ML20136H251

From kanterella
Jump to navigation Jump to search
Administrative Procedure AD 1844.02, Control of Work (Mwo)
ML20136H251
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/02/1985
From: Briden D, Ramsett L, Storz L
TOLEDO EDISON CO.
To:
Shared Package
ML20136H086 List:
References
AD-1844.02, NUDOCS 8601090329
Download: ML20136H251 (90)


Text

,

- - 1 AD 1844.02 Davis-Besse Nuclear Power Statian Unit !b. 1 A&unistrative Procedure AD 1844.02 CCNTBOL OF NORK (MO)

. . ~

Record of Approval and Changes Orc +J'L-d By H. Frank Reave d 10/10/85 Date iLT1:0M ?? '

>. . / tIf29fA9 secuy. Head Qire Rec:rrmded By f3 La . R rullu NOV 2 7 ;,ga3 SRB 7 Date lJa .4p.mved b. IIhteh9ff

' ' t. Assurance Director App:rved By - .

Plant Mr r

// 3.)7 Bhts

% vi.sica SPB Q,T Plant .onapar i

.b. Pnotrraendation Date Apnroved Date Appro'ral Date l

l l

I 8601090329 860103 i PDR ADOCK 05000346 p PDR '

. ~ _ . . . - . . .. . -- - -. - . . ..

AD 1844.02.0 Page i List of effective pages

-Page No. Revision Page No. Revision i 0 31 0 ii 0 32 0 4

iii 0 33 0 1 0 34 0 2 0 35 0 3 0 36 0

'4 0 37 0 5 0 38 0 6 0 39 0 7 0 40 0 8 0 41 0 9' 0 42 0

10 0 43 0

! 11 0 44 0

+

12 0 45 0 4 13 0 46 0 14 0 15 0 16 0 1

17 0 a

18 0 19 0 1 20 0 l 21 0 22 0 i 23 0 j 24 0

, 25 0 4

26 0

27 0 28 0 1 29 0 30 0 f

4 4,

I i

l L

. .s . . _ . . , _ _ . . - - __ . _ . . . . , _ , . . . . . . . . . _ ,_ . , , . . . . - - . , , . . . . . , _ _ . _ . . , . .

AD 1844.02.0 Page ii TABLE OF CONTENTS page 1.0 Purpose . . . . . . . . ..... . . . . .... . ... . . . . . . 1 2.0 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . I 3.0 References. . . . . . .. .. . . .. . ..... . . .. . . . . . . 1 4.0 Definitions . . . . . . . ... . ... ....... . . . . . . . . 2 5.0 Responsibilities. . . . .. ... .. . .. ... .... . . . . . . 3 5.1 Plant Manager. . . ..... . .. ........ . . . . . . . 3 5.2 Assistant Plant Manager-Maintenance. . . ...... . . . . . . 4 5.3 Maintenance Superintendent . ... ... ... . ..... . . . 4 i

5.4 Maintenance Section Foremen. . . . . ..... ..... . . . . 5 5.5 Maintenance Shop Personnel . . . . . . . . . . . . . . . . . . 5 5.6 Planning Superintendent. ... .. .. .... . . . . . . . . . 5 5.7 Planning rianager . . .. .. ... . .. .. .. .. . . . . . . 5 5.8 Planning Supervisor. .. . .. .. . .. ....... . . . . . 5 5.9 Planner. . . . . . ... .. ... ...... .. . . . . . . .

. 6 5.10 Planning Staff Senior Reactor Operator (SRO) . . . . . . . . . . 6 5.11 DBMMS Supervisor . . ... .. .. . .... . . . .. .. . . . . 7

, 5.12 Preventive Maintenance Specialist. ......... . . . . . . 7 i 5.13 Maintenance Coordinator. . ... . . .. . . ..... . . . . . 7 5.14 Operations Superintendent / Operations Coordinator . . . . . . . . 7 5.15 Operations Shift Supervisor. .. . . . . . . . .. . . . . . . . 7 5.16 Chemistry and Health Physics Superintendent. . . .. . . . . . . 8 5.17 Quality Control Supervisor . .. . . .... .. ... . . . . . 8

. 5.18 Code Inspection Supervisor . .. . . .. .. . . ... . . . . . 9 i

5.19 Document Control Sup rvisor. . . . . . . . . . ..... . . . . 9 5.20 Facility Modificatic_ Manager. . . . . . .. . . .. . . . . . . 10 5.21 Outage-Manager . . . . .. . .. . ... ... .... . . . . . 10 i

5.22 Security Supervisor. . . . . . . . . . . . . . . . . . . . . . . 10 5.23 Fire Protection Coordinator. . . .... . .. ... . . . . . . 10 5.24 Facilities Engineering Department. ......... . . . . . . 11 i.

. _ _ _ _ , . _ . . - m -. , - ,._ _..

AD 1844.02.0 Page iii TABLE OF CONTENTS MWO BLOCK NUMBER PAGE 6.0 Procedure . .. .. ...... . .. . . . . .. . . . . . .. .11 6.1 Maintenance Work Control; General Concepts and Requirements. .. . . . . . . . . . . . . . . 11 6.2 Maintenance Task Identification. . . . . . . . . . . . . . .14 6.3 Maintenance Work Order (MWO) Initiation. . . 1,2,3. . . . 17 6.4 Maintenance Work Plan Development. . . . . . 4-10,27, 23'. 20 6.5 Parts / Materials /

Special Equipment Procurement for Maintenance. . . . . . . . . . . . . . . . 27 6.6 MWO Scheduling / Priority Review . . . . . . . 10 . . . . . .28 6.7 MWO Review by QC . . . . . . . . . . . . . . .11 . . . . . .29 6.8 MWO Review by SRO. . . . . . . . . . . . . . 23 . . . . . 30 6.9 Maintenance Department MWO Processing. . . . 12, 13 . . . 31 6.10 MWO Implementation . ... ... . . . . . .. . . . . . . 32 6.10.1 Shift Supervisor / Foreman Release to Prc ced . . . . . . . . .14 . . . . . .32 6.10.2 Performance / Completion of Work . . 15-17. . . . 34 6.10.3 Problem Resolution . . . . . . . . . ......37 6.10.4 Suspension of Work . . . . . . . . . . . . . . . 39 6.10.5 Returning Equipment to Service . . .. . . . . . .41 6.11 Review of Completed Work (Foreman and QC).18, 19, 20, 21 . 43 6.12 Post Maintenance Testing . . .. . . . . . .. . . . . . . 44 6.12.1 Requirement Verification . . . . . .22 . . . . . .44 6.12.2 Test Scheduling. . . . . . . . . . . . . . . . . 45 6.12.3 Test Performance and Review. . . . .23, 24. . . 45 6.12.4 QC Review of Test. .. . . . . . . .25, 27. . . 46 6.13 Operations Shift Supervisor Final Review . . .26. . . . . 48 6.14 MWO Closeout and Filing. . . . . . . . . . . . . . . . . . 48 6.14.1 MWO Review . . . .. . . . . . . . 28, 29. . . 48 6.14.2 MWO Records to Initiating Organizations. . ... . . . . . . . . . . . . . 49 6.14.3 MWO Filing . . . .. . . . . . . . . . . . . . . 49 6.15 Immediate Maintenance Action . . . . . . . . . . . . . . . 49 7.0 Enclosures. . . . . . . . . . . . . . . . . . . . . . . . . . . 50 8.0 Documentation . . . .. ... . .. . . . . . . . . . . . . . . 50 8.1 MWO Information Elements. . . . . . . . .. . . . . . . . .50 8.2 MWO Review and Approval Signoffs. . . . . . . . . . . . . 50 8.3 Special Processes and Test Documentation . . ... . . .. . . . . . . . . . . . . . 51 L_ .-

AD 1844.02.0 Page 1 of 51

1. PURPOSE This procedure describes the methods and responsibilities for administrative control of maintenance and modification work at the Davis-Besse Nuclear Power Station. The control of modification work shall be the same as that specified in this procedure for maintenance work, plus controls established in other procedures which address plant modifications.
2. APPLICABILITY This procedure is applicable to all maintenance and modification work activities performed at the Davis-Besse Nuclear Power Station.
3. REFERENCES 3.1 Toledo Edison Quality Assurance hanual (NQAM) 3.2 AD 1803.00, Safety Tagging Procedure 3.3 AD 1806.01, Nuclear Plant Reliability Data System (NPRDS) 3.4 AD 1807.00, Control of Conditions Adverse to Quality 3.5 AD 1823.00, Jumper & Lifted Wire Log 3.6 AD 1831.00, Quality Verification by Station Personnel 3.7 AD 1835.00, Plant Cleanliness Inspection Program 3.8 AD 1842.00, Chemistry and Health Physics 3.9 AD 1844 Procedure Series, Maintenance 3.10 AD 1845 Procedure Series, Changes Tests and Experiments 3.11 AD 1846.00, Requisition of Materials and Services 3.12 AD 1847.00, Materials Control 3.13 AD 1848 Series, Control of Station Records 3.14 AD 1849.00, Measuring and Test Equipment Control and Calibration 3.15 AD 1851 Series, Welding 3.16 HP_1601.03, Radiation Exposure Permit Procedures 3.17 ASME Boiler and Pressure Vessel Code,Section I, Section III,Section VIII, Section IX and Section XI

, _ - . . -_ . _ . , _ . ~ . . _ _ . _ _ _ _ . __ -_

AD 1844.02.0 Page 2 of 51 3.18 Davis-Besse Nuclear Power Station Unit 1 Fire Hazards Analysis Report 3.19 AD 1808.19, Control of the Industrial Security Plan and Safeguards Information 3.20 B31.1 Power Piping Code i

3.21 Facility Modification Department Procedures (FMDP) 3.22 Davis-Besse Maintenance Management System (DBMMS) Manual 3.23 AD 1838 Series, Surveillance and Testing Program

4. . DEFINITIONS 4.1 Work Request - A form, Enclosure 1 (ED 6665.4), used to identify a need for maintenance work.

4.2 Maintenance Work Order (MWO) - The document used to provide the necessary information, instructions and requirements for mainten-ance work, and to document the surveillance, approval, tracking and historical data for work activities. (See Enclosurc 2.)

4.3 Davis-Besse Maintenance Management System (DBMMS) - A computerized system used to generate NWO's.and maintain.information about the status of active MWO's.

4.4 Outside Organization - Any group, supplier / contractor or agency other than the Davis-Besse Station Staff. This also includes organizations within the Toledo Edison Company but not'a part of 4.

the Davis-Besse Staff.

4.5 Maintenance / Modifications - Installation, modification, repair or

replacement of plant equipment, systems, structures or materials.

Certain tests which are controlled as facility changes (usually non-routine or "one-time-only" tests) are considered maintenance work for control purposes.

4.6 Nuclear Safety Related Equipment - Those facility structures, systems and components necessary to ensure the integrity of the reactor coolant pressure boundary, the capability to shutdown the reactor and maintain it in a safe condition, or the capability i

to prevent or mitigate the consequences of accidents which could result in potential off-site exposure comparable to the guideline exposures of the NRC Regulation 10 CFR Part 100.

4.7 Nuclear Safety Related Maintenance - Maintenance work which affects.

nuclear safety related equipment.

l l

AD 1844.02.0 Page 3 of 51 4.8 Skill of the Craft Work - Maintenance work which falls under the normal craft capabilities according to the job classification (example: Journeyman; Certified Welder, etc.) as defined in AD 1844.00, Conduct of Maintenance.

4.9 N/A - Not applicable - A designation that an action, review or approval is not required for the task addressed on the MWO.

4.10 Q1 - The classification of structures, systems and components that.

are relied upon to remain functional during and following design basis events to ensure: 1) the integrity of the reactor coolant boundary; 2) the capability to shutdown the reactor and maintain it in a safe shutdown condition; and 3) the capability to prevent or mitigate the consequences of accidents that could result in potential offsite exposurer comparable to the guidelines of 10CFR Part 100. s 4.11.Q2 - The classification of those structures, systems and components that mitigate the hazards or conditions which could adversely affect the safety functions of Q1 components.

This classification does not include components whose malfunction might require a Q1 system to function (i.e., those components whose failure might challenge a safety system) but only those components which mitigate hazards or conditions. '

4.12 Q3 - The classification of those structures, systems and components the malfunction or inefficient operation of which would directly impact plant availability and capacity factors.

These components whose malfunction might require a Q1 system to function (i.e., those components whose failure might challenge a safety system) may be classified Q3.

4~.13 NQ - The classification of those structures, systems components which do not fall in any of the above three categories (Q1, Q2, or Q3).

5. RESPONSIBILITIES 5.1 Plant Manager 5.1.1 Performance and docuinentation of maintenance in accordance with the provisions of this procedure.

5.1.2 Approval and issuance of nuclear safety-related maintenance procedures and vendor manuals.

5.1.3 Review and approval of all required reports dealing with maintenance activities at the Dtvis-Besse Nuclear Power Station.

AD 1844.02.0.

Page 4 of 51 i

5.2 Assistant Plant Manager-Maintenance 5.2.1 Coordinating maintenance department activities with other plant departments and Nuclear Mission Divisions of Toledo Edison.

5.2.2 Ensuring that the Plant Maintenance Program complies with

.the NQAM.and other applicable requirement source documents.

5.3 Maintenance Superintendents 5.3.1 Conduct of the maintenance program.

5.3.2 Training and qualification of maintenance personnel assigned to perform work.

5.3.3 -Preparation and review of Maintenance Procedures (MP),

Instrument Calibration Instructions (IC) and Maintenance Instructions (MI).

5.3.4 Providing technical support for the evaluation of equipment malfunctions to determine required repairs.

, 5.3.5 Assisting in the determination of maintenance work order priorities.

5.3.6 Identification and documentation of conditions adverse to quality- discovered as a result of performing work.

i 5.3.7 Providing support to the Planning Department as needed to resolve technical questions in developing maintenance work plans.

5.3.8 Supervision and coordination of maintenance activities including those performed.by outside organizations working under their direction, i 5.4 Maintenance Section Foremen i

5.4.1 Performance of maintenance work in compliance with approved procedures.

5.4.2 Assigning qualified personnel to perform maintenance activities.

5.4.3 Assuring that required work is performed.

5.4.4 Assigning qualified personnel to oversee and assist outside organizations in performing maintenance work.

r R

L

AD 1844.02.0 Page 5 of 51 5.4.5 Ensuring that proper safety procedures are identified and followed.

5.4~.6 Maintaining an awareness of the status of maintenance work.

5.4.7 Preparing and reviewing maintenance procedures and instructions as directed by the Maintenance Superin-tendent.

5.4.8 Review of work request forms submitted by their personnel.

5.4.9 Reviewing MWO packages at the completion of the work for compliance with documentation requirements.

5.5 Maintenance Shop Personnel 5.5.1 Performance of maintenance activities as directed by approved maintenance work order packages.

5.5.2 Providing the required tagging, jumper and lif ted wire list for the Maintenance Work Order (MWO).

5.5.3 Adherence to the Maintenance Work Order (MWO) require-ments and submission of proper documentation when the maintenance actions have been performed.

5.6 Planning Superintendent 5.6.1 Preparation of the Control of Work (MWO) procedure 5.6.2 Conduct of the Planning Department 5.6.3 Coordination of Planning Department activities with those of the other Station Departments.

5.7 Planning Manager 5.7.1 Assigning Planning Supervisors for MWO's 5.7.2 Maintaining overall control of the planning and scheduling of maintenance work 5.7.3 Reviewing Non-Conformance Reports (NCR) and Deviation Reports (DVR) received by Planning for resolution implementation and assigning Planning personnel to generate MWO's for'the work.

i l

AD 1844.02.0 Page 6 of 51 i

1 5.8 Planning Supervisor 5.8.1 Planning, coordinating and scheduling caintenance and station modification work.

5.8.2 Coordination of maintenance efforts among all station departments.

5.8.3 Review and approval of completed maintenance work orders.

5.9 Planner 5.9.1 Planning and scheduling of maintenance work.

I 5.9.2 Determining the classification of maintenance work with ,

respect to the degree of review and quality control (QC) '

required.

5.9.3 Evaluating equipment malfunctions to determine required repairs.

t 5.9.4 Preparation of MWO packages for maintenance tasks including developing the work description and sequence, identifying procedures needed, and routing the package for all required reviews and approvals.

5.9.5 Notifying all concerned parties concerning the suspension or delay of MWO's.

5.9.6 Monitoring work'in progress to ensure that activities conform to the established schedule.

5.9.7 Initiating and coordinating the procurement of parts, materials, and special equipment needed for maintenance i work.

5.9.8 Initiating and coordinating completion of Nuclear Plant Reliability Data System (NPRDS) reports and forms.

5.9.9 Initiating required changes to the DBMMS Equipment Data Base.

5.10 Planning Staff Senior Reactor Operator 5.10.1 Reviewing MWO work plans to develop priority assignments which are consistent with safe and reliable operation of the. plant.

5.10.2 Reviewing MWO's to ensure that post maintenance testing .

l specified will be adequate to satisfy Technical l Specification requirements for operability of equipment.-

\-

l

AD 1844.02.0 Page 7 of 51 5.11 DBMMS Supervisor Maintaining information files required for generation of MWO's, including component information, MWO history information, and other information files described in the DBMMS Manual.

5.12 Preventive Maintenance Specialist 5.11.1 Maintaining the preventive maintenance schedule for plant equipment and initiating MWO's as needed to perform the scheduled work.

5.11.2 Coordinating the performance of preventive maintenance work and periodic testing with the performance of Surveillance Testing where possible to minimize "out of service" time for plant equipment.

5.13 Maintenance Coordinator 5.13.1 Coordinating the performance of maintenance work between the Maintenance, Planning, and all other plant departments.

5.13.2 Ensuring that maintenance shop personnel have approved MWO's for scheduled tasks.

5.13.3 Assisting Maintenance shop and Planning personnel to resolve problems affecting completion of tasks and MWO documentation.

5.14 operations Superintendent / Operations Coordinator 5.14.1 Reviewing priorities of maintenance work to ensure that priorities are established consistent with safe and reliable operation of the plant.

5.14.2 Reviewing the scheduling of maintenance work with the Planning Department to integrate maintenance activities smoothly into the operating status of the Station.

5.14.3 Identification and reporting of required maintenance.

5.15 Operations Shift Supervisor 5.15.1~ Safe operation of the station while maintenance is being performed.

5.15.2 . Ensuring that proper lineup and safety tagging are per-formed for maintenance work.

~

l i

l i

'v

AD 1844.02.0 Page 8 of 51 5.15.3 Reviewing and approving work requests submitted by Opera-tions personnel. ,

5.15.4 Assigning priorities to maintenance activities.

5.15.5 Releasing equipment to Maintenance, Electrical I&C or Construction personnel for performance of maintenance and/or plant modifications.

5.15.6 Reviewing the classifications of maintenance activities specified on MWO's.

5.15.7 Returning systems and equipment to operating status following the completion of maintenance work.

5.15.8 Restoring required equipment to service prior to

completion of MWO's when required to satisfy Operations requirements.

, 5.15.9 Identification of post-modification tests, verification and signoff as required to ensure functional acceptability of equipment and systems.

i 5.15.10 Directing immediate action maintenance as required.

5.16 Chemistry & Health Physics Superintendent 5.16.1 Preparation and review of radiation exposure permits (REP) for maintenance in radiation controlled areas.

5.16.2 Monitoring radiation exposure as specified in REP's as required by the particular Maintenance Work Order (MWO).

5.16.3 Verification of cleanliness of components and system as required by plant cleanliness procedures.

5.17 Quality Control Supervisor 5.17.1 Reviewing. maintenance work plans to determine require-i ments for inspections.

5.17.2 Designation of qualified inspectors to perform inspec-

[ tions.and establish hold / witness points as applicable to the Maintenance Work Order.

5.17.3 Identification and reporting of conditions adverse to quality and issuance of nonconformance reports (NCR) and surveillance reports.

. , - - - , , - - + - . , -

-,.,,,--.,--y, , -

y.#-, , , . .. , , , , -,. -- ,c ,m p, ..g-. -

r,,,.., ,,- e

AD 1844.02.0 Page 9 of 51 5.17.4 Ensuring that QC Inspectors verify compliance with safety, inspection and work procedures identified on NWO's.

5.17.5 Reviewing work requests generated in their Section.

5.17.6 Reviewing MWO packages after work has been completed to assure that the work was performed correctly and that documentation requirements have been met.

5.17.7 Performance of Nondestructive Examinations (NDE).

5.18 Code Inspection Supervisor.

5.18.1 Reviewing maintenance work plans involving welding or other work on vessels or other equipment subject to ASME Code rules to determine requirements for inspections and examinations.

5.18.2 Designation of qualified Code Inspectors to perform inspections or witness examinations and to establish hold / witness points as applicable on MWO's which involve

, welding or other work on equipment subject to Code rules.

5.18.3 Ensuring that Code Inspectors verify compliance with Code rules for welding and examinations as detailed in inspec-tion and work procedures identified on MWO's.

5.18.4 Scheduling Authorized Nuclear Inspector (ANI) and/or Authorized Nuclear Insurance Inspector (ANII) reviews of work plans, and coordinating the participation of the ANI/ANII in witnessing work and testing.

5.19 Document Control Group 5.19.1 Providing assistance in meeting documentation require-ments associated with MWO's for maintenance and modification activities.

5.19.2 Providing adequate control of the documentation associated with all MWO's implemented at the station.

5.19.3 Distributing approved Field Change Request (FCR) supple-ments and Field Change Notices (FCNs) to the appropriate maintenance, Facility Modification Division (FMD), and contractors personnel for implementation.

5.19.4 Distributing approved MWO's to maintenance and contractors personnel for implementation.

i i

. _ , , __ , - ~ _ _ , _ - _ - - - , . - , , _ _ _ , - - - - _ -- ,2. . - _

q AD 1844.02.0 Page 10 of 51 5.19.5 Retrieval and filing of all completed attachments, travelers, and associated documents during the imple-mentation of MWO's.

5.19.6 Coordinating closeout of MWO's after the work has been completed.

5.19.7 Routing NPRDS forms as detailed in Enclosure 6.

5.20 Facility Modification Manager 5.20.1 Coordinating assigned activities involving modifications and assigned maintenance work for Davis-Besse Nuclear Power Station.

5.20.2 Reviewing, monitoring and evaluating modification methods,' procedures, and the status of modification work.

5.21 Outage Manager 5.21.1 Developing schedules and priority assignaents for tasks ~

to be performed during outages. (work which can only be performed during outages) 5.21.1 -Reviewing the scheduling of outage and non-outage tasks with the Planning Department to integrate maintenance activities smoothly into the operating status of the plant.

5.22 Security Supervisor

. 5.22.1 Coordination of security requirements that may affect the performance of an MWO to Security Department Administrative Assistant.

5.22.2 Discussing staffing availability with the Planning Department or with the Operations Department regarding the need for a security officer during MWO activities.

5.22.3 Making security personnel available for MWO's that require the presence of a security personnel.

5.23 Fire Protection Coordinator i

5.23.1 Assisting the Planning Department in determining the effects of maintenance tasks on Fire Protection System equipment and operability.

5.23.2 Advising the Planning Department as needed regarding special precautions or measures to be taken to accomplish

maintenance tasks.

?

L

AD 1844.02.0 Page 11 of 51 5.24 Facilities Engineering Department 5.24.1 Assisting the Planning Department in determination of the Quality classification of equipment and activities.

5.24.2 Advising the Planning Department as to whether or not plant components are required to be environmentally qualified and providing Planning with those measures which are to be taken to maintain the environmental qualification of plant equipment.

6. PROCEDURE ~

6.1 Maintenance work control general concepts and requirements The objective of maintenance work control is to maintain the safe and efficient operation of the plant. The key elements of the control process are as follows:

1) Timely identification _of tasks
2) Thorough planning of the work
3) Appropriate priority determination and careful integration of the work into the Station schedule
4) Control of plant equipment by the Operations Shift Supervisor at all times
5) Correct performance of the work and completion of required inspections and tests
6) Accurate and appropriate status assignment and tracking
7) Consistent records accumulation and storage.

The Maintencnce Work Order (MWO) (Enclosure 2) is the document which represents each task within the control system. Each step in the process is documented on the MWO. After the task is completed the MWO,' and the work, test, and inspection. records associated with it, become a part of the configuration and equipment history record for the plant. The MWO is used to provide the written authorizations for control of maintenance work. It becomes the

.auditable record of the control of work. Enclosure 7, Work Control (MWO) Flow Chart, illustrates the basic steps involved in the normal work control process.

A computer based system is used to maintain information about equipment and ongoing maintenance work in the plant. It is called the Davis-Besse Maintenance Management System (DBMMS). It provides convenient storage and retrieval of information about maintenance tasks and about equipment in the plant.

An important exception to the normal processing of tasks within the i control system is "immediate maintenance action". The Operations

! Shift Supervisor has the authority and respo'sibility n to direct j immediate action by maintenance personnel when it is required to

AD 1844.02.0 Page 12 of 51 i

l 6.1 (continued) t ensure the safe operation of t.he plant. No provision of this procedure shall be interpreted or used to limit the ability of the Operations Shift Supervisor'to perform such immediate maintenance work.

Subsections 6.2 through 6.15 detail.the requirements to be met for tasks which are processed normally. The control of work shall be ,

the same for both maintenance and modification work. For modification work, the duties of the planner / scheduler and maintenance coordinator shall be performed by the modification coordinator. The Facility Modification Manager serves as the Planning Manager for these tasks. The additional requirements

.which apply to modification work are detailed in Facility Modification Procedures. Subsection 6.16 specifies the require-ments for work performed as "immediate maintenance actions".

Additional general requirements which apply to work performed on plant equipment are listed in 6.1.1 through 6.1.4.

6.1.1 The DBMMS shall be used for generation and tracking of Maintenance Work Orders (MW0's). Manual generation and tracking is permitted whenever the DBMMS is unavailable.

When manual MWO processing is necessary, the Document Control Group shall assign MWO numbers and maintain a log of such MWO's until they can be entered into the DBMMS.

Planning and scheduling personnel shall monitor tasks in progress and maintain a current status code on the DBMMS system for each MWO. The status codes are detailed in Enclosure 8.

6.1.2 Generic MWO's may be generated to control maintenance work of a repetitive nature (such as changing light bulbs). The MWO remains active for a specific period of time, normally three (3) months -- not to exceed one-year; and work will be performed against it in response to work requests generated during that period.

6.1.3 During the implementation of a MWO, changes to the MWO may be needed. Such, change ~s may be made provided that each entry changed receives the same reviews and approvals as required for initial entry of the item. For all other changes the Planner shall ensure that required "re-approvals" have been granted prior to resumption of the work.

In the specialicase of changing the scope of the MWO, i.e. the equipment addressed and/or the tasks to be performed, additional means must be provided to ensure the control of the work. Such scope additions must be made on MWO continuation sheets and places for approval signoffs must be provided~for the Planning Supervisor, the Shif t Supervisor and where applicable, QC, the Code Inspector and the Maintenance Coordinator.

e

?

b s_ _j t ~-

AD 1844.02.0 Page 13 of 51 6.1.4 Whenever MWO processing may not proceed while some support activity is being performed, the MWO will be placed on " HOLD" status. Enclosure 8 lists the various

" HOLD" status codes. When on hold, MWO's which have been printed whall be forwarded to the Document Control Group for filing. Planning, Maintenance, QC and Operations may place MWO's on hold. The individual who assigns the

" Hold" status shall immediately advise the Planner when the need for a " hold" is determined. The Planner shall advise the Shift Supervisor of all " Hold" status assignments for MWO's which affect nuclear safety related equipment. The Shift Supervisor's concurrence is required for placing such MW0's on hold.

6.1.5 A MWO may be " voided" if no actual work has been performed. The Planner or Maintenance. Shop Foreman may write " void" in Block 15 (Work Completed) of the MWO and entering the reasons for voiding the MWO in the

" Description of Work Performed" Section of the MWO --

Personnel / Equipment History Form. (Enclosure 4)

The " voided" MWO shall be then routed through those individuals who have signed it for acknowledgement or approval. It shall then be filed as a completed MWO.

6.1.6 The processing of work control documents shall be performed in a manner consistent with the urgency of the work. The Shift Supervisor's assignment of priority to tasks takes precedence over any other priority assignment.

6.1.7 The latest revisions of applicable procedures shall be used in the performance of maintenance work.

1. When revisions or modifications to procedures are received by the DCG, they shall determine which, if any, MWO's which have been sent to Maintenance for implementation require (list) the' revised procedure.

The DCG shall send written notification of the procedure revision or modification to the Lead Shop General Foreman identified for the MWO's which require the procedure. They shall also send copies of the revised procedure if a copy will be required in the field to do the work.

2. The Lead Shop General Foreman shall attach such copies of revised procedure or modification to the-affected MWO packages and discard any superseded copies. He shall ensure that the Shop personnel are made aware of such changes to procedures. He shall acknowledge his receipt of the revised procedures or modifications to the DCG by signing, dating, and returning the notification.

AD 1844.02.0 Page 14 of 51 6.1.7 2 (continued)

3. If the work cannot proceed without resulting in a violation of the revised or modified procedure, the foreman shall place the work on " hold" and. advise the Maintenance Coordinator of the problem. When the problem is resolved, the MWO may be returned to active status and work may proceed.

6.2 Maintenance Task Identification Maintenance tasks are identified from three basic sources; Preventative Maintenance Schedules, modifications to the plant and conditions to be corrected.

6.2.1 Preventa'tive Maintenance (PM) tasks are defined and scheduled per AD 1844.01, Preventative Maintenance. The-PM Specialist uses the DBHMS to produce the appropriate task descriptions for each time period based on the PM schedule stored in its data base for the equipment.

6.2.2 The tasks required to make modifications to the plant are identified in Facility Change Request (FCR) packages.

The FMD Modification Coordinator shall identify the tasks

.to be performed to implement each modification.

6.2.3 -Nonconformance Reports (NCR)

Nonconformance Reports (NCRs) shall be issued in

.accordance with Section 15 of the Nuclear Quality Assurance Manual (NQAM), "Nonconformance". The disposition of a NCR shall. initiate a MWO when the NCR disposition is " repair" or " rework." The QC Organization shall forward the NCR to Planning or the Facilities Modification Division for initiation of'the MWO.

6.2.4 QC Surveillance A QC surveillance of work being performed may result in an unsatisfactory Surveill nce Report for discrepancies not requiring a NCR. The resolution of the Surveillance Report may require a MWO. The personnel responsible for disposition of the report shall forward it to Planning

.for initiation of a MWO.

AD 1844.02.0 Page 15 of 51 6.2.5 Quality Assurance (QA)

QA Audits may result in findings which require the performance of maintenance work for resolution. Audit Finding Reports (AFR) shall be issued in accordance with NQAM Section 18, Audits. Such AFRs may initiate an MWO.

The department responsible for the response to the AFR shall route a copy of the AFR to the Planning Supervisor for initiation of the MWO.

6.2.6 Deviation Report (DVR)

Deviation Reports shall be issued in accordance with AD 1807.00, Control of Conditions Adverse to Quality.

Depending on the conditions identified; a MWO may-be generated to correct the condition. The department responsible for the resolution of the deviation shall forward it to Planning for initiation of a MWO.

6.2.7 The work request (WR) is the most frequently used method for identifying needed maintenance tasks. This document is used to record initial information about needed tasks, to record the approval of the task by supervisory personnel, and to input the task into the planning, scheduling, and implementation process.- The kB shall be used for identifying all tasks not identified by one of the processes discussed in 6.2.1 - 6.2.5. The1 originator of the WR shall generate the request as detailed in 6.2.7. In addition, the WR originator shall hang a Maintenance Information Tag (Enclosure 11) on the equipment addressed in the WR. The instructions included in Enclosure 11 shall be followed for tag completion and hanging. Either of two means may be used to generate the work request: 1) Use of a hard copy form (Enclosure 1) to record the required information and approvals; 2) Use the DBMMS to input the required information into a WR record. When this means is used by the Shift Supervisor, Planning shall consider the WR " approved" and process it accordingly. If the hardcopy means is used, the originator's supervisor shall review the request. He shall sign the request (Part 14) and forward it to Planning if he approves it. If he disapproves it, he shall return it to the originator. Upon supervisor approval, he shall forwa'rd the k1 to Planning. The Planning Staff SRO shall consult the operations coordinator as appropriate and assign the priority and schedule weight. A Planner shall then initiate a MWO for the work.

Work Request Instructions

~

The item numbers listed correspond to the circled numbers in the spaces on the WR (Enclosure 1). Those items I

AD 1844.02.0 Page 16 of 51 6.2.7 Work Request Instructions (continued) marked "*" must be completed for all work requests. The additional items should be completed to the best of.the Originators knowledge. They are used o develop the work plan and update equipment history files.

  • 1. The name of the failed component if the WR addresses an equipment failure.
2. The Architect / Engineer (A/E) equipment number of the failed coruponent. A listing of A/E component numbers is available from the Shift Supervisor's Administrative Assistant.
  • 3. The first and middle initials and the first four (4) letters of the last name of the individual originating the work request.
4. The Originator's phone extension number.
5. The section the Originator works in (i.e. Operations, etc.).
  • 6. The subsystem number of the failed component. A listing is available within the DBMMS or from the Planning Department.
  • 7. A check to indicate whether information tagging was required on the equipment.
  • 8. The time that the failure occurred or was discovered, using a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> clock format (i.e, 0000-2400 hours).
  • 9. The date of the failure, month /date/ year. (MM/DD/YY)
10. The least restrictive mode (1 though 6) of plant operations in which the maintenance can be performed.
  • 11. A summary description of the failure, limited to 25 characters.
  • 12. A detailed description of the failure or work to be performed. Include plant equipment number and name if no A/E # is available. Details such as estimated leak rate should be provided where possible (e.g. fills 5 gal.

bucket each shift).

13. The full name (signature) of the person preparing the work request and the date it is prepared.

I l

l., . _ . --- , . ,. ., --.

AD 1844.02.0 Page 17 of 51 6.2.7 (continued)

14. The name (signature) of the Section Supervisor who reviews and approves the work request, and the date of his review.

6.2.8 In Process MWO An existing MWO can also generate another MWO. When an existing MWO does not completely address all the mainte-nance needed or additional items are discovered during the course of the maintenance, a follow-up MWO will be generated to perform the identified items. The Maintenance Shop Foremen shall identify the need for follow-up MWO's to Planning staff personnel.

6.3 Maintenance Work Order Initiation 6,3.1 The initiation of a MWO will be from one of.the sources identified in Section 6.2. Maintenance Planners and Schedulers may also initiate MWO's with no documented task identification. They have the authority to initiate MWO's based on verbally related task requirements, or based on their own knowledge of the need for a task.

Individuals who are granted password access to the DBMMS are thereby granted this authority to initiate MWO's.

, 6.3.2 The currently printed MWO's and those printed previous to 8/5/85 on TED Form ED 6665-3, may be utilized as part.of a MWO Package to perform maintenance activities.

The new format for MWO's, TED Form ED 6665-4 shall be initiated for' all MWO's printed as of 8/5/85 and for the use of. a cover sheet for previously printed MWO's being issued for work.

-NOTE MWO's may be generated to replace old form (ED 6665-3) MWO's not currently being worked. After 1/01/86, the new MWO form (ED 6665-4) shall be used~

for all work.

6.3.3 The normal generation of the MWO shall be by utilization of the DBMMS and the applicable DBMMS instructions.

Planning personnel shall be responsible for the initiation of the MWO in the DBMMS. In cases of malfunctions of the DBMMS, the MWO form shall be manually generated. All entries to the~ MWO form shall be made in black ink with enough pressure to ensure readability in all the copies. The instructions listed below shall be

followed in completion of the listed portions (Block 1-3) l of the MWO. The icformation listed"for Block #1, Item 1, t

AD 1844.02.0 Page 18 of 51 6.3.3 (continued) 2 and 6 may be omitted if they are not available at the time the MWO is initiated. The Planner should add this information later as it becomes available.

A. Continuation Sheets Attached - Indicate whether or not continuation sheets are attached to the original MWO. This may be updated if the need arises after the MWO is generated, by the Planning personnel.

B. Sheet - Indicate the number of sheets with the MWO form, always Sheet 1 and continuation sheets numbered consecutively from 2. If Continuation Sheets are added during the processing of the MW0, this number shall be changed accordingly. The MWO Personnel / Equipment History form is not considered a continuation sheet.

Block #1

1. Area - A code number representing the area responsible for the work being accomplished and whose budget the maintenance work will be charged against. The codes are available in the DBMMS Code Data Base.
2. Functional Account Number - The budget account against which the expense of performing the maintenance work specified on the MWO will be charged. 'The Functional Account Numbers are assigned according to the subsystems as identified in the DBMMS, and are available in the DBMMS Code Data Base.
3. Subsystem - The plant subsystem code for the equipment requiring maintenance. This designation can be obtained from the DBMMS Code Data Base.
4. Maintenance Classifications - The maintenance work classification, either Q1, Q2, Q3, or NQ as per Davis-Besse's Q-list and the NQAM.
5. MWO Number - The MWO number is supplied by DBMMS, with the number dependent upon'the initiating document as entered by the MWO originator. .The number can also be provided in accordance with the DBMMS " fallback" instructions in the Maintenance Instructions. The MWO number format.is as follows:

T - YY-NNNN-RR T = Type, 1 through 3 l 1 = Corrective maintenance l

1

- - - - +wa

AD 1844.02.0 Page 19 of 51 6.3.3 5 (continued) 2 = Facility Change Request (FCR) MWO 3 = Preventative maintenance YY = Year (84, 85, etc.)

NNNN = Sequential MWO number (0001 through 9999)

RR = Revision number (00 through 99)

6. Preventative Maintenance (PM) Frequency - This space will be blank unless the MWO is type 3. The PM frequency shall depend on the "PM Type" as defined in AD 1844.01, " Preventative Maintenance".

Block #2 - Equipment Name & Number

1. Equipment / Instrument Name &' Number - The name of the equipment or component (s) that requires maintenance and the A/E number, if known. A listing of A/E numbers is available from the Shift Supervisor's Administrative Assistant.
2. Related PM - If the MWO is type 3, DBMMS will generate a 4-digit number (NNNN PM Base Record Number) of any related PMs in the data base and their scheduled date. If the related PM's MWO's have already been created, the entire MWO number (s) will be listed.

Block #3 - MWO Initiated By - the MWO Originator shall input:

1. Document type that initiated the MWO. The initiating document could be one of the following:

A= A work request (WR)

B= Another MWO C= Facility Change Request (FCR)

D= A Deviation Report (DVR)

E= A Nonconformance Report (NCR)

F= QC Surveillance Report G= Any TED employee who has the knowledge and capability to define a problem and actions to be taken to alleviate the problem utilizing.the DBMMS (see 6.3.1).

2. The Originators Name and Phone Number - The originator being the individual who created the document causing the initiation of the MWO.
3. The Failure Date and Time'- As defined in the Work:

Request form.

AD 1864.02.0 Page 20 of 51

4. The Drawing Number and Coordinates - The drawing number and coordinates from the DBMMS data base, if available.

6.4 Maintenance Work Plan Development 6.4.1 For corrective action maintenance the Planner shall perform appropriate walkdowns, review the P& ids, drawings, procedures and vendor manual (s), and identify corrective actions and necessary documentation for the task. The intent of this procedure is that the scope of a MWO shall not be changed once it was been approved.

Separate MWO's shall be developed for " troubleshooting" or " investigation" and corrective actions. He shall review the proposed work plan with Maintenance, Quality Engineering, Quality Control, Technical Support, and Operations personnel, as needed, to develop the plan.

6.4.2 The Planner shall determine the quality classification of the equipment and activities addressed in the MWO. He shall use Q List (Appendix B of the NQAM) as a "first resource" to make this determination. When the classificativa is not clearly defined in the Q List, he shall contact the Facility Engineering Department for assistance. The Facility Engineering Department shall provide the Planner with classification.

The Planner shall contact Facilities Engineering and they shall advise whether or not the equipment requires Environmental Qualification (EQ).

The Planner shall determine, with help as needed from the Fire Protection (FP) Coordinator, whether or not the equipment is Fire Protection System (FPS) equipment. If the equipment is FPS equipment, or if the work will affect FPS equipment, the FP Coordinator shall request an evaluation by Facility Engineering to determine the

" Operability" of the system during performance of the work.

The Planner shall determine which, if any, other codes, such as ASME, apply to the work addressed on the MWO.

They shall request assistance from Facility Engineering.

6.4.3 For tasks to be done in Radiation Controlled Access Areas (RACA), the Planner shall present the plan to Chemistry &

Health Physics (CHP) supervisory personnel for ALARA review and designation of Radiation Exposure Permit (REP) requirements. If a REP is required, the Planner shall initiate the REP and advise C&HP of when it will be needed. C&HP shall advise the Planner whether the REP will be ready when needed or if problems need resolution.

l

AD 1844.02.0 Page 21 of 51 6.4.4 The Planner shall determine those procedures which are required to perform the work. Maintenance procedures or

~

reference to vendor manuals which have been approved in accordance with AD 1805.00 are required for work on Q1 or Q2 equipment. If no procedures are required, i.e., the work may be done as " skill-of-the-craft" per AD 1844.00, the Planner shall indicate this in Block 4 on the MWO.

6.4.5 In addition to specifying those procedures or other approved instructions which are required to perform the work, the Planner shall also specify which major sections in the body of the procedure (s) are to be performed. A statement to this effect shall be entered in the MWO. If the procedure (s) or instructions are to be performed in their. entirety then the major sections to be performed need not be specified. iIf one section of the body of the procedure directs the reader to another section(s) of the procedure under certain conditions that may arise during the conduct of the work in the field then this other section(s) should also be listed on the MWO with the section number followed by "(as required)". If there is any uncertainty on the part of the Planner as to which major sections of a procedate(s) are to be performed.under a given MWO, then he shall obtain clarification from the Maintenance Department staff or shop foreman. Although an MWO may state that only certain sections in the body of a procedure (s) are to be performed, all other sections outside of the body of the procedure including PURPOSE, DEFINITIONS, FRECAUTIONS AND LIMITATIONS, PREREQUISITES, etc., still apply.

6.4.6 If required, the Planner shall initiate a Temporary Mechanical Modification Form per Procedure AD 1823.00.

6.4.7 The Planner shall determine whether review of the MWO by an individual who holds or has held a Davis-Besse Senior Reactor Operator (SRO)' license is required. For work on shop equipment or pre-fab work, such SRO review is not l

l l

t

AD 1844.02.0 Page 22 of 51 6.4.7 (continued) required. For all other MWO's, such SR0 review is required. If SRO review is not required, the Planner shall mark Block 23, SRO Review "N/A" and initial and date the entry, s

6.4.8 The Planner shall initiate any required weld travelers and burning permits. He shall ensure that they a're approved as required and provided for use with the MWO.

6.4.9 The Planner.shall determine the need for any confined space permits. He shall ensure that such permits are provided per AD 1844.10 for use with the MWO.

6.4.10 The Planner shall review the work plan with the Fire Protection Coordinator as needed to determine the need for any Special Instructions. The Fire Protection Coordinator shall prepare any required Special Instruc-tions for Fire Protection System operation. The Planner shall attach them to the MWO package.

6.4.11 The Planner shall ensure that any additier.a1 Special Instructions needed to perform the work are provided for use with the MWO. Examples of these include:

Rigging for overhead cranes Operation of overhead cranes, including the determined action of the ready-for-use status of cranes Operation of some lift equipment outside of the Station building, i.e. service vehicles for lighting and security surveillance equipment.

6.4.12 A MWO should usually address only one piece of equipment when:

1) The equipment is required to be operable by Technical Specification or the component supports the operation of such Tech. Spec. required equipment and,
2) The equipment will be rendered inoperable during some portion of the work or testing.

However, when work must be done which affects an entire train, up to fifteen (15) such items may be listed on the NWO. ' A train may be a piping or instrumentation loop, an

!~ electrical circuit, or a system for which a redundant t

train exists and may be kept operable. Each item of equipment shall be listed separately on a continuation sheet with provision made for a Shift Supervisor release l

l I

l

AD 1844.02.0 Page 23 of 51 6.4.12 (continued) sign-off for each item. Adequate enclosure 13's (as many as one enclosure for each item) shall be prepared to control the release of each item or group of items.

6.4.13 A WO may address up to 15 pieces of equipment when:

1. The equipment is required to be operable by.

Technical Specifications or is required to support such equipment, and;

2. The equipment will not need to be declared inoperable during any portion of the work or testing, and
3. The items of equipment are all in the same sub:ystem.

In this case,-at each item shall be listed on a continua-tion sheet with a space for the Shift Supervisor to sign off his release of the equipment for work.

6.4.14 -The Planner shall check the Nuclear Plant Reliability '

System (NPRDS) data base and determine whether the equip-ment addressed by the WO is contained in that data base.

If so, the Block 27 space for indicating "NPRDS Reportable" shall be checked. He shall initiate required NPRDS forms (Enclosure 5) in accordance with instructions presented in Enclosure 6.

6.4.15 The Planner shall review the information stored in the DB&MS for the equipment affected by th2 Wo.

1. If the equipment review code for the component is 1

" Cleanup", the Planner shall review all of the equipment information for accuracy and completeness.

If the Planner judges that no corrections or additions are needed, no further action is required regarding the information in the database. If corrections or additions are needed, the Planner shall initiate an " Equipment Entry / Update Information" form, Enclosure 14, as detailed in 6.4.15.3 below.

2. If the Planner is aware of duplicate information listings for a component they shall initiate an

" Equipment Entry / Update Information" form, Enclosure 14, to eliminate the duplication. In this case, the Planner shall initiate a form, placing the correct equipment number in the " Equipment Number" space and the number shown for the duplicate file in the " Existing DBEMS Number" space. The Planner

~ shall submit such forms as detailed in 6.4.15.5 and 7

6.4.15.6 below.

1 i

AD 1844.02.0 Page 24 of 51 6.4.15 (continued)

3. If the review code for the component is anything other than " Cleanup", the Planner shall verify the following information fields from the sources listed:

Item Source / Reference Equip. No. P&ID Drawing Existing DBMMS No. Existing Data on system Subsystem No. DBMMS Subsystem List P&ID and Coord. No. P&ID Dwg. or Elec. Schematic Post Maint. Test Test and Procedure Index Quality Related Classification as defined in this procedure Equipment Type DBMMS Code List Function Number DBMMS List The Planner shall then complete an " Equipment Entry

/ Update Information" form, Enclosure 14, for the component. He should correct any incorrect informa-tion present in the database and add as much additional information as possible. The Planner shall then process the form per steps 5. and 6.

below.

4. If no information listing for the component is found in the database, the Planner shall initiate an

" Equipment Entry / Update Information" form, Enclosure 14. Prior to doing so , the Planner should check the database thoroughly, determining whether or not the cquipment is listed under some similar number which includes leading zeroes. For example, "RC75" might be listed as "RC0075". In completing the form, the Planner should refer to the DBMMS User's Manual for instructions. The Planner should also initiate Nameplate Data Sheets for component as detailed in the User's Manual.

5. The Planner shall obtain their supervisor's approval on the completed " Equipment Entry / Update Informa-tion" form.
6. The Planner shall submit the approved form and any associated Nameplate Data Sheets to the DBMMS Database Supervisor.

AD 1844.02.0 Page 25 of 51-6.4.15 (continued)

7. The DBMMS Database Supervisor shall ensure that the information provided is entered into the system per the requirements of the DBMMS Manual.
8. Prior to hardcopy printout of the MWO, the Planner shall verify that the record code for the equipment information in the database is " Cleanup". If it is not, the Planner shall contact the DBMMS Database Supervisor to accomplish the needed input.

6.4.16 The Planner shall then fill out the necessary information in Blocks 4 through Block 7 of the NWO form as follows:

Block 4 - Work to be Performed

1. Description of Problem / Malfunction / Work to be Performed - The information may be copied from

, the initiating document. This entry will describe l

the problem / malfunction and the direction or actions I to be taken to correct the described problems / malfunctions.

NOTE If the work is immediate action work, the works "Immediate Action Maintenance" shall be prominently entered.

This entry should include any special precautions required to protect the affected systems or-equipment, and any testing to be conducted while performing the maintenance work.

Block 5 - Equipment Classification -

1. Q1, Q2, Q3 or NQ.
2. Other - Up to two other classifications such as ASME/ FPS /B31.1 Codes.

2A. Fire Protection System (FPS) - Equipment-being removed from service or being modified, which will require special instructions from the Fire Protection Coordinator. For this equipment, the Fire Protection Coordinator shall request an evaluation by Facility Engineering to determine the "0PERABILITY" of the system during performance of the work.

3. Environmental Qualification - The environmental qualification evaluation of the equipment to be I

AD 1844.02.0 Page 26 of 51 6.4.16 3- (continued) worked on. The environmental qualification classification codes are either:

EQ - Equipment Environmentally Qualified NONEQ - Equipment NOT environmentally qualified Block 6 - A check to indicate whether the maintenance work will render any Technical Specification equipment or Technical Specification Support equipment inoperable.

If "Yes", the Planner shall identify redundant equipment, if existing, and prepare a Tech. Spec.

Equipment Operability Checkoff List Form (Enclosure 13).

Block 7 - Inspections and Enclosures Required: The need for the following procedures or permits shall be indicated on the MWO:

1. Cleanliness: A special cleanliness inspection, if required per AD 1844.05, Cleanliness Control.
2. Radiation Exposure Permits (REP) Required - All work to be done in Radiation Access Control Areas (RACA) will require an REP. All special REPS utilized for a particular MWO shall be entered in the block provided on the MWO - Personnel / Equipment History Form by the personnel performing the maintenance.
3. Enclosure 13 - A Tech. Spec. Equipment Operability Checkoff List, if required.
4. Enclosure 4 (from Procedure AD 1845.03) - A FCR/MWO Verification Checklist Form shall be filled out for all MWO's that are initiated for modification work (FCRs) per AD 1845.00.
5. Tagging List - A checkoff in this box will indicate that a tagging list is required per AD 1803.00, Safety Tagging.
6. Temporary Mechanical Modifications ~ A checkof f will indicate that a temporary Mechanical Modification Form is required per AD 1823.

, 7. Jumpers & Lifted Wires - A checkoff will indicate a l need for Jumpers and/or Lifted Wires when performing the work per AD 1823.00

AD 1844.02.0 r ge 27 of 51 i

6.4.16 (continued)  :

8. Weld Travelers and Burning Permits - A checkoff to indicate when these are required to perform the work.
9. Confined Space Permit - A check indicates that a permit is required per AD 1844.10, Safe Work Procedure for Confined Spaces.
10. Special Instructions - A checkoff to indicate that special instructions are required because the work affects the Fire Protection System as indicated in Block 5, Section 2A. A check here.may also be used by the MWO originator to indicate additional specific requirements such as:

Rigging for overhead cranes ,

Operation of overhead cranes, including the '

determined action of the ready-for-use status of cranes Operation of some lift equipment outside of the Station building, i.e. service vehicles for lighting and security si.rveillance equipment.

Block 9 - Procedure Instructions - Up to five (5) proce-i dures or approved vendor manuals with Revision Numbers shall be entered by the MWO originator to provide the i required guidance for the work.

l An entry of N/A shall be made if no procedure or vendor manual is required for the MWO. This will also indicate that the work is considered " skill of the craft."

, Block 10 4

1. MWO Created By -

The name of the individual who created the MWO: for Corrective Maintenance it is the Planner; for Preventative Maintenance it is by the PM Specialist i and will be entered as " System Generated". This is printed automatically on MWO's generated using the DBMMS PM-MWO Generation Feature.

2. Cognizant Individual Acknowledgement -

i The signature of the cognizant individual (usually the Planner) or another Planning or Maintenance l Staff member who will sign in his absence, i

AD 1844.02.0 Page 28 of 51 6.5 Parts / Materials /Special Equipment Procurement for Maintenance Work 6.5.1 When parts, materials or special equipment will be required to perform the task, the Planner shall check "yes" in Block 8 of the MWO. Otherwise, he shall check "no" in Block 8. If "yes", he shall. initiate either Bills of Material (BOM) or Material' Issue Tickets and ,

forward them to procurement. He shall enter the BOM number (s) on the MWO when BOM's are used. The Planner shall determine the approximate time required to procure / issue the needed items. The Procurement Department shall procure and/or issue the items needed.

They shall also advise the Planner of the approximat.e time which will be required to have the parts or

-materials issued for use.

i

'6.5.2 If the parts / materials /special equipment will not be available for use in a short time (approximately one week), the Planner may place the MWO on' hold. He will update the MWO status to "H-Parts" and send the MWO to Document Control. When the needed items are received, the Procurement Department shall notify the Planner. He shall then retrieve the MWO from Document Control and j proceed with the scheduling / priority review per 6.6.

l 6.6 MWO Scheduling / Priority Reviews 6.6.1 The Planner shall work with an individual who holds or has held a DB-SR0 license (usually the Planning Staff SRO) to assign a priority and schedule weighting factor to the task. The SRO shall discuss the task with the Operations Coordinator or Shift Supervisor as he deems appropriate in assigning task priority. The instructions included in Enclosure 9, Priority Assignment Instructions shall be applied by Operations and Planning personnel for the priority Assignment. The Planner shall advise the Outage Manager when a task is determined to be Priority 4, outage work. If a priority was assigned to the task when the WR was prepared, that priority may be used.

6.6.2 The Planner, staf f SRO and Operations Coordinator (where needed) shall also determine the following status information and document it on the MWO:

a. Mode Required to Work The least restrictive plant mode in which mainten-ance work can be performed, as per Operations instruction. Mode 1 is the least restrictive, Mode 2 is the next least restrictive, Mode 3 is the i next least restrictive, etc.

7-I AD 1844.02.0 Page 29 of 51

6.6.2 (continued)
b. Restraint to Mode i

i 1

Indicates restraints to start-up after the maintenance is done.

c. Outaae '

{ Indicates a system or plant outage and the type of

< outage required'to conduct the maintenance work.

6.6.3 ' After development of the work plan for a task, the '

Planning Supervisor shall review the MWO for accuracy and ,

l completeness of the work plan information. He shall-

resolve any discrepancies with the Planner.

i' 6.6.4 After'his review, the Planning Supervisor shall sign the

, " Maintenance Superintendent Approval" space in Block 10 t of the s

MWO to indicate his approval.

He shall then return the MWO to the Planner for QC review per l 6.7.

1

j. The Planning Supervisor may delegate, in writing, the j authority for this approval signature to another individual based on his evaluation of the individual's j experience, and technical and management skills. He-j shall not, however, delegate this authority to~the MWO
originator.
During off-normal hours, the signature may be that of any

] Planning or maintenance staff individual. He shall make

! any contacts necessary to ensure that the MWO is

! acceptable if his personal knowledge of the work is j inadequate for that evaluation.

i 6.7 MWO Review by QC

(

1 i 6.7.1 The Planner shall determine ~ whether or not the MWO l requires a QC review. The following MWO's require QC j and/or Code Inspector review:

1. MWO's classified Q1, Q2, or Q3 i 2. MWO's classified ASME Code

'3. MWO's classified ANSI B31.1 Code

} 4. MWO's. classified Fire Protection System

5. MWO's initiated from NCR's j 6.- MWO's initiated from Surveillance Reports i The Maintenance. Department or Planning personnel may also i request QC's review of the NWO and involvement in the h

l i t

AD 1844.02.0 Page 30 of 51 6.7.1 (continued) task when they judge it to be appropriate based on the complexity of the task. If QC/ Code Inspector review is not required or requested, the Planner shall mark N/A, initial, and date the QC/ Code Inspection block, and forward the WO to the DCG for filing and status update.

6.7.2 If QC/ Code Inspection is required, the DCG shall forward the WO to the QC Supervisor and/or Code Inspectc,r for review. The QC Supervisor shall designate a reviewer.

The QC Reviewer or Code Inspector shall review the WO and complete the following sections in Block 11 of the WO . They may also attach a QC verification sheet to the WO . The QC Reviewer / Code Inspector shall forward the WO to Planning after their review is complete. ,

Reviewed by QC/ Code Inspection - Signature of the QC/ Code Reviewer and the date.

Designated Inspector - The QC Reviewer shall enter the name of the QC Inspector, or the discipline, that will perferm the required inspection of the WO, if needed, or N/A if no inspection is required.

Min. Level - If inspection is required, the QC Reviewer shall designate the minimum qualifications of the inspector for the WO.

Special QC/ Code Inspection Instructions The QC/ Code Reviewer shall enter any special instructions required during the performance of the WO. The instruc-tions will inform maintenance when to contact the designated inspector for inspection (if required) or an N/A is if not required; or hold / witness points (by the use of witness / hold arrow stamps, stamped in the WO).

NOTE If Block 11 (Reviewed by QC/ Code Inspector) is marked N/A by the WO originator, he/she shall also check N/A in Block 20 and "no" in Block 21 and N/A in 25. If N/A is entered in 11, 20 and 25, 21 shall be checked "no".

6.8 WO Review by SRO 6.8.1 Upon receipt, Document Control shall remove the blue copy of the WO and send it to Planning.

/

AD 1844.02.0 Page 31 of 51 6.8.1 (continued)

If SRO review is required, the Planner shall direct the DCG to forward the MWO package to the SRO for review.

The Planner shall do this so as to allow time for SRO review prior to the scheduled start of the task, but 3

limiting the time between the review and the work performance to approximately one week.

6.8.2 If Block 23 has not been marked "N/A," the MWO shall be

, reviewed by an individual who holds or has held a Senior Reactor Operator License at the Davis-Besse Nuclear Power Station.- He shall initial and date Block 23 to document his review. The SRO review shall include consideration

, of each aspect of the work plan developed and specified 1 on the MWO. The SRO shall specifically consider the 1

I impact of the work on the operability of all station equipment required by the Technical Specification. When the work plan involves removing of several components in one train from service, he shall ensure that.the remaining train's operability will not be prevented. He shall resolve any discrepancies with the Planner. This review shall ensure that all post-maintenance testing of safety- related components demonstrates that the 1

equipment is capable of performing its safety function (s) j i

(OPERABILITY, per Technical Specification 1.5 definitions) upon completion of his review the reviewer shall initial Block 23 indicating concurrence with the testing requirements. After this review, the SRO shall return the MWO package to Document Control.

6.8.3 After SR0 review, Document Control shall review the MWO

package for completeness. The DCG shall check the status i

of the MWO at this time. They shall attach current revi-sions (and applicable temporary modifications) of the required procedures to the MWO.

l 6.9 Maintenance Department MWO Processing.

6.9.1 The Planner shall direct the DCG to send the NWO package to the Maintenance Dept. He should do this in a timely manner; allowing time for Maintenance to review the MWO and prepare to do the work, but limiting the time the NWO will be held by Maintenance before work begins to a short period -'usually no more than 2-3 days.

6.9.2 Upon receipt of the approved MWO from the DCG the Mainte-i nance Coordinator shall route it to the appropriate Lead 1

Shop Foreman.

J 1

e

, - - - . , , , , ,, - - , - - , . - - ~ - - - , . . - - - , . - - - - - - - , - - -v,--,-~--.e, , - ~ - - - - . ~ - . , , ,

AD 1844.02.0 4

Page 32 of 51

, 6.9.3 The foreman of the lead shop shall sign the " Received In Shop Space" in Block 12 when he receives the MWO. He shall advise _any other shops involved and forward the yellow copy of the NWO to Planning after required acknowledgements of Block 13 are obtained.

6.9.4 For FCR MWO's not performed by shop personnel, this block may be signed after Block 14 (Permission to Commence Work) if a Modification Coordinator obtains permission to perform work prior to delivering the MWO to the work group. ,

6.10 MWO Implementation 6.10.1 Shift Supervisor / Foreman Release to Proceed i

i 1. The foreman or supervisor authorizing the perfor-

{ mance of the work shall sign and date Block 14 when 1

the work is' ready to be performed.

For work that does not.have any effect on plant systems or operations, such as work on shop

equipment or prefab work, the shop foreman shall

. sign this block or obtain the Shift Supervisors

! sign-off in this block.

For all other MWO's, the signature of the Shift Supervisor is required in order to begin the mainte-nance. This signature indicates the equipment is i

properly aligned for the maintenance, tags are

. properly placed, and plant conditions permit the work. If an Enclosure 13 is required with the MWO the " Pre-Maintenance" portion of the Enclosure 13 shall be completed prior to this signature being

. entered.

! The Shift Supervisor may authorize the work activity

. prior to the hanging of the Jumper, Lifted Wire,_or I-Temporary Mechanical Modification Tags. Electrical Jumper, Lifted Wire or Temporary Mechanical Modification Tags may be issued after-the work activity has begun. This will enable the individual performing the work activity to determine which tags will be required to perform the Maintenance Activity. NO wires may be lifted, Electrical Jumpers or Temporary Mechanical Modifications installed until the provisions of AD 1823.00,

" Jumper Lifted Wire Control Procedure", have been met.

I

1 AD 1844.02.0 Page 33 of 51

'6.10.1 (continued) <

2. For those MWO's signed by the Shift Supervisor, he will remove the green copy and retain it in his file to maintain a status of maintenance on plant systems and equipment. For those with the shop foreman's
signature, he will remove the green copy and forward l

it to DCG.

3. The Shift Supervisor Administrative Assistant shall status DBMMS for the MWO when this block is signed by the Shift Supervisor.
4. The individual that signs Block 14 (Permission to Commence work) may use this block to give special 4

instructions concerning the maintenance to be done.

It may be used to reduce the work scope from that described in Block 4 (Work to be Performed).

5. If permission has been withdrawn by lining out the signature in Block 14, it may be restored by signing and dating again in Block 14 if the conditions that warranted the withdrawal have been corrected. This may be done once for a given MWO as conditions warrant as long as the Shift Supervisor is confident

. of the equipment status and that the control'has

! been adequate. If permission to recommence work is given, permission may not be withdrawn and given again. .Instead, a follow-up revision of the MWO should be issued and the current MWO closed. The follow-up MWO should be listed on the MWO being closed.

6. The Release to Proceed shall be documented for each j item or subsystem addressed by the MWO. NWO continuation pages shall be used to list each item and the release signatures corresponding to each 1

item (see 6.4.12 and 6.4.13).

7. When the Shift Supervisor elects not to grant permis-sion to proceed with a task, he shall advise the

, Planning Supervisor of his action. They shall resolve whatever problem is preventing the release and reschedule the work as needed. They shall refer issues which they cannot agree upon to the Operations

, Superintendent for final resolution.

j i

I

AD 1844.02.0 Page 34 of 51 6.10.2 Performance / Completion of Work After permission has been granted to commence, the

Maintenance Shop Personnel shall perform the task.

Problems which arise during work performance shall be 1

resolved as detailed in 6.10.3 of this procedure. The documentation listed in Paragraph 6.10.2.3 shall be completed as the work is performed:

1. The Maintenance Foreman supervising the work shall prepare any required tagging lists per AD 1803.00, Safety Tagging Procedure. He shall ensure that tagging is approved by the Shift Supervisor and that tagging is accomplished.
2. The Maintenance Foreman shall obtain approvals on special permits, e.g. confined space work permit, as needed to comply with applicable plant procedures.
3. The Maintenance personnel performing the work or the Shop Foreman shall complete the following items on the MWO - Personnel / Equipment History Form (Enclosure 4). i
1) An evaluation as to the cause of the failure of a piece of equipment to perform its required function. This will aid the cognizant individual in the reporting requirements to NPRDS if indeed the failure is a reportable occurrence. Where no failure was involved (e.g., preventive maintenance), thir section i

shall be marked "N/A."

l 1 2) Description of work performed - A detailed description of the work performed shall be l entered by the individual who performed the work. This should include information about the failure mode if Block 4 (Work to be Performed) was not accurate or detailed enough, the completeness of the work or whether a

follow-up MWO is required or suggested. If punch list items are worked in order to finish the MWO, they should be specifically identified i

as such.

3) Continuation sheets added - An entry shall be
made by the individual filling out the descrip-tion of work performed or his supervisor as l

appropriate.

I

_ , - . _ ~_ _ _ _

AD 1844.02.0 m

Page 35 of 51 6.10.2 (continued)

4) Personnel Record - All individuals who expended time to perform the work indicated by the NWO should put their name, date of work performance and craft'on the form.

The name should be in the form of first initial of first and second (middle) name and entire last name.

The individual in charge of the work or his supervisor shall ensure that all personnel, including support groups, who have worked under the MWO have their name and craft entered and they have logged the hours they worked on the equipment.

5) REPS Issued - The individual who performed work shall enter the numbers of any special REPS that were used to conduct the work.
6) Test Equipment ID No. and Calibration Duc uate

- For work that requires calibrated tools and

~

j test equipment, their identification numbers and due dates for. calibration (which shall be after the date the work was performed) shall be

! entered by the individual who used the equipment.

7) Material / Vendor Part Used - The individual who performed the work shall enter all parts that were used in performing the maintenance, how many of each part, and the stock code number of the part used, if applicable, for equipment history. Materials, such as lubricants and packings, which remain in the equipment or system shall also be listed. For all Q-1, Q-2 and Q-3 MWO's the purchase order number utilized to obtain the parts shall also be i

recorded here for traceability. All parts i

listed for Q-1, Q-2 and Q-3 work shall have a "Q" , "F", or "A" purchase order number recorded as appropriate. If applicable the heat or serial number of the parts shall also be recorded.

MIT's or Q-tags should be attached to the MWO.

4. If Cleanliness Verification was required, Chemistry and Health Physics personnel shall complete the applicable C&HP Section Cleaning Log Sheet, per IP 8003.00, Plant Systems Cleanliness Inspection.

The maintenance foreman shall attach the log sheet to the MWO.

I

. - - . , _ , . . - . _ . ~ - - , - - - - . - - . w-----, .-_ - , , -- , _ . _ _ s-

AD 1844.02.0 Page 36 of 51 6.10.2 (continued)

5. The lead shop foreman / supervisor shall ensure that the support groups indicated in Block 13 and 16 have completed their respective signoffs their portion of the work. Support group personnel shall initial or signoff in Block 16 and ensure that craft have entered their names and hours on the MWO -

Personnel / Equipment History Form.

6. Work Complete - The signature of the individual who actually performed the maintenance, or his foreman, shall be entered in this block and dated, after all the required information has been entered on the MWO

- Personnel / Equipment History Form (Enclosure 4).

After Block 15 is signed,-the pink copy of the MWO is forwarded to the DCG indicating the work has been completed and the MWO status will be updated on DBMMS.

7. When the completion signoffs are complete, safety tags shall be removed from the equipment. This shall be done as follows:
1) Operations Department personnel shall remove the tags that were hung for the performance of the work listed on the MWO and return them to the Davis-Besse Tagging Supervisor (DBTS).

They shall also remove any attached safety tag which will be forwarded to the Shift Supervisor with the MWO, in accordance with AD 1803.00, Safety Tagging Procedure, and AD 1823.00, Jumper and Lif ted Wire Log. Then they shall sign and date Block 17, Tags Removed By.

, 2) If a tagging list exists with the MWO for support shop groups identified in Block 16 (Support Group Signoff), those tags shall be removed and returned to the DBTS also, and the individual who cleared them shall initial this block. If no support shop tagging list exists a foreman from each support shop listed shall initial Block 17 prior to the lead shop tag removal signoff.

3) If no tagging list was required, the foreman shall mark Block 17 "N/A," sign and date it.

, - , , , . , _- --.---~.-m.,--- -----,~.m- - - - -- --- nn - + - , , - - - - - - - - - - - ~

l AD 1844.02.0 Page 37 of 51 6.10.2 (continued)

8. Those individuals who performed the maintenance shall ensure that the housekeeping at the jobsite is adequate, in accordance with AD 1835.00, Plant Cleanliness Inspection Program, and sign the Housekeeping Acceptable Plock, Block 18.
9. In very rare and unusual cases, the housekeeping requirements may exceed that normally expected to be performed by the responsible individuals. For those cases, the block will be signed and words entered to "see follow-up MWO' and a follow-up MWO will be generated and identified in Block 27, (Action Items).
10. During the performance of the werk directed on the MWO orange "Information" tags shall be used as follows:

Scaffolding, temporary compressed air manifolds, etc. which are established shall be tagged to identify the MWO which required them.

Parts which are distributed from the warehouse prior to their immediate use shall be tagged to identify the MWO which directs the use of the parts.

Parts of components and equipment which have been disassembled shall be tagged to establish the identity of their parent component or equipment and the MWO which directed their disassembly.

11. The maintenance personnel performinE the work shall remove any Information Tags from the equipment when the work is complete. The tags shall be kept with the MWO package for the Shift Supervisors' review.

6.10.3 Problem Resolution

1. For HWO's requiring the signature of the Shift Supervisor in Block 14 (Permission to Commence Work), if problems arise before the work actually commences, the shop personnel assigned to perform the maintenance shall notify the shop foreman of the problems.

The Maintenance Coordinator shall work with the Planner, Maintenance staff and shop foremen as necessary to resolve the problem. Several al-ternatives may result: 1) work may continue; 2) the C

AD 1844.02.0 Page 38 of 51 6.10.3 1~ (continued)

MWO may be/ revised or amended; 3) a new MWO may be generate ; 4) the work (and MWO) may be placed on

" hold" 5) the MWO may be " voided."

F f- MWO's which are to be placed on " hold" the

/ Maintenance Coordinator shall advise the Shift

./ Supervisor of the need for the " hold." If he concurs, the Shift Supervisor shall "line out" his signa)ere granting permission to proceed on the MWO,

- and 4emove the green copy of the MWO from his file.

7' The Maintenance Coordinator shall then status the work " hold" and return the MWO to the DCG for filing.

For a MWO that is to be voided, " void" shall be written in Block 15 (Work Complete) and the reasons for voiding the MWO shall be entered in the

" Description of Work Performed" block on the NWO-Personnel / Equipment History Form, including the fact that'no work was.Mone. The Planner shall sign Block 28 (Cognizant Individual Approval) and obtain the required Block 29 Planning Supervisor's signature. Block 15 through 29 will be processed as I 11 the MWO were being closed out. The coordinator j shall forward the MWO to the Document Control Group for the closeout.

Document Control Group shall route the MWO to those individuals who had signed for acknowledgement or approval. Those notified individuals shall initial their appropriate blocks acknowledging that the MWO is voided.

NOTE If an MWO is voided, the attachments and enclosures prepared for the MWO are also void and need not be retained, no stamps or signatures are required for them.

2. For a NWO not requiring the signature of the Shop Foreman in Block 14 (Permission to Commence work),

3 If problems arise before the work begins, the l individual performing the work shall notify the Shop Foreman of the problem (s).

\

AD 1844.02.0 Page 39 of 51

-6.10.3 (continued)

The Shop Foreman shall contact the Planning and Maintenance Coordinator and advise him of the problem (s).

The Maintenance Coordinator shall initiate a status change on the MWO; and a " hold" will be placed on the MWO and the MWO will be filed with the Document Control Group.

The Maintenance Coordinator and the Shop Foreman will resolve the problem (s) before the work on the MWO will continue. If th'e MWO is to be voided, it will be handled in the same manner as that mentioned in 6.10.3.1.

6.10.4 Suspension of Work Work which has begun but cannot be completed promptly may be suspended by completing an MWO SUSPENSION FORM, Enclo-sure 3. Work on equipment required by Technical Specifications may not be suspended without the approval of the Shift Supervisor. Suspension of maintenance work should be used primarily to return equipment to service

, prior to completion of all of the work listed on a MWO.

(See 6.10.5) Work should not be suspended if the delay will be less than one week and the equipment is not needed immediately for plant operations. The MWO will be suspended as follows:

1. The responsible shop individual, the Planner /

Scheduler or the Document Control Group will initiate the MWO SUSPENSION FORM, indicating his name, the MWO number, why the NW) should be suspended, and whether or not it is Q1 or Q2 or required a QC or Code Inspection review according to

Block 11 on the MWO.
2. A detailed explanation of any work performed on the equipment is entered in the " Description of Work Performed" section of the MWO - Personnel / Equipment History Form.
3. The QC or Code Inspector performs an inspection of the work which has been completed, verifies applicable NCRs have been closed or dispositioned "use as is", enters his comments on the status of the work and equipment, and signs for the satis-factory completion of that portion of work on the NWO SUSPENSION FORM if the MWO is Q1 or Q2 or required QC/ Code Inspection.
4. A Shift Supervisor ensures that any required testing is completed and witnessed by QC and/or a Code Inspector if necessary, enters his comments i

AD 1844.02.0 Page 45 of 51 6.10.4 4 (continued) regarding the test and the equipment / system status,

identifies the equipment / system as operable or inoperable, crosses out the signature in Block 14, and initials the cross out.
5. A copy of the MWO SUSPENSION FORM will be attached to the green copy of the MWO which will be placed in the suspended file, and the original of the MWO SUSPENSION FORM will be attached to the white copy of the MWO which will be returned to DCG until the

. MWO can be rescheduled for completion.

6. Unit Log entries will be made for any testing that was performed, indicating that a system was declared operable after suspending an MWO for that system that was Q1 or Q2 or required QC or Code Inspection if that was the case. (See Section 2.15 of this Enclosure (5).)
7. If practical, the Shift Supervisor will contact the Operations Superintendent or Operations Supervisor prior to suspending an MWO.
8. When the work may be resumed the responsible planner shall complete the MWO SUSPENSION FORM and present it for Shift Supervisor approval. Upon approval, the Planner shall initiate a status change for the MWO end direct the DCG to redistribute the MWO to maintenance for work.
1) Maintenance Work Orders that have been suspended may be given permission to "re-commence work" only once.

A Maintenance Work Order may not be "RE-SUSPENDED". If problems develop with a MWO that was given permission to "re-commence work", it shall not be suspended, it shall be o closed after a follow-up MWO is generated l

addressing the problem.

2) A determination may be made that a " Suspended" MWO is.to be closed out with no further. work being performed. Blocks 15 through 25 shall be s completed in the normal closeout process. The t

MWO is then presented to a Shift Supervisor for his signature. A Shift Supervisor signature in Block 26 infers his approval for Block 14 but s the intent is to closecut the MWO.

l

\

.y <

I

AD 1844.02.0 Page 41 of 51 6.10.4 (continued)

9. Suspension of MWO's for FCRs shall be done in accor-dance with these instructions and those provided in AD 1845.00 Series, Changes, Tests and Experiments.
10. If no work has been performed on a MWO the Shift Supervisor may withdraw permission to do the work by lining out the signature in Block 14, and the MWO may be rescheduled when appropriate. If work has taken place, the MWO shall be suspended per 6.10.4 rather than withdrawing permission if the work will not be continued at that time.

If permission has been withdrawn on a MWO for which i no work was performed and the MWO is to be voided, the actions of Section 6.10.3.1 shall be followed.

6.10.5 The Shift Supervisor has the authority to restore equipment to service with open MWO's based on his judgement. If the equipment is not Tech Spec related, it may be used as long as there is no danger to the equipment or personnel during the maintenance. If the equipment is Tech Spec related, it shall be evaluated for operability and either tested and declared operable'per normal procedures, or placed in service but noted in the Shift Supervisor's log as being inoperable. No equipment shall be declared operable until the NCRs on that equipment are closed or dispositioned "use as is". Any Tech Spec action statements that relate to inoperable equipment shall still apply, 6.11 Review of Completed Work (Maintenance Foreman and QC) s x

6.11.1 If QC involvement is not required for the task, the MWO shall be reviewed by the responsible foreman as follows:

1. After the work has been completed, tags removed and the housekeeping verified, the shop foreman or Modification Coordinator shall sign Bock 19.

Support shop foremen from Block 16 shall initial or sign Block 16 for their activities.

2. Prior to signing Block 19 the foreman / coordinator shall verify that the description of work performed is adequate, all required attachments are filled out properly and attached, and necessary signatures are on the MWO. He shall assure that any required NPRDS forms (Enclosure 5) have been completed per Enclo-sure 6.

1

AD 1844.02.0 Page 42 of 51 6.11.1 (continued)

3. .For those MWO's with Block 15 signed by the shop foreman, the MWO will be forwarded to the Document Control Group for closcout after Block 19 is signed, and "N/A" has been entered in Block 26 (Shift Supervisor).
4. Afcer the signature and date are entered in Block 17 the goldenrod copy of the MWO shall be forwarded to-the DCG for statusing.
5. The shop foreman may a'dd testing or special instruc-tions to Block 22 (Testing to be Performed) when he signs Block 17.
6. The Lead Shop Foreman shall forward the MWO to the Document Control Group after Block 15 thorugh 17 are signed. Document Control will then coordinate the MWO closeout.
7. For those MWO's with Block 14 (Permission to Cor.;rcuce Work) signed by the Shift Supervisor, DCG shall forward the MWO to the Shift Supervisor for his " Return to Service" approval after-Block 17 is signed.

6.11.2 For work which required QC involvement, the review of the MWO shall be as follows:

1. Prior to signing Block 19 the foreman or Modifica-tion Coordinator shall verify that the description of work performed is adequate, all required attachments are filled out properly and attached and necessary signatures are on the MWO. He shall assure that any required NPRDS forms (Enclosure 5) have been completed per Enclosure 6. He shall also verify that QC requirements have been met concerning the perforiaance. of the work.
2. After the work has been completed, tags removed (Block 17) and the housekeeping verified Block 18, the shop foreman or Modification Coordinator shall sign Block 19, responsible foreman / individual.

Support shop foreman from Block 16 shall initial or sign Block 16 for their activities.

3. The responsible foreman shall route the MWO to The Document Control Group for their review of all docu-mentation associated with the MWO. Modification Coordinators shall route FCR MWO's to the Document Control Group who will insert all associated docu-ments, attachments and travelers. The Document

AD 1844.02.0 Page 43 of 51 6.11.2 3 (continued)

Control Group will route the MWO package to QC for their review of all documentation associated with the MWO.

4. A QC Reviewer shall verify that the work is complete, MWO - Personnel / Equipment History Form is filled out and Blocks 15 through 19 are signed or initialed. For MW0's which involved a Code Inspector, the Ccde Inspector shall review the MWO package for compliance with applicable codes and procedures. QC shall then sign and date , Block 20 upon completion of all work and a satisfactory review of all documentation associated with the MWO has been performed. The designated Inspector, or the Inspector who followed the work if the designated Inspector was not available, shall sign this block for acceptance of the completed work.
5. Inspectors shall not sign this block until any NCRs or Surveillance Reports affecting the work performance is : satisfactorily dispositioned.

If a NCR is written against the performance of the work this shall be indicated by checkoff in the NCR written, "yes" block and the number of the NCR entered by QC personnel in Block 25.

Satisfactory disposition of any NCR shall be indicated in Block 27 in the appropriate checkoff.

This checkoff will be performed by the cognizant individual.

Note Completed NCR's are defined as a NCR's which:

a. Are closed and satisfactorily signed off with the appropriate signatures;
b. Are dispositioned "use as is" and do not affect a safety function; or
c. A safety evaluation, performed by cognizant engineering personnel, has determined that the equipment will perform its safety function when returned to service with follow up maintenance.to be performed.

r I

AD 1844.02.0 Page 44 of 51 6.11.2 5 (continued)

If a NCR was not written the appropriate checkoffs will be made in Blocks 25~and. Block 27.

6. If parts of the work are not satisfactory, they may be reworked under the same MWO as punch list items on a continuation sheet, or covered by a follow-up MWO as agreed upon by the Inspector and appropriate maintenance supervisor. QC must be notified prior to any work.
7. If not previously done, the designated Inspector shall check Block 21 indicating whether or not he wants to monitor any testing listed in Block 22 (Testing to be Performed), prior to signing Block 20.
8. If no QC or Code Inspection is required, Block 20 shall have a "N/A" entry by the Shop Foreman if not previously done.
9. After their review, QC shall forvaid the MWO to the DCG.

6.12 Post Maintenance Testing 6.12.1 Test Requirement Verification The Planner or Modification Coordinator shall route the MWO to the appropriate individuals to allow for the following verific.tions of testing requirements.

1. Upon satisfactory completion of the work and the signoff by QC in Block 20 the designated in-spector(s) shall check, if not previously done, whether or not he/they want to monitor any testing indicated in Block 22.
2. If previously an indication was made that an inspec-tion was to be made and QC makes a determination that an inspection will not be required, the QC Inspector will mark "N/A," sign and date Block 25 indicating he did not desire to witness the testing.
3. Various disciplines may be checked for QC witnessing requirements.
4. Prior to completing Block 22, at MWO entry (see Section 6.8), the MWO shall have been reviewed for testing requirements with qualified personnel who l have held or hold a DB-Senior Reactor Operators 1 (DB-SRO) license. The MWO originator shall have 1 i

AD 1844.02.0 Page 45 of 51 6.12.1 4 (continued) entered N/A in Block 22 if no testing was determined to be required, but further review by QC/ Code Inspection, or Operations, may require the "N/A".to be lined out and testing requirements added as the WO is processed. All additional testing requirements shall be reviewed by an individual who holds or has held a DB-SRO license and Block 23 shall be re-initialed.to~ document this review.

5. For FCR WO's only, the Modification Coordinator shall sign and date Block 24. This is a signature area verifying that complete signoff of Enclosure 4 of AD 1845.03, Facility Change Request Implementa-tion or Enclosure 4 of AD 1845.04, Facility Change Request Closeout.

6.12.2 Test Scheduling The Document Control Group shall transmit WO's that require post-maintenance testing to the Shift Supervisor.

The Shift Supervisor shall notify the Maintenance ,

Coordinator of any support needed from Maintenance' for performance of tests.

The Maintenance Coordinator shall schedule any required shop testing support with the Shop Foreman. If no shop support is required, the Shift Supervisor may direct the performance of the test without notifying the Maintenance Coordinator.

6.12.3 Test Performance and Review

1. The Operations Department shall perform the required test (s) as specified by the Shift Supervisor. Shop personnel will provide support as needed by Opera-tions.

Testing can also be performed by the Instrument and Controls Group (I&C) or by other engineering groups.

2. The Planner shall evaluate the WO package and determine whether any follow-up action is required If so, he shall check the appropriate block'and initiate the required action.

As part of the evaluation, the cognizant individual should attempt to ensure that the WO did eliminate the root cause problem, or initiate a follow-up WO if necessary to do so.

l 1

AD 1844.02.0 Page 46 of 51 6.12.3 (continued)

3. Any DVR's initiated against the WO during the maintenance should be_ indicated as completed in Block 27 by the designated inspector or the l

inspector who is following the work.

4. The Planner shall ensure that any changes required to the Equipment and/or Nameplate Data Base have.

been completed and submitted to Equipment Data Base Entry. He_shall indicate the disposition (i.e.

submitted, NA).

The Planner shall verify that any NPRDS forms have been completed and sent to Nuclear Reliability per Enclosure 6.

The Planner'shall indicate by a checkoff that any excess material has been dispositioned in accordance with AD-1847.00. An " Excess Material Form" shall be attached to the WO in this case.

5. After a thorough review of the WO for . adequacy of work, documentation, and processing, the Planner shall sign and date Block 28. For FMD FCR WO's, the Modification Coordinator shall make the appropriate reviews and sign and date. Block 28. ,

j 6. After their review, the Planner or Modification.

)

Coordinator shall forward the MWO and test documentation to the Document Control Group. The-DCG will review the package and forward it to QC for test review if QC involvement was required and was not signed off (Block 25)'at the. time the test was performed. If QC Review is not required, the DCG will forward the WO to the Shift Supervisor for final review.

NOTE QC Inspection sign-off is not' required for.

testing that is to be performed which is to demonstrate the equipment is capable of performing its safety function (s)

(OPERABILITY, per Technical Specification 1.6 definitions) unless so designated within the procedure used to perform the testing.

1 6.12.4 QC Review of' Test

[ 1. . QC' designated inspector (s) shall-sign and date

! Block 25'on satisfactory completion of testing.

- . , . , , - - , ,ry - y +e -

,y.m---- 4._w r a w-- ~=.m- - _-m e s -w _. d , -%,,,-

% ,w , =

l AD 1844.02.0 Page 47 of 51 i

6.12.4 1 (continued)

They shall forward the MWO to the DCG after their review.

2. If no testing is required an N/A shall be entered if

'not previously done.

3. Inspectors.shall not sign this block until any NCR's i

or Surveillance. Reports affecting the' equipment operability are satisfactorily dispositioned.

QC shall place a check in Block 27 if a NCR has been written against the work or testing addressed in the

MWO. They shall also enter the number of the NCR in 1 the space provided.

Satisfactory disposition of any NCR shall be indicated in Block 27 by the appropriate checkoff.

This checkoff will be performed by the cognizant individual.

3 NOTE A completed NCR is defined as a NCR which:

a. .Is indeed. closed and satisfactorily signed off with the appropriate i

signatures;

b. Has been dispositioned "use as is" and i does not affe'ct a safety function; or
c. 'Is dispositioned "use as is, temporarily",

i.e., a safety evaluation, performed by cognizant engineering personnel, has i determined that the equipment addressed by the NCR will perform its safety function when returned to service with follow up maintenance to be performed.

If a NCR.was not written the appropriate chece. offs

will be made in Blocks 25 and Block 27.
4. If parts of the work were not satisfactory, and nct reworked under the same MWO as punch list items on a continuation sheet, a follow-up MWO as agreed by the Inspector and appropriate maintenance supervision is required. The. Inspector's signature shall not be

, entered until a follow-up MWO has been initiated the same testing requirements and the follow-up MWO number has been entered in the appropriate box in Block 27.

L l

l

\

. _ _ . _ _ .. _ . _ _ , _ , , _ - . . _ - _ _ _ . _ - . _ _ _ . _ , . ~ . - _ . - _. _ . . - -

iJ AD 1844.02.0 Page 48 of 51 6.12.4 4 (continued)

If a NCR is written against the work it shall be indicated on the original and the follow-up MWO and the requirements of Section 3 of Block 25 must be met for both MWO's.

6.13 Optrations Shift Supervisors Final Review 6.13.1 The Document Control Group shall forward the MWO to the Shift Supervisor for final review.

6.13.2 The Shift Supervisor shall sign and date Block 25 when the system / equipment is returned to service, and shall forward the MWO package to the Planner for closecut. If the MWO has an Enclosure 13, (Tech Spec Equipment Operability Checklist) the post-maintenance portion of the enclosure shall be complete prior to entering this signature.

6.13.3 The Shift Supervisor shall evaluate the description of work performed, testing results, and follow-up work required to determine operability status of the equipment that was worked under the MWO, and make any appropriate status entries in his log.

6.13.4 The Shift Supervisor's Administrative Assistant shall update the status for the MWO on DBMMS after the Shift Supervisor signs this block and forward the MWO to the DCG.

6.14 MWO Closecut and Filing 6.14.1 MWO Review The Planner shall review the MWO package for completeness and compliance with those procedures used to complete the work. After his review, he shall sign Block 28 and date the entry. He shall then route the MWO to the Planning Supervisor or Facility Modification Manager for their review.

1. The Planning Supervisor for the responsible group performing the MWO shall perform this review. He may delegate the review, in writing, to those cognizant individuals who are responsible for that system or equipment based on his evaluation of their experience, technical and management skills. His signature here indicates he has performed a review for conditions adverse to quality and will cause actions to correct the sit.ntion. He shall sign Block 29 to indicate his approval.

AD 1844.02.0 Page 49 of 51 6.14.1 (continued)

2. For FMD FCR MWO's, the FMD Manager or his designee shall sign for the final approval of the MWO.
3. The Planner shall forward the MWO to DCG. DCG shall status the MWO " closed" on the DBMMS.

6.14.2 MWO Records to Initiating Organization The Document Control Group shall check the MWO Package and make sure that all signature blocks have been signed or have had N/A entered as the MWO is processed.

A closeout review of the completed MWO shall be done to ensure completeness of documentation for historical data.

The Document Control Group shall forward copies of completed MWO's to the Planning Manager as needed to allow closeout of initiating documents such as NCR's, DVR's, etc. The Planning Manager shall forward the original initiating documents and any required documen-tation to the originating department for closeout and final disposition.

6.14.3 Filing The MWO package shall then be forwarded to the Records Department for retention per AD 1804, Records Management.

Enclosure 10, MWO Records Retention List, shall be used to determine those record items which are to be retained with the MWO. Various other in process.information items, such as "QC accept" tags, may be discarded.

6.15 Conduct of Immediate Action Maintenance 6.15.1 The Shift Supervisor has authority to conduct immediate action maintenance and to take whatever measures are required under urgent conditions to protect Station personnel, plant equipment or the health and safety of the general public. Maintenance personnel must be notified that the maintenance is of an immediate action nature prior to performing work in a manner contrary to normal procedural methods.

6.15.2 When immediate action maintenance is. authorized by.the Shift Supervisor, an attempt shall be made to call in a

'QC Inspector and/or Code Inspector where appropriate; the decision to wait for an inspector or not shall be according to the judgement of the Shift Supervisor.

AD 1844.02.0 Pege 50 of 51 l 6.15.3 During the performance of immediate action maintenance the Shift Supervisor shall enter the pertinent data for the condition in hi; log. Such data shall at least state the initial conditions of the problem, the individual concurring with the requirement for immediate action maintenance, and the actual corrective maintenance performed. An MWO will be generated and processed in the normal manner after completion of the immediate action maintenance to provide documentation of the work performed, and any reports or other documentation of ic: mediate action condition or actions taken during the immediate action shall be prepared as a.aropriate.

7. ENCLOSURES Enclosure 1 -

Work Request (ED 6665.4) '

Enclosure 2 -

MWO and MWO continuation forms (ED 6665-4 and ED 6665A-3)

Enclosure.3 -

MWO Suspension Form Enclosure 4 -

MWO Personnel / Equipment History Form (ED 6665C)

Enclosure 5 -

NPRDS Report Form Enclosure 6 -

NPRDS Report Form Instructions Enclosure 7 -

Work Control (MWO) Flow Chart Enclosure 8 -

Status Codes Information Enclosure 9 -

Priority Assignment Instructions and Processing Requirements Enclosure 10 - MWO Records Retention List Enclosure 11 - Information Tcg Enclosure 12 - Technical Specification Equipment Operability Checkoff List Enclosure 13 - Technical Spec Equipment Operability Checkoff List

8. DOCUMENTATION -

The following requirements shall be met by all Station and outside organization personnel for documentation of maintenance and modifi-cation work.

8.1 Information Elements Al'1 items of information recorded on the MWO, continuation sheets, and other forms required by this procedure shall be either 1) type written 2) mechanically printed on the Form or

3) printed legibly in black ink.

8.2 MWO Review and Approval Signoffs MWO review and approval signoffs shall be made using black ink.

Pencil written signoffs are unacceptable. Entries of "N/A" shall be initialed and dated unless they are entered prior to MWO printout using DBMMS. When an. item is to be withdrawn, the signoff or item shall be crossed out, and the individual making the change shall initial and date the entry.

l t

i

AD 1844.02.0 Page 51 of 51 8.3 Special Processes and Test Documentation Documentation required for special process work (such as welding on code components) and tests shall be prepared and

' processed in accordance with the procedures which govern the work.

i I

/

Y <#

t 1

-, .-,.-+~y,- - - - , --,-m- ,, - - - - ,--,--a -

n-.- e . -. - --n+- . ..,r-- , , - - - , , , , , , ' - ~ + -

)

i l

i I

l 52 AD 1844,02,0 l Enclosure 1  !

Page 1 of 1 DAVIS-BESSE NUCLEAR POWER STATION C2RK REQUEST E D E803-2 o-EQUIPMENT /4NSTRUMENT N AME EQUIPMENT / INST RUME NT NO.

1 I f f f I t f f O RIGIN ATO R PHONE NO. ORIGIN ATOR SEC TitJN SU S-S U BS Y ST E M INFORMATION TAGS ON EQUIPME NT t t t i e e i e i i "t t YES O NO TIME OF F AILURE DATE OF F AILURE REQMODE 1 9 i i t !' ' t t i f FAILUREIPROBLEM/ WORK

SUMMARY

t t t + , e i e i I e , t 't t . I t i l . , e i DESCRIPTION OF PROBLEM / MALFUNCTION / WORK TO BE PERFORMED t i t t t t t , I f ,

t i i t t . l t

  • r t t -t t i

! +

t e f f , Y f *

  • I 1  ! 1
  • 1 t' t f 1 1 1 l r f 'f 'l t I f f I I

t e f f 1 t t r r a ~t  ! t t i t t t i r t  ! t f I t i t f r , , ,

s ,

t 9

  • i t f n i t  ! t t i i t t
  • t  ! t t t i  !
  • r i e t , , , , , I t , , t , t l . ,

t t , t i , , , , ,

, , t , , , ,  ! , , , , ,

e t i t i i f . . ,

f 1

  • i e t r e t l r i i t t t e t PnEPARED BY DATE REVIEWED!Ar# rot h J U f DATE i

l 53 AD 1844,02.0 Enclosure 2 Page 1 of 2 (Cover / Control) l DAVIS SESSE NUCLEAR POWER STATCH OU'G Tvpt wAMENaasCE wona OFOEn m REMD FOR @ g. *g'0*

E 0 e*65-4 DES' RANT TO UCCE RE QJRED ScreEcuuss o pshose?v. wtost .

M E7

,.g o y

43]%

== = =-s== acc w e 54 $5'Ew  ! wA%'t NA%E Cie,5dC A'@

_ f **** *f **V e *N= M * * *** *  ! "'

  • a* :

c,ws, 3 w.n  ; m.

ot.ria , u. -:

I w_ aces; e.

w w v E:st aw D:

.w. aw g axesva a ww ===Js ra ex= n as Mara ws. I ,

sa4 ,

N4AN 1-

~

v.

cwa j i

.aw u m i, woma mEgogas EQJPwENT ssO*ERAALE I a VES 6 i ano mEDUNDANY EQuipwENT TO BE AwalLAh2 8

  • p . *tma, WM% utJCA*0h [

S M' I] CJ ANUNESS Q Eqc.0 Lag 13  ! AWPt9 4 JTE: emes EJ %.tJ45 I AEPAECr>aED I'AG3.NG i ST C f%OS.JAE a i 3 8JnNG PFawT ] *C sam E PEsert ] ,[,s./ '^

wt ws =Eavsta m aav a.ws aca ctc+.s u

no a.,,

71',,,.

VES No gog gio 9 No Rey  ; 960

- , - ~ . - . _ w Rev

.v -% ..V lI t

w. ..u v .; .a we-

,a 4 a w 4 Let w;m . rA st l

1

.......s. x. , . _ , , , ,

t 44 1.W KS M.

..mm-m ot& am M _

f N

a =, m- n -- n. - - e l o -,

. , s. _ . 4 4 .w.= ,

e m. 4.* m mA ,a4 4. v x. ~*

% ,#W.& N O g. S. Uw',S'FE.d J't

(. J,c/ J W1.JY s l

a. # .-.. "

- .u m. . ~ m.w - ~

Iu p . . # v we e c.m --

n m j x6 I

,NSpEcrcNirESilNG REQumED B " *ES C No

~., . n. n . .

- . . = 4 - # w .as e CG.

.-:a -TE o .,,0 -.C,o =. O " O ""'o,".o E auaE-N, O **de m - -

O a]' a E ^ -

i m a=4. e t t%w . .a a

[ iSI 'l  :=

y I

. 'm W austusonsta neoceunoN ccwortro aac = Tun.co to swT suptsusomhv%.m w'~

rs I a Yh

- m %. ,cro ews

,e m .a t 2.m , a - i g vet, g no

]r,*[**c

,~].,~ 84*ce mata

-,to .mo~ . ccwtste enssse so escassus.a% fc unaa cnas g .gs u.wa c.w c o e.a

+ g. - .

-. . .m .. , r, t ;

. pX %. .. - ,e

.. . . . ~ cowatatre uaeEi.aeca a enoEm newwto are aer'oto ;, .nsiir. U i W %ie.

^

FOREMAN COMPLEllON COPY TO MAINT.ENANCE PLANNING ,. _ _

,, j i

4 1

4 54 AD 1844,02'.0 Enclosure 2

' Page 2 of.2 (Continuation)-

DAVIS-BESSE NUCLEAR POWER STATM MAWTENANCE WORK ORDER ...

PERSONNELi EQUIPMENT HISTORY t ** %

aosasse 1 8 4 wat t us.64f Ct I

i I-g GLsia e' cm os ac*.e et**gewga I

i k

?

4 f

4 i l i .

i i

1 s

i .

1 '

I ,

l l i i f

f

[ ,

1

- 5

+ e l  ; - - - - . - - - , __ . _, a

, *W -*--** = = = m ee. ..~ % . , ., , , , ,

f .

j.  !' r. ,- ~ _ , _.m__
  • * ^ i s"*'

d * '.ye

+3 s.

l t

55 AD 1844.02.0 Enclosure 3 Page 1 of 2 MWO SUSPENSION FORM (FRONT)

SUBSYSTEM NO. -

MWONO. _- -

NAME DATE STATUS T0: S-

REASON

CHECK ONE BOX:

O Q3 or NQ, Non Tech Spec Related (Encl! 12 N/A), No QC Designated Inspection.

O Q1 or Q2, Tech Spec Related Enclosure 12, or QC Inspection required.

- QC Signature Date Work that was performed has been inspected and is satis factory.

QC COMMENTS (List any NCR's) s l

l I

w <- e- -

+- y- vv r,.--3-. -

ww--3.e-- --e-- --,_.----e,.,~-w-,,-------m -

,,ya, , - .. y,---m_.;,,

l 56 AD 1844.02.0 Enclosure 3 Page 2 of 2 1

MWO SUSPENSION FORM (BACK)

Shift Supervisor Comments O Operable o Inoperable i

Dascribe any testing performed r

f Shift Supervisor Signature Date STATUSED BY: DATE

  • -k*-!cicaaaxwe<+;cx->*t+ax+k***-a-a>**-alex4+k***t+; ;. ;; A !ck***A4+k***-alca+k*f.-k PLANER STATUS T0 P-IN-SHOP i

(Signature) (Date)

. RESUMPTION OF MAINTENANCE STATUS TO: P-REQUESTED BY: DATE STATUS BY: DATE i

i

i .

57 AD 1844,02.3 Enclosure 4 (Front) note: coene es em case se se enssee se DAVIS 4 ESSE NUCLEAR POWER STATION ""'"** '

MAINTENANCE WORK ORDER CONTINUATKNd SHEET o, s o sessa a

! e t

r l

i

(

i f

t t

i l.

1 Corv routing wweTE . Roused te be competedtrecoeure GR E E N . Shefi Swoeev.sor/F oremen Stut - Westeneace Pieaa.ag PINK Wo o Comoiet.ca to Memveence P4ma, YE LLOW Reiseasem Growe io Me.a ,aeace Pisa ==, MLDENnoo 7 o, ea comosei oa cope to we. .easace p ena.a.

. , .. , ~. _ , ._,

';8 AD 1844.02.0 Enclosure 4 (Back)

I I

i Pf a504%EL AfCORD USE INITIAL OF F.RST . I l i AND %DDLE N-.NE AND '

ENTIAE LAST N AME (Print) 0 ,

t ,' ,

En4WS 3 (Saf? ( b 8 i

l l l l l  ! 3 I

t l

l i i I  ! i i t 1 i -

I i i

l l i '

l 4 i i i i i i i I ,  !  ! I i l

l l l I i l l l i l I I i i I e l l l I l I I i I i i  ! ,

I '

i i  ! i e  !

l l l l l I !  : i i i i  ;

i  !  ; ! I i , I i '

l  ! ' l l i ' I i I  ! i >

, i i i i l . i i i  ! i i  !  ! l l l  !

i

, , j i , i i i ! ,

I l 1

! I 1 , i I i  ! i <

... s s o . N i . . ... .s

,.u ,,u . .s: 2s,.,.,,,a_ c., o,

'is? f Gw pYt N' O %O 6 04. gaa ,, ss g eg g &.g3 gg) g ,, ag g. g g,g ; , , . ,

't h' f Cv 7ve %t C %Q & is, gaa. pg 7,g g g .g g. g 3 eyg g ; g) g t a, ,,, g ; y, ,.,

MATE RIA L VENOOA PaatU$tD $f0Cu CODE NO QU A%fiTV MtY PO P4 UV5En a

t l

t 6 4 t

I

~

. ... --# g e

= . . -  %-  %. . . %

L

. - - - . _ ~ _ _ __

I 59 (NOTE: see Enclosure 6 for completion instructions)

Enclosure 5 ADDENDLH TO MWO NtHBER SYSTEM DATA NECESSARY FOR FAILURE REPORTING DATA BASE PACE No.

I .

I. SEVERITY LEVEL CODE (Circle 1) II. FAILURE SYMPT 0M CODE (Circle 1) i J IMMEDIATE A PHYSICAL FAULT i K DECRADED B OUT OF SPECIFICATION L INCIPIENT C DEMAND TAULT L D ABNORMAL CHARACTERISTIC E RELEASED LEAKAGE III. CAUSE OF FAILURE 3

A. CATEGORY (Circle 1) B. DESCRIPTION'(Circle up to 3 of a group) i A ENGINEERINC/ DESIGN MECHANICAL CAUSES ELECTRICAL CAUSFS B INCORRECT PROCEDURE AG ABNORMAL STRESS AB FOREIGN / INCORRECT MATERIAL C MANUTACTURING DEFECT AR INST 1ATION BREALD0kN D INSTALLATION ERROR AC PARTICULATE CONTAMINATION AD . ABNORMAL / NORMAL WEAR AS. SHOR $ E 3 M [

l E OPERATING ERROR AT OPEN CIRCUIT

  • AE LUBRICATION PROBLEM F MAINTENANCE / TESTING AU CONTACTS BURNED / PITTED / CORRODED AT WELD RELATED i H WEAROUT AV CONNECTION DEFECTIVE / LOOSE PARTS AC ABNORMAL STRESS l J OTHER DEVICES AV CONNECTION DETECTIVE /LOOSg AV CIRCUIT DEFECTIVE

! K UNKNOWN AX BURNED / BURNED OUT PARTS.

AZ MATERIAL DETECT AY ELECTRICAL OVERLOAD BB MECHANICAL DAMACE/ BINDING AE MATERIAI! DEFECT

' BC OUT OF MECHANICAL ADJUSTMENT BE DIRTY

t. BD ACINC/ CYCLIC TATIGUE BG CORROSIGN 1

BE DIRTY A33rs7 VENT /HtHAN RET.ATED

, BT BLOCKED /0BSTRUCTED i

' AA TOREIGN/ WRONG PART BC CORROSION' AL SETPOINT DRIFT AM PREVIOUS REPAIR / INSTALLATION STATUS t

AN INCORRECT PROCEDURE I

BC OLT OF MECHANICAL ADJUSTMENT i

  • BH OUT OF CALIBRATION 4

BJ INCORRECT ACTION IV. CORRECTIVE ACTION TAKEN (Circle 1) V. DOCtHENTATIO';/ FOLLOW-UP (Circle 1 or 2)

AA RECALIBRATE/ ADJUST A FAILURE REPORTED TO ARCHITECT /ENCINEER

(

AC TDtPORARY MEASURES B FAILURE REPORTED TO NSS SUPPLIER 4 AE MODITY/ SUBSTITUTE C FAILURE REPORTED TO CONSL1 TANT j A0 REPAIR COMPONENT /PART D FAILURE REPORTED TO COMPONENT MANLTACTURER

AH REPLACE PARTS E TAILURE ANALYSIS PECOMMD
DED l

AK REPLACE COCONENT T FAILURE ANALYSIS PERFORMED G PHOTOCRAPHS WERE MADE -

1 H LER SUBMITTED

, Z NONE OF THE ABOVE VI. . FAILURE EVENT END: Year Month ~ Day Time VII. STATUS CODE _.(Circle 1 of each group)

SYSTEM EFTECT CODE SYSTEM LEVTL A LOSS OF SYSTDt FL7CTION .'A SYSTDI IN SERVICE (OPERATING / STANDBY)

-B DEGRADED SYSTEM OPERATION B SYSTEM IN TEST i C'. LOSS OF REDUNDANCY C SYSTEM Is MAINTENANCE D LOSS OF SUBSYSTDt/ CHANNEL .

D. SYSTEM OUT-OF-SERVICL (60T Id MAINTE M CE)'

, E~ SYSTEM TUNCTION OR OPERATION UNAFTICTED PLANT EFFECT CODES CHANNEL LEVEL i A' RESULTED IN REDUCED POWER OPERATION 'E , SUBSYSTEM / CHANNEL.IN SERVICE (OPERATING / STANDBY) l B 'RESULTED IN UNIT OFT-LINE F SUBSYSTDt/ CHANNEL IN TEST l C RESULTED IN REACTOR TRIP C SUBSYSTDf/ CHANNEL IN MAINTENANCE p D RESULTED IN PERSONNEL INJURY H SUBSYSTEM / CHANNEL OUT-OF-SERVICE (NOT IN MAINTENANCE)

E RESL1TED IN OFF-SITE RADIATION F RESULTED IN DAMACE TO OTHER EQUIPMENT C RESL1TED IN NO SIGNITICANT EFTECT Completed.by' Date Approved by Data r

,4m.r - , , t - - . e - -

. , _ , . _ , . , _ , .m, , , . . . - - -J w_ .m_. _ r. .,y -,_.~,w,,. , mm. m,-w_.-,,,,m.

I 60 AD 1844.02.0 Enclosure 6 Page 1 of 2 NPRD Form Instructions

-G neral Instructions NUREG 1022 recuires that a report be submitted to the Nuclear Plant Reliability Data System (NPRDS) for all failures of certain plant systems and equipment, which are listed in the reportable scope. The Enclosure 5 NPRD form is used by the Station to idrntify that such a failure occurred, and to forward information to the Nuclear Raliability section. When Nuclear Reliability is made cognizant of a failure, it is their responsibility to prepare a detailed report using the Enclosure 5 information, cad other data sources, to tne NPRDS data base which is operated by INPO.

Detailed Form Instructions

1. The individuals in Planning and Scheduling who prepare the MWO's shall deter-mine reportability by reviewing the NPRDS Data Base listing. If the component or system appears in the listing, indicate-in Block 27 on the MWO. when a failure is known, mark "YES" as appropriate.

NOTE: Although the DBMMS may indicate NPRD reportability on MWO, the DBMMS Equipment Data Base is not accurate. Therefore, the NPRDS Data Base must be reviewed for verification or reportability.

2. If the equipment is reportable, an NPRD Form shall be attached to the MWO by Planning.
3. Effort should be made to complete the NPRD Form immediately in the field if adequate information is available. In some cases, completion of the form may have to wait until the maintenance is complete and/or a review of the work performed including an evaluation of the failure mode can be performed.
4. The person completing the NPRD Form shall enter or circle the appropriate data for the heading and Romaa numberal items I through VII- and sign for the form's completion. Additional 4 ssistance can be obtained by use of the NPRDS Report-ing Procedures Manual. Section 5 of this manual explains and defines the reporting codes listed on the NPRDS Form. A copy of this manual is available in Nuclear Reliability and the Tech. Library.
5. During MWO close out, Document Control shall route the NPRD Form to the System Engineer for review. The System Engineer, or Alternate, is ultimately respon-sible for ensuring the NPRD Form is completed properly.
6. If the NPRD Form is completed in the field, that person shall sign the

" completed by" block. The System Engineer, or alternate, shall review the form to ensure its completeness and accuracy and sign for its approval. If the System Engineer, or alternate, completes the NPRD Form, both places shall be signed by that person.

61 AD 1844.02.0 Enclosure 6 Page 2 of 2

7. The NPRD Form shall be included in the MWO package routed to Planning for closeout. Document Control shall forward a copy of the form to Nuclear Reli-ability for additional reviev and further action.
8. Nuclear Reliability shall review the NPRD Form. If a failure is verified as reportable, then the associated work request, MWO, any DVR's or LER's, are compiled with other appropriate data in the final NPRDS failure report. The-NPRDS failure report is then forwarded to INPO for final processing and inclusion into the industry NPRDS data base of failure reports.

i i

I

(

1 l

62 AD 1844,02,0 Enclosure 7 Page 1 of 5 WORK CONTROL (MWO) FLOW CHART Work Maint/Oper./ Modification Surveillance Prev.

R: quest QC Initiates Package Report Maint.

Init./ NCR or DVR (FCR) Sched.

App ryd .

6.2.7 6.2.3 6.2.2 6.2.4 6.2.1 Planner Operations Identifies s Coordinator Task -

6.3.1 Planner performs walkdowns, reviews

/r  :

6 .4.6 Security DB-SRO l  ; procedures, dwgs, vendor manuals  : Dept.

6.4.6 =- and identifies corrective action, sequence, and procedures to be Fire Prot. j implemented. '

Quality Coordinator L 6.3 & 6.4 -

Control 6.4.9 i' l

Chem.& Health Physics Planner Generates and Prints out MWO 6.4.3 6.4.14 l -

I s Are Parts / Mat'ls./ , . Planner Initiate.s , '  !

No Special Equipment Yes BOM or MIT apJ  !

Required? initt tes Procurement.

Long No Lead Time Yes l

MWO to DCG.

Status = H-Parts

-DB SEO and NWO Planner 6.5.2 Ops assign _

Pulled ,_ Notified , Parts / Equipment Rec'd!~

6.5.2 Work Priority from ' '

6.5.2 6.6 file 6.5.2 A

63 AD 1844.02.0 Enclosure 1 Page 2 of 5 WORK CONTROL (MWO) FLOW CHART A

Planning Supervisor Review 6.6.3 QC Yes MWO sent to QC Review . by Doc Control

, Required ~ ^

6.7.2

?

Hold cleared 6.7.1 -

I .

Hold No QC review and Status - Work return to DCG H-Budget , No Start in One 6.7.2 H-Outage 'eek (approx. )

H-Manning  ?

H-Condition etc.

Yes i SRO Review Required No Yes SRO Review 6.8.2 I

MWO to DCG for filing

~~ Status - Approved  ::

6.8.3 i

i DCG transmits MWO to Maintenance l

Coordinator 6.9.2.

I Maintenance Coordinator transmits to Lead Maint. Shop 6.9.2 B

l

4 64 AD 1844,02.0 Enclosure 7 Page 3 of 5 WORK CONTROL (MWO) FLOW CHART B {pg. 2)

Shop Foreman receives MWO Maint. (M - In shop)

C ord retrieves y 6.9.3 from DCG and transmits to -

Shop Foreman MWO 6.10.3.2 ' requires Shi YES

^ Supervisor releas -

C to proceed (pg.4) 1 4

7 6.10.1.1 t

Planner and NO Foreman Foreman approves to resolve commence work problem (M-SHP-APPR) 6.10.3.2 6.10.1.2 A

l 1

l Contact rob J

MWO Filed at Foreman YES arises not covered by i

DCG .who contacts MWO 3

Planner  ? .10.3 6.10.3.2 .. _

6.10.3.2 NO-Msint.

Coord. NO Can Initiates work cont. YES Work continues until restatus T with #

complete (M-VRK-CMPL)

(MWO - problem 6.10.2 HOLD)  ? >'

6.10.3.1 v

Foreman signs ,

work complete l (P-Foreman-SN) 6.11.1 D (pg. 5) i

-___.J~.. _. ~.,._ -.,. ,_ _, ___m - _ _ . _ _ . . _ . . , ,

65 AD 1844.02.0 Enclosure 7 Page 4 of 5 C

Shift Supervisor approves MWO and issues release to proceed Shop Foreman (P-WRK APPR) < reviews and 6.10.1.2 routes to Shift Supervisor 6.10.3.1, 6.10.1 A

/

Problem l arises not YES Contact Foreman N. covered by MWO > who contacts Maint. Coord.

7 Maint. Coord. retrieves from

.10.3.1 6.10.3.1 DCG and transmits to Shop Foreman i

an Planner and Foreman Work continues work resolve until completed ,

YES / continue , problem i 3

(P-WRK COMPL) with' !6 6.10.2 problem?  !.10.3.1 I a

NO Foreman signs off MWO suspended MWO filed work complete Shift Supervisor >. DCG (P-Foreman-SN) 6.11.1 6.10.4, 6.10.5 D

Pg. 5 l.

I I

66 AD 1844,02.0 Enclosure 7 Page 5 of 5 D WORK CONTROL (MWO) FLOW CHART Did QC signoff Foreman transmit to DCG prepares NO in the field DCG ___4 MWO Package for

? 6.11.2 QC Review (P-In DCG) ge 6.11.2 se QC reviews DCG transmits DCG retrieves MWO ,,

and signs MWO MWO to QC (P-In QC) 6.11.2.9 6.11.2.4 6.11.2.3 Testing YES DCG transmits , SS notifies MC' Require < > MWO to SS #

of test schedule

? (P-Hold-Test) 6.12.2 l

.12.1 6.12.2 x

No yo PPort equired P/S achedules Shop; N

s testing support

'DCG transmit MWO s 6.12.2 to Shift Supervisor (SS) & NN 6.13.1 \s I

QC review and s g Test Performed Shift Supv. signoff for final signs MWO acceptance 6.12.3 (I-SS-signed) 6.12.4 6.13.2.1 1

DCG retrieves MWO and routes for final Planning-review / approval 6.14.1 Planner reviews / approves NWO 6.14.1.1 1

Planning Supervisor reviews / approves MWO 6.14.1.1 I

DCG retrieves MWO and updates status (I-S/O-COMP) 6.14.2 lMWO closed and history recorded (C-CLOSED) 6.14'.2,3 i

FCR MW0s sent to Engineering, other MW0s sent to Records Management 6.14.3

67 AD 1844.02.0 Enclosure 8 Page 1 of 1 i

STATUS CODES INFORMATION B-APPROVED Waiting for manpower to schedule MWO (Should.be in DCG file) i B-IN-QC In QC for signature /na or assignment of inspector i B-PLANNING MWO planned to work - not yet in shop (Should be in DCG) - SRO Review B-UNSIGNED Default when MWO created on DBMMS (Until QC sign or N/A)

~

C-CLOSED All documentation & history generation completed (RMS)

H-BOM BOM submitted-parts not on order by P.O. (Should be in DCG)

H-BUDGET . Budget approval or task authorization required (Should be in DCG)

H-CNDITION Conditional activity - weather, safety, prework (Should be in DCG)

H-COG COG individual has MWO - for void, documents (W/ Planner) '

l H-CONTRACT Waiting for bid decision or contract to be let 1

H-ENGR'ING Waiting for engineering decision or anslysis (Should be in DCG) l H-0UTAGE Waiting for equipment, system or plant outage (Should be in DCG) l H-PARTS Waiting for parts delivery or availability (Should be in DCG) -

I-FCR-STAT Work complete, M 3 completing required enclosures (In DCG)

I-FINL-S/0 FinalSignoffreq.fromCOG&LeadEng.for. clos /o(SShas;asigned out for last 2 signatures)

I-FORMN-SN Block 19 of MWO signed by craft foreman (Shop app)

I-IN-QC In QC-signature req'd. for closcout documentation

I-S/O-COMPL S/0 comp 1 from COG & Lead eng for MPG closeout (W/ Data Entry) i I-SS-SIGN Block 26 signed - work and/or test complete (routed to DCG)

M-IN-DCG In DCG'for walkdowns/ signatures after fereman's signoff M-IN-SHOP- MWO signed by foreman as received in shop (In Shop)

M-QREVIEW Waiting for QC acceptance of work and documentation (In QC) i M-SHP-APPR Block 14 signed by craft foreman - commence work (In Shop)

M-WRK-CMPL Block 15 of shop approved MWO signed by worker (In Shop) l P-FCR-STAT Work complete, DCG completing required enclosures (In DCG) j P-FORMN-SN Block 19 of MWO signed by craft foreman (SS appr) (Routed to DCG)

P-HOLDTEST In shift supervisor's " Hold for Test" file i

P-IN-DCG In DCG for walkdowns/ signatures prior to form sn (In DCG)

P-IN-SHOP- A suspended MWO being rescheduled to be worked (Routed to Shop)

P-QREVIEW Waiting for QC acceptance of work after formnsn (In QC)

L P-WRK-APPR Block 14 signed by shift supervisor-commence work (In Shop)

P-WRK-COMPL B1cok 15 of SS approved MWO signed by worker (In Shop).

S-CNDITION SS approved, MWO-suspended - weather, safety, prework (in DCG) i S-ENGR'ING SS approved, MWO-Suspended - engr'ing analysis, etc. (In DCG) i S-PARTS SS approved, MWO-Suspended - parts required (In DCG)

I S-PARTS-IN Parts are in for a suspended MWO/FCR (In DCG) l S-PLNT-CND SS approved, MWO-Suspended - change in plant status (In DCG) l V-VOIDED No work performed - MWO_ Voided (RMS) l l

l

s t 68 AD 1844.02.0

,, Enclosure 9

, Page 1 of 2 Ph10'RITY ASSIGNMENT INSTR 1JCTIONS Guidelines For Determining Priorities - The following guidelines should be used by the Operations Coordinator to establish priorities for tasks:

1.1 Priority 1 .j

a. Prevent immediate unit shutdovn or possible shutdown 4
b. Tech Spec with action statement less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
c. Prevent endangering general public

-d. Correct Security deficiency which compromises boundaries

e. Restore operation to LCO as defined in Tech Spec.

l '. 2 Priority 2 1

a. Prevent derating of unit (greater than 10%)

b.

Prevent equipment damage

c. Prevent increased radiation exposure
d. Prevent increased radioactive contamination
e. Tech Spec with action statement greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
f. Prevent NRC reportable occurrence
g. Eliminate immediate personal safety hazards 1

1.3 Priority 3 3

All MWO's not Priority 1 or and including PM's and non-outage FCR's, are designated Priority 3.

Priority 3 MWO's will be scored using_the following criteria and appro-priate weighting factor. Each criteria will receive a score from 0-10, 10 being the highest score. The individual criteria scores are then summed to give a total score. The highest tota 1 score is the most important,

~

, highest priority within the Priority 3 category.

Criteria Weight

,a . Personal Safety .

9

b. Maintain Unit Efficiency or Capacity 8
c. Reduce Radiatio'n Exposure / Contamination /Airborn 6 Chemistry
d. ' Nuclear Safety Related/ Fire Protection System 7
e. Needed to Restore or Insure a Systems Operation / 7 Plant Tools and Equipment
f. . Correct ST Surveillance Deficienty 5
g. Regulatory Impact NRC/ EPA / OSHA /NPDS/etc. 6
h. Correct for AFR's/DVR's/NCR/s/etc. 6
i. . Security Related 5
j. Needed to Support a Systems Operation / Pre-outage / 4 Fabrication / Plant Upkeep J

. . - -- ,- ,r-- - ,, , e.,

69 AD 1844.02.0 Enclosure 9 Page 2 of 2 1.4 Priority 4 Tasks which can only be performed during Station outages shall be assigned Priority 4. The Outage Management Department shall assign schedule priority weights to such tasks.

t i

1 r

{

i

-- - . - . , - , <v,-,.,, , -, - y r

70 AD 1844.02.0 Enclosure 10 Page 1 of 1 I

MWO RECORDS RETENTION LIST Grneral Guidance Items which document unique work activities and conditions of plant equipment shall be retained. Items which do not bear. signatures and dates documenting specific activities need not be retained. For example, a maintenance procedure which in-

-cludes data sheets to record bolt torque values and requires signoffs of specific steps shall be retained, but copies of procedures that do not include data sheets or require signoffs need not be retained. In the latter case, the archive copy of the procedure, its identity listed on the MWO and the signoff on the MWO provide an adequate record of the work.

Specific Records to be Retained R2 cord items which are to be retained include:

Work Requests Maintenance Work Orders and continuation sheets Personnel / Equipment-History Forms Non-destructive examination reports Inspection reports which document final equipment conditions Non-conformance reports Deviation reports Data sheets Calibration reports Post Maintenance testing reports Preventive Maintenance Periodic Test Reports Surveillance reports Material Issue Tickets Welding Travelers Preheat record logs Post-weld heat treatment records Hydrotest records Records of final plant configuration as required by Facility Modification Procedures MWO Suspension forms Technical Specification Equipment Operability Checkoff Lists Procedures which require signoffs for completion of specific steps within the procedure 1

l t

i

l I

l 1

I 71 AD 1844.02.0 i Enclosure 11 j Page 1 of 1 l

i OPANGE INIOPSRTION TAG l

l l

Ins truc tions The tag is to be hung as described in procedure

! AD 1844.02 and in the Tagging Procedure, AD 1803.00. The items shown below are to be com-pleted by the individual placing the tag.

l I

~

i

\

i 4

l 1

l l

l I

I

\

I j Identity of equipment and description of the condition which cased the tag to be placed.The description should include the reason that the tag is attached to the item, and any.special precautions which should be taken before the tag is removed.

.)

- Name of Individual placing tag.

Date tag is placed.

Department of individual placing tag.

Work Request or MWO number that the eculp e-is associated with.

x 72 AD 1844.02.0 Enclosure 12 Page 1 of 4 l l

TECH SPEC' EQUIPMENT OPERABILITY CHECK 0FF LIST INSTRUCTIONS

1. GENERAL INSTRUCTIONS 1.1 A Tech Spec Equipment Operability Checkoff List, Enclosure 13, shall be

, attached to all MWO's which will, during the course of the planned mainte-nance, render any Tech Spec equipment or Tech Spec support equipment, per Section 3 of this inoperable, i N01E:

There are a number of Maintenance Work Orders generated before the DBMMS MWO System was initiated which have not been closed out. The present maintenance procedures require an Enclosure 13

.for all Tech Spec or Tech Spec Support Equipment MWO's. Some of these MWO's were generated before the Enclosure 13 requirement was established. It is not necessary.to have an Enclosure 13 for those work orders generated before DBMMS conversion if there

, is no work remaining to be performed on the MWO's. The Group will identify the MW0s with work remaining and an Enclosure 13 will be required for each MWO in this classification that makes Tech Spec support equipment inoperable.

1.2 Enclosure 13 shall be initiated by the MWO originator.and be processed with the MWO.

1.3 If the equipment requiring maintenance is inaccessible and requires surrounding equipment to be disassembled for access,.the disassembled equipment shall also be reviewed for its affect on operability of Tech Spec or Tech Spec Support systems. Of particular concern are hangers,

! snubbers, and conduit which would obstract the required maintenance.

J

2. DETAILED FORM INSTRUCTIONS 2.1 Heading Informations

! -1. MWO No. - The MWO originator shall enter the full number of.the MWO i in this spa ~ce.

2. Sheet of - The MWO originator shall enter the sheet number an'd the total number of Enclosure 13 sheets that are attached to the MWO.

Addtional sheets shall be added as necessary to list the inoperable '

j and redundant equipment and the retest requirements.

NOTE: More than one piece.of equipment may be addressed on one sheet, but all information relative to a given piece of equipment- shall be on the same sheet and each sheet shall have all of the required signatures (i.e.: It is NOT acceptable to identify an inoperable component on Sheet 1, i

73 AD 1844.02.0 Enclosure 12 Page 2 of 4 Step 1, and list its retest requirements on Sheet 2, Step

8. Both entries shall be on either Sheet 1 or Sheet 2.)

2.2 Pre-Maintenance NOTE: The numbered instructions in this section relate to the corre-sponding numbered steps on Enclosure 13.

1. The MWO originator shall enter all the Tech Spec or Tech Spec support equipment or systems which will be rendered inoperable, including restraints or snubbers, during the course of the planned maintenance.

When Tech Spec support equipment is being-worked on the affected Tech Spec equipment shall also be noted in this space in parenthesis.

This includes the equpment which must be made inoperable in order to gain access to the failed equipment. An additional sheet shall be used if required.

2. The MWO originator shall mark the appropriate Tech Spec applicability spaces (1 through 6) to indicate the modes in which the equipment is required to be operable. He shall also enter all the applicable Tech Spec reference numbers.
3. The MWO originator shall initial and date here after completing Steps I an'd 2 above, and enter the redundant equipment that needs to be verified operable in Step 4.
4. The MWO originatoi shall enter the redundant equipment which must be verified operable prior to making the equipment listed in Step 1 inoperable. The Shift Supervisor shall review the list for accuracy, resolve any discrepancies or inadequacies and ensure that the required equipment verifications are performed. An additional sheet shall be used if. required.
5. The Shift Supervisor shall initial this step after notifying the appropriate Operators that the equipment listed in Step 1 is being made inoperable.
6. The Shift Supervisor shall initial this step indicating he has reviewed the information provided on the enclosure and the. associated MWO, verified redundant equipment operability and accepts the condi-tions as adequate to permit the required maintenance. This step shall be completed prior to the signing of Block 14 on the associated MWO. .

74 AD 1844.02.0 Enclosure 12 Page 3 of 4 2.3 Post-Maintenance

7. The person responsible for the maintenance shall enter the number of any hanger or snubber that has been made inoperable due to the maintenance being performed. After the maintenance is complete, he shall sign under the number for each hanger or snubber as it is returned to operable status.
8. The MWO originator shall enter the retest requirements for the equipment when the enclosure is initiated. This information may duplicate or expand on Block 22 (Testing to be Performed) information from the associated MWOi The Shift Supervisor shall review the list for adequacy and ensure the retest is properly completed after the maintenance has been performed.
9. The Shift Supervisor shall initial this step after he verifies the retest is completed and_the equipment has been returned to an operable :tatus.
10. The Shift Supervisor shall initial this step after notifying the appropriate Operators that the equipment identified on this enclosure has been returned to an operable status. This step shall be completed prior to the signing of Block 26 (Shift Supervisor) on the associated MWO.
3. TECH SPEC SUPPORT EQUIPMENT 3.1 The following equipment is required to be operable in order to support the operation of certain Tech Spec equipment, even though.no Tech Spec exists for the support equipment itself. The requirements have been determined from the USAR and other relevant documents on an individual basis, but are probably not absolutely complete. The MWO originator and Shift Supervisor are responsible for an evaluation on each MWO for the Tech Spec equipment impact, and to obtain resolution from the Tech Section on any questionable items.

3.2 Ventilation Systems

1. ECCS Room Coolers (Reference SW SP 1104.11).
2. S.W. Pump Room Ventilation (Ref. SW SP 1104.11 - 12 hr. timt ~imit for 1 Train 00S).
3. DG Room Ventilation (Ref. DG SP 1*07.11).

- 4 CCW Roon' Ventilation (Prior Station Management Approval of Work Required).

75 AD 1844.02.0 Enclosure 12 Page 4 of 4

5. ' Aux Feed Pump Room Ventilation (Prior Station Management Approval of Work Required).
6. Low Voltage Room Ventilation (Prior Station Management Approval of Work Required).
7. Battery Room Ventilation (Prior Station Management Approval of Work Required).
8. Main Steam Line Room Ventilation. 6 3.3 Miscellaneous Equipment
1. DG Air Start System (Ref. DG SP 1107.11).
2. Boron Dilution Flow Path (Maintain Aux. Spray Line to Pressurizer and One of Two Decay Heat Suction' Lines). ,
3. Backup Service Water Pump (Prior Station Management. Approval of Work Required).
4. ECCS Room Sump Pump (Prior Station Management Approval ~of Work Required).
5. HPI-LPI Crossconnect Lines (Piggyback).
6. Heat Trace on Tech Spec Systems.
7. Seismic Supports and Snubbers.
8. Missile Shields.
9. Fire Protection Spray Shields.
10. Floor drains which prevent flooding of safety-related equipment.
11. Doors, hatches, covers, closures, and plugs which impact the Negative Pressure Boundary or the Fire Protection System.
12. Met. Tower power supply (BY-5).

76 AD 1844.02.0 Enclosure 13 Page 1 of 1 TECH SPEC EQUIPMENT OPERABILITY CHECK 0FF LIST MWO NO. Sheet of PRE-MAINTENANCE

1. Equipment / System Rendered 4. Redundant Equipment Verified Inoperable Operable t

't

2. Tech Spec Applicability (Modes) 5. Operators Notified 1/ 2/ 3/ 4/ 5/ 6/ S/S Date Tech. Spec. Refs.
3. Cog. Ind. Date 6. Shift Supervisor Approval S/S Date POST-MAINTENANCE
7. Hangers / Snubbers Operah's #/ #/ #/

Responsible Individual:

8. Retest Requirements 9. Retest Completed Satisfactorily S/S Date
10. Operators Notified S/S Date

DAVIS-DESSE MAINTENANCE MANAGEMENI' SYSTEM EQUIPMENT ENIRY/UPDAIE INFORMATION 05/10/65 EOUIPMENT NO (*) __________

MWO/FCR-MWO NO: _____________ __

EQUIP TYPE: (e,C)

Ex1 STING DBMMS NO (IF FNOWN): __________

EDUIPMENT NAME: (*,5) ___________________

SUBSYSTEM NO: (*,C) ___ __

PLANT EQUIP NO: ______ ______

P& ID NO: _

CODRD: ___

FUNCTION NO: (*,C) __

LOCATION DWG NO: _ ____

EQUIP FILE NO: _ _ _ _ _ _ _ ___

CLASSIFICATION: (C) _____ _____ _____

TECH LIB NOs NPRD CODE: (C) ______

AREA /ROON/ELV(c):____________

u OR1GINAL PO NO: LOC. COORD: _ _ , _ u REP REQUIRED: (YES or NO)

SPECIFICATION NO: ____________

INSERVICE DATE: / /

POWER SUPPLY: _ _ _ _ _ _

POSI MAINT TEST: ____________

VENDOR CODE: (C)______

OUALITY RELATED: (C) __

VENDUR PART NO: ____________________

MODS PERFORMED: _________ __ _____________ . SERIAL NO: ____________________

n u rn >

CS__ CO__ NP__ PO__ *n m :s o OPER COMMENTS: EDW _ _ EN__ E T _,,, SS__ PIW__ CR5__ LD__ CN__ nn n om s-IN5__ PMF__ UH__ PN__ FN__ IL__ ARr__ RR__ VC__ VP__ SN__ N v

0$

MISC COMMENTS: SP5__ O e .o M

REVIEW DATE: (*) / __ / __

3 FiEVIEW CODE: (*,C) ______

__ N>.

no

====2================s=u==========================ru=a=======:======:u===:a=========s=============== -

Lf_lbliND: C' Di'MMG CUDl.S fit.LD * = fiEDU1HED DAT A l'IELDS hl:l'Illist D S I GNA l tibl~ 14. 0C1 I S LOC A f t:D UN liiL DAt:1 UI- 'lllis FuhM. SutiM I T CUMPLCIED FORMS 'f D EQUIPMEffi l '.1 1.) I W it ' i NiliY , Mall S il sl

  • 210%. .-. - v- ,- -=.en=rr=--=u==s ========= ==========

DIiMMS EDUIPMENT/ NAMEPLATE DAIA BASES I<EutilRED SIGNATURES FOR ENTRY / UPDATE PREPARED BY: __________________________ DATE: __/

__ /__ SECTION: ____________

APPROVED BY: __________________________ DATE __/__/__ SECTION ____________

VERIFIED BY: ,,,_________________________ DATE: __ /__/__ SECTION: ____________

~~

VERIFIED BY: -_---- = _ _ - - - --- DATE: / / SECTION: ____________

VERIFIED BY: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , , , _____ DATE: / / SECTION ____________

i ENTERED BY: _ _ _ - _ _ - - - = _ _-_-_ _______-

DATE: __ /__/ -_ SECTION: ____________

Im,.

ENTRY CHECKED BY: _ _ - _ _ _ - - _ _ _ = = - - _ - - _ - DATE: __/--/_- SECTION:_ ________

M i . O g 1

e i

t i

A TN tp D DJ m 00 0 O fD H >-*

X O 00 V N . to d C V O M*

m tD O N e_ .N

'k O I

QUESTION NO. 6 4

2 Are any in-situ tests planned prior to restart utilizing line flaid' flow (s).in which th'e valves must close?

RESPONSE TO QUESTION NO. 6 No. Toledo Edison considers requiring a valve to open against high differential pressures to be the most severe condition of service, and a i bounding condition for testing. Delta P testing utilizing line fluid flows is restricted by plant conditions. Toledo Edison is performing limited testing using line fluid flows where the valve is required to t

open. SW 1379 has been successfully tested using line fluid flow. AF3870 was also successfully tested utilizing partial fluid flow (restricted by plant conditions).

i F

l I

l e

mj a/48

I l

QUESTION NO. 7A Are any in-situ tests utilizing delta P's and/or fluid flow planned on an ongoing basis?

RESPONSE TO QUESTION NO. 7A Currently no in-situ utilizing Delta P's or fluid flow are planned on an ongoing basis. Any in-situ testing utilizing delta P'.s and/or fluid flow conditions would appropriately be reflected in Surveillance Testing or the

In-Service Testing programs. The Surveillance and Post-Maintenance Testing Procedures are being reviewed to determine if this testing or portions thereof can be performed at expected operational differential pressures.

Toledo Edison will initiate. procedural.and programmatic enhancements as 4

. appropriate once this review is completed.

I l

l I

I l

l Wd a/48 i

QUESTION NO. 7B Ongoing MOVATS, etc?

RESPONSE TO QUESTION NO. 7B Toledo Edison has indicated intent to perform full Motor Operated Valve Analysis and Testing System (MOVATS) testing of Nuclear Safety Related valves approximately every three outages to Region III (as document'ed in November 21, 1985, telecon attached). For certain corrective maintenance activities on a Limitorque actuator, MOVATS is procedurally required. The means by which MOVATS testing will be used as a predictive maintenance tool is under evaluation. Criteria for this use (such as periodicity, action levels, etc.) cannot be prescribed until further data and experi-ence is obtained.

mj a/48

THE TOLEDO EDISON COMPANY *** '^^^*

TELEPHONE CALL DOCUMENTATION FILE page 1 of 2 E0 6650 3 9

oniGIN ATOR COMP AN Y/O RG ANIZ ATION ROUTE TO

S. Wideman TED/Licensina '-

CALL MADE TO: COMP AN Y, O RG ANIZ A TION P. Wohld NRC Reaion III 2.

CONFE RENCE C ALL PARTIES E. Caba, J. EwalduB. Elfstrom -

4.

STATION 'UN IT DATE TIME DB-1 11/21 19 A5 10:00 o m. s.

SUBJECT; Recommendations presented to TED during a recent inspection regarding testi.ng of motor operated valves.

TED agre'ed with P. Wohld that the ASME code is deficient when it comes to identifying degradation of MOVs. To 1. ave a more meaningful test, TED plans to perform required ASME stroke time testing by using either MOVATS or a brush recorder at the MCC. We would also take other data s'ach as running current and voltage. Based upon dis-cussions with Limitorque, the normal running current provides the best indication of valve degradation. E. Caba indicated that we would not have any acceptance criteria b: sed upon running current, but we expect to trend this value for degradation. At the

earlier meeting, P. Wohld had recommended that if a 2% change in stroke time was recorded, then some action would be taken. E. Caba indicated that TED felt this was too stringent bssed on discussions with Limitorque and that a 10% change in baseline would be a flag l that further evaluation of the value would be required (possibly a full MOVATS run).

1 P. Wohld indicated he was looking for some technically sound values and would like to i sie a more conservative number. After further discussion we agreed that there was probably not ennegh data to support establishing a technically sound % change in stroke times. This

% chage would be established by TED following an evaluation once a sufficient data base is cvailable. (Cont. on pg. 2)

CoplES 70.

R. F. Peters, D. Wuokko, E. Caba, J. Ewald, B. Elfstros N. Bonner, J. Long, J. Wood

""$^"b '$ideman 11/26/85

THE TOLEDO EDISON COMPANY A85-1009B TELEPHONE CALL DOCUMENTATION FILE YageZ.og 2 E o seso T2.1 OMIGIN ATO R COYp AN Y. ORG ANIZ ATION ROUTE TO:

, S. Wideman TED/ Licensing g, CALL M ADE TO: COVPANY ORG ANIZATION P. Wohld NRC Region III 2.

CONFE RENCE C4LL PARTIES E. Caba, J. Ewald, B. Elfstrom 3.

i 4

DATE TIME ST ATION UNiTB-1 11/21 85 10 : 00 'i",,';

3 3.

SUBJECT.

E. Caba then questioned whether TED needed to provide some alternative iustification for our current mode of- testina. P. Wohld indicated additional justification w== nat reanirad ha-ccuse our testing is more conservative than the ASME Code. E. Caba also indicated that TED planned to do full MOVATS te-tina of Nuclear Safety Related valves accroximatelv everv third refuelina outage.

E. Caba then indicated that it was TEDS intent that those valves that have alreadv_ been MOVATS tested and are required to be retested per ASME code reouirements durina the current cutase, we would be usina the stop watch methoG at the MCC for gate and globe MOVS. P.

Wahld did not have a . prob 1_em with this. P. Wohld_ wanted to clarify that to meet the ASME

) Ccde, the stop watch method either at the MCC for mate and alobe val cs and at the control room for the other valves is all that is recuired. But to ensure that we identify valve

, d?aradation, we should have an alternative test. such as the one we described earlier. This een be done quarterly or some other reasonable frequency TED would establish.

l P. Wohld requested a copy of the telecon documentation. I indicated I would met it to him through the Resident Inspector.

I i

I l

i COPIES TO:

"5' dideman **

11/26/85

QUESTION NO. 7C

}-

Corrective / preventive maintenance procedures, LCTS Nos. 1251, 1257.

RESPONSE TO QUESTION NO. 7C Corrective and Preventive Maintenance Procedures utilized on safety related motor operated valves are as follows:

Corrective Maintenance ~Procedurec _,'

MP 1411.04 Maintenance and' Repair of Limitorque Valve Operators Type SMB-000 and SMB-00 t MP 1411.05 Maintenance and Repair of Limitorque Valve Operators Type SMB-0 through SMB-4 MP 1411.07 Maintenance and Repair of Limitorque Valve Operator Type SMC-04 Preventive Maintenance Procedure MP 1411.06 Preventive Maintenance for Type SMB and SMC Limitorque Valve Operators Copies of the Corrective Maintenance Procedures are attached to our response to Question 3. A copy of the Preventive Maintenance Procedure i

MP 1411.06 is attached to this response.

I mj a/48

The Licensing Commitment Tracking System (LCTS) numbers referenced in this question are Toledo Edison designations for-managing and tracking various action items internal to the company. This information was submitted to the NRC in Revision 4 to the Course of Action document (Toledo Edison letter dated November 16, 1985, Serial No. 1208), and designated for informational purposes only.

I

'l y

1 i _

mj a/48

._ _ _ _ . . _ _ _ _ _ _ _ . _ . _ . . _ _ _ _ . . _ _ . _ _ . . _ . _ _ _ _ . . _ . _ _ _