unit Forced Outage Rate 0 10.5 10 5
24. Shutdowns Scheduled Over Nest 6 MonthsiType.Date,and Duration of Ea(lo None 25, if Shut Down At End Of Report Period.Eirimated Date of Startup: N
26. Umts in Test Status (Prior to Commercial Operationt' forecast Tchiesed INiilA L CRITICAlliY INITI AL ELEC TRICl!Y COM\lERCI % L OPER A TION __

gyl*

  • l

r1 Si)gNN 4j ,

, - '((k..$j t

. y .

9 i

'l LN it UNIT SHUH) OWNS AND POWER REDUCTIONS DOCKETNO. 50-388 ,

g R UNIT NAME Two M DATE October 4, 1985 C # LE Y

%3C S REPORT MONiil September. 1985 gt hh) 2-3917 E .

w.

.5 E 3 Eh Litensee E*, *

. Cause & Corrective N. Ibte {

H 3g 5

( jgE Event g7 mO p Actitm to f jg Report *r g' Prevent Recurrence 6

14 850914 S 0 F 5 N/A ZZ ZZZZZZ Control Rod Sequence Exchange.

I 2 3 4 F- Finced Reasim: Method: Exhibit G - Instructiims S. ScheduleJ A Equipment Failure (Emplain) 1. Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refocling 3-Automate Scram. Esen: ReporI (LE RI Fi8e (NUREG-D-Regulatory Restriction 4 Continuation 0161)

EOperator Training & license Examinatio" from previous month F-Adrrunistratise 5 Goperational Error iEsplain) 5-Reduction Eshibit I - Same Source (9/77) IIOther (Esplain t 9-Other

UNIT 2 SUSQUEHANNA STEAM ELECTRIC STATION Docket No. 50-388 Date October 4, 1985 Completed By J.A. Hirt Telephone (717)S42-3917 Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual i

i None Major Changes to Radioactive Waste Treatment Systems None 1

1

.f l l

'I l

J

F

.PPat Pennsylvania Power &' Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 I 77G5151 i

Harold W. Keiser Vice President-Nuclear Operations 215/770-7502 OCT 141985 Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS ER 100450 FILE 841 Docket Nos. 50-387/NPF-14 PLA-2543 50-388/NPF-22

Dear Mr. Beebe:

TheSeptember1985monthlyoperatingreportsforSusquehAnnaSESUnits1and2 are attached, y s Very truly yours,

) [

H. W. Keiser _,

i Vice President-Nuclear Operations y .,

~

)

Attachment ,

I cc: Dr. Thomas E. Murley >

Regional Administrator-Region I i '

, T< ,

U.S. Nuclear Regulatory Commission  %

631 Park Avenue ,

King of Prussia, PA 19406 Director q Office of Inspecti,oh and Enforcement U.S. Nuclear Regulatory Commission 7 Washington, D.C. 20555 Attn: bocument Control Desk (12 copies)

Mr.R.H.Jbcobs-NRC , fs j ,;

bp. M.'J. Campapsone - NRC '

p

, ',7 3 a t ,

.