. L PROCEDURE TITLE SHEET E3 7171 TITLE No. MU~N yetgoo NUCLEAR ENGINEERING aEvisio% v EDISON PROCEDURES MANUAL PAGE L oF*E SUBJECT EFFECTIVE oATE INITI ATEo 8Y Nuclear Engineering 04/07/86 Group
, Establish D/P Limits and Tests For Motor suPEaseces AF novEo sy icivie.on o rat <>
Operated Valves
+# /
/& WINi ar22:a 4 4~f 6
/ /
1.0 PURPOSE This procedure provides instructions for determining and documenting the characteristics of the installed Limitorque Motor-0perated Valves (MOVs), Exhibit I, to establish:
- 1. The limiting condition for design and operation under differential pressure (D/P) and flow. The data obtained will be used in performing the MOV Data Evaluation Procedure (NEP-091).
- 2. A representative sample of valves to be tested to confirm the adequacy of the corrective maintenance procedures listed in paragraph 4.5 used in the Motor Operated Valve Reliability Improvement Program.
- 3. Test conditions for the representative sample of test valves (Exhibit VI).
2.0 SCOPE This procedure applies to all Limitorque Motor Operated Valves types SMB and SMC, and shall be performed on MOVs listed in Exhibit I.
3.0 RESPONSIBILITY The Nuclear Engineering Group Director is responsible for the preparation, and use of this procedure by engineers who have received the following training:
- 1. Principles of operation of Limitorque Operators.
- 2. Interpretation of MOVATs Field Data.
These courses can be administered by certified contract personnel or similar courses developed by the Nuclear Training Division.
4.0 REFERENCES
4.1 Davis-Besse Technical Specifications 4.2 Toledo Edison Specifications 4.2.1 12501-M-210N, Non-Nuclear Gate, Globe and Check Valves 2 1/2" and Larger 8604150348 860410 PDR ADOCK 05000346 p PDR
PROCEDURE CONTINUATION SHEET B so retto sus;Ecr t.stablish D/P Limits EPPECTIVE D ATE PAGE NO, and Tests For MOVs 04/07/86 2 22 NEP-092 4.2.2 12501-M-212Q, Nuclear Gate, Globe, and Check Valves 2 1/2" and Larger 4.2.3 12501-M-213Q, Nuclear Gate, Globe, and Check Valves 2" and Smaller 4.2.4 12501-M-215Q, Nuclear Butterfly Valves 4.2.5 12501-M-314Q, Nuclear Control Valves 4.3 Toledo Edison Drawing, 7749-E-15, NOV Data List 4.4 Davis-Besse Updated Safety Analysis Report (USAR) 4.5 Davis-Besse Maintenance Procedures 4.5.1 MP-1410.32, Testing of Motor Operated Valves using MOVATS 4.5.2 MP-1411.04, Maintenance and Repair of Limitorque Valve Operators Types SMB-000 and SMB-00 4.5.3 MP-1411.05, Maintenance and Repair of Limitorque Valve Operators SMB-0 through SMB-4 4.5.4 MP-1411.06, Preventive Maintenance of Type SMB and SMC Limitorque Valve Operators 4.5.5 MP-1411.07, Maintenance and Repair of Limitorque Valve Operators Type SMC-04 4.6 Nuclear Engineerina Procedures Manual 4.6.1 NEP-050, Processing Surveillance Reports 4.6.2 NEP-080, Calculations 4.6.3 NEP-090, Design Verification 4.6.4 NEP-091, Motor-Operated Valve Data Evaluation Procedure 5.0 DEFINITIONS 5.1 CEECKER- Mechanical Design Engineer designated by the Mechanical Engineering Supervisor.
5.2 DESIGN FUNCTION - Close or open while a design condition of pressure or flow exists.
5.3 LIMITING DIFFERENTIAL PRESSURE OR FLOW (LCPF) - Differential pressure (D/P) or flow across valve disk which is the maximum under which the valve is to perform its design function.
5.4 MOV - Motor Operated Valve havlsg a limitorque operator.
5.5 POSITION SEATED VALVE - Valves which are positioned by limit switch, i.e. quarter turn valves and diaphragm valves.
PROCEDUZE CONTINUATION SHEET
' ' E O 7171 A su saect Estabitsh D/P Limits spractive cara pace No.
and Tests For MOVs '
04/07/86 3 22
,, NEP-092 5.6 RESPONSIBLE ENGINEER - The engineer trained in the principles of operation of Limitorque operators and field data interpretation according to NEP-091.
5.7 SYSTEM ENGINEER - The engineer responsible for a system with valves of interest.
5.8 TORQUE SEATED VALVE - Gate or globe valves requiring torque switch activation to provide tight shutoff. '
5.9 CONFIRMATORY TEST - Test of valve that will ensure maintenance procedures used on each MOV are adequate when: 1
- 1. Bypass switch setpoint is sufficient to allow !
valve unseating prior to reinsertion of the torque '
switch into the control circuit.
l
- 2. Torque Switch settings ensure closing the valve '
sufficiently to meet its limiting differential Pressure or flow.
6.0 REQUIREMENTS l
6.1 Method of Valve Cateaorization Responsibility Action Responsible Engineer 6.1.1. Categorizes all safety-related MOVs on i the List of Nuclear Safety Related MOVs ;
(Exhibit I) utilizing Exhibit VIII. '
The valves shall be assigned a I valve category number and be grouped including the following:
- a. Vendor
- b. Valve type
- c. Valve size
- d. Closing (or seating) control (torque or position) 6.1.2. List valves with identical systes purpose or function (per Exhibit VIII) and valve category (per Exhibit I) utilizing the same sheet of the D/P Limit Review Record I (Exhibit II) and transmit to the appropriate I Systes Engineer. '
i 1
I
PROCEDURE CONTINUATION SHEET ED 79 7t A suSJECT L5 LJD L LSQ U/ t' Limits EPPECTIVE D ATE PAGE No.
and Tests For MOVs 04/07/86 4 22 NEP-092 o,
6.2 Determination of Limiting Conditions of Differential Pressure or Flow Responsibility Action System Engineer 6.2.1 Determines and documents (Exhibit II) maximum and minimum conditions of D/P and flow to establish the maximum D/P limit under which the valve is to perform its design function. Considers, as appropriate, the following types of information:
- a. Pump suction and discharge conditions
- b. Safety relief valve set points
- c. Valve normal, upset, emergency, and faulted conditions
- d. USAR & Tech Spec conditions for System and Valve
- e. Single equipment failure, inadvertent equipment operation
- f. Whether the valve (gate or globe) is to open or close against a full flowing system? ,
Note: The greatest thrust on the valve stem will occur when seating or unseating the valve at full differential pressure.
- g. The D/P limit is to be for any anticipated transient 6.2.2 Obtains comments from Station Operations Engineers Department Engineers and resolves comments as neces sa ry.
6.2.3 Prepares description of the process for reaching the limiting D/P.
6.2.4 Transmits the completed Exhibit II along with the resolution of any comments and the description of process for reaching the limiting D/P to the Responsible Engineer.
Responsible Engineer 6.2.5 Checks the System Engineer's completed D/P Limit Review Record (Exhibit II) for completeness.
O
l 1
PROCEDURE CONTINUATION SHEET
. Eo"nA sussect Establish D/P Limits EFFECTIVE o ATE PAGE NO.
and Tests For MOVs 04/07/86 5 22
,, NEP-092 6.3 Select Valves for Performina Confirmatory Tests Responsibility Action Responsible Engineer 6.3.1 Completes Exhibits III & IV to the extent necessary to select valves to be evaluated for test achievability )
including the following: )
1 1
- a. Manufacturer, type, size, and design rating should be obtained from NEP-091 )
1 Exhibit I. '
1
- b. The " Required Torque in FT-LBS" using the D/P limit justified for each valve listed using NEP-080.
- c. Use Limitorque stalled rotor torque value i (NEP-091 Exhibit II) for " Torque Available-FT-LBS" and calculate the ratio of torque available to torque required.
- d. Establishes test categories for Exhibit IV by valve type and size, i.e., globe valves up to 8 inches in one test category.
- e. Indicates on Exhibit IV torque seated valve type, size, valve category, and quantity utilizing the List of Nuclear Safety-Related MOVs (Exhibit I).
- f. Records on Exhibit IV the range of torque ratios (available/ required) utilizing the Review of LCPF (Exhibit III).
- g. Selects and records for each test category on Exhibit IV the valves to be evaluated for confirmatory testing considering the following:
- 1. Approximately 20% of the valves in each test category should be tested.
- 2. Valves with the lowest torque ratio (available/ required) should be tested.
1
POOCEDURE CONTINUATION SHEET
- Eo titta SYSJECT LSLdDLLSh U/P timLLS EFFECTIVE D ATE PAoE NO.
and Tests For MOVs 04/07/86 6 22 NEP-092 OF
- 3. Valves are estimated to be testable by' hydro or flow test.
- h. Indicates on the form for Review of LCPF (Exhibit III) which valves are selected to be evaluated for confirmatory testing.
- i. List selected valves with identical system purpose of functior. (per Exhibit VIII) and valve category (per Exhibit I) utili::ing the same sheet of the D/P T.est Conditions Review Record (Exhibit V) and transmit to the appropriate System Engineer.
System Engineer 6.3.2 Determines & documents (Exhibit V) conditions of systems for testing each valve to be evaluated for Confirmatory testing. Considers the following, as appropriate:
- a. Conditions of test,
- b. Justification for test conditions.
- c. Reference to piping isometric drawing and valves used as injection points during testing with hydropump or other equipment as necessary to duplicate conditions at a later date.
- d. Records whether system pump flow or hydropump will be used.
- e. If valve is to be "open" tested determine the follo- ag:
- 1. If the valve should be closed prior to the test with the maximus D/P or with zero D/P.
- 2. If the valve should be closed cold and then heated prior to testing.
I I
i l
1
PROCEDURE CONTINUATION SHEET
. Eo retta SwSakCT EstabilSh D/ P Limits EFFECTIVE DATE PAGE NQ.
and Tests For MOVs 04/07/86 7 22 NEP-092 08
- 3. If the valve should be closed hot and then cooled prior to testing.
- f. Test temperature & NDTT temperature for limiting piece of equipment in system during test,
- g. Test Conditions should not lift safety valves.
- h. No freeze seal, will be used to isolate for these tests.
- i. Are there equivalent valves as alternatives for Station Planning selection, i.e. parallel trained valves with similar torque ratio?
- j. Identifies and records whether flow test with valve closure and/or opening is achievable and conditions of test.
- k. Identifies and records whether to perform test in cold shutdown, hot standby or operating plant configuration.
6.3.3 Obtains comments from Station Operations Department Engineers and resolves comments as necessary.
6.3.4 Prepares description of the process for reaching the test condition.
6.3.5 Transmits the completed Exhibit V along with the resolution of any comments and the description of process for reaching the test conditions to the Responsible Engineer.
Responsible Engineer 6.3.6 Checks the System Engineer's completed D/P Test Conditions Review Record (Exhibit V) for completeness.
6.3.7 Completes Exhibit III and checks all l
calculations and exhibits.
- a. Exhibit V data is used to confirm test conditions.
- b. Enters & corrects as necessary all calculations done.in Paragraph 6.3.1.
PROCEDURE CONTINUATION SHEET
- EO 717t A suesEcr Establish D/P Limits EPPECTIVE DATE PAGE No.
and Tests For MOVs 04/07/86 8 22
,, NEP-092 6.3.8 Completes Exhibit IV
- a. Group valves into categories to
- which a sampling of at least 20% will be selected for testing.
4
- b. Determine valves to be tested in each category.
- c. Verify at least 20% of valves have been selected from each group.
6.3.9 Completes Exhibit VI
- a. Select valves and alternates for testing from Exhibit III & IV.
I
- b. List pressure range for D/P using i
Exhibit II, III & V as well as consideration of test sage accuracy.
- c. Discuss the test method with System Engineer & Operations and select test method (s),
- d. Enter remaining data.
4
- e. Enter comments as necessary.
- 6.4. Supervisory Acceptance t
Responsibility Action i
Responsible Engineer, 6.4.1 Attach completed Exhibits I through i Checker, and Responsible VII to a calculation cover sheet, according l Engineering Supervisor to NEP-080.
l l 6.4.2 Verify the adequacy of the Package Approvals, according to NEP-080.
- Responsible Engineer 6.4.3 Provides completed forms to the 1 ,
appropriate Department Secretary / Clerk ;
to complete document recording and filing i in accordance with NEP-080. j 6.4.4 Provides Exhibits II & III to i Responsible Engineers for NOV Data Evaluation Procedure (NEP- 091).
6.4.5 When test conditions or limiting D/P l requirements exceed the vendor's i
rating for D/P, initiates corrective actions per NEP-050. i i
i 1
i I
PROCEDURE CONTINUATION SHEET E O 717 t a sveaser Establish D/P Limits erascrive oars Paos No-and Tests For MOVs 04/07/96 9 o, 22 NEP-092 6.4.6 Submits a copy of the Summary of Motor Operated Valves to Test (Exhibit VI) to the appropriate department supervisor:
- a. Maintenance Engineering i
- b. Mechanical Design Engineering
- c. Nuclear Plant Systems
' d. Licensing j
- e. Operations ,
- f. Performance Engineering ;
a
- g. Ele._:rical Design Engineering i
- h. Engineering Assurance !
7.0 RECORDS 1
7.1 The following documents generated / completed under this procedure are quality records:
7.1.1 Categorized List of Limitorque MOVs 7.1.2 D/P Limit Review Record l 7.1.3 Calculation Sheet for Review of LCPF
, 7.1.4 Confirmatory Test Category Record 1
7.1.5 D/P Test Conditions Review Record l
7.1.6 Summary of Motor Operated Valves to Test 7.1.7 Flow Chart for Establishing D/P Limits and Tests for MOVs 7.1.8 List of Safety-Related Limitorque Valves to be Set Up with MOVs t 7.2 The records identified in this section shall be captured and transmitted to Nuclear Records Management by the transmitting organization identified on the Nuclear Records List. Nuclear Records Management shall process and control these records for retention according to their procedures. Prior to submittal, the sender shall ensure thr.t procedure requirements pertinent to each record have been fulfilled. Each document shall be legible (use black ink, typewriter, or photostatic copy if possible), completely l filled out (use N/A if not applicable), adequately identifiable '
to the ites or activity involved, and shall be stamped, ;
initialed, signed or otherwise authenticated, and dated. '
8.0 EXHIBITS I -
Categorized List of Limitorque MOVs II -
D/P Limit Review Record III Calculation Sheet for Review of LCPF IV -
Confirmatory Test Category Record V -
D/P Test Conditions Review Record VI -
Summary of Motor Operated Valves to Test VII -
Flow Chart for Establishing D/P Limits and Tests for MOVs j
VIII - List of Safety-Related Limitorque Valves to be set up with MOVAT PD 3905P/092
PROCEDURE CONTINUATION SHEET s 0 7171 A sveJact Estabitsh D/F Limits sprscrava oars paos No.
and Tests For MOVs 04/07/86 10 ,, 22 NEP-092 Exhibit I Sheet 1 of 1 CATEGORIZED LIST OF LIMITORQUE MOVS (Includes all Limitorque Operated Nucles e Safety Related MOVs)
I CATEGORY VALVI NO. VEND 01 VALVI VALVI SIATING CONTROL TYPE $125 (70R0U5 08 P08.)
A u
p{rm= D 1 t
lgU. 4pJ I
l l
_ _ _ _ _ _ .- l
PROCEDURE E O 7171 A CONTINUATION SHEET svencr Establish D/P Limits enactive oars PAGE No-and Tests For MOVs 04/07/86 11 o, 22 NEP-092 Exhibit II D/P LIMIT REVIEW RECORD VALVE NO.
PROVIDE URITTEN REVIEW TO JUSTIFY MAI. D/P LIMIT PRESSURE. SYSTEM ENGINEER (RSE/PSE) IS TO PROVIDE ANSWER FOR EACH BLANR ( AS APPROPRI A.
PUMP (OR PRESSURE SOURCE) SUCTION AND/OR DISCHARGE CONDITIONS (FOR VALVE LIMITING CONDITIONS)
NOTE:
PUMP, OTSC OR OTHER SOURCE BY NAME AND EQUIPMENT No.
5.
SAFETY RELIEF VALVE SET POINTS: SUCTION PSIC DISCHARGE PSIC C.
VALVE NORMAL & UPSET CONDITIONS:
- 1. PRESSURE UPSTRZAM MIN. PSIC MAK. PSIG
- 2. PRESSURE DOWNSTRZAM MIN. PSIG MAX. PSIC
- 3. FLOW MIN. GPM MAX. GPM
- 4. OTHER D.
USAR AND TECH SPEC REFERENCE (PAGE & PARAGRAPH ONLY)
SEE ATTACHMENTS FOR DATA.
E.
SINGLE EQUIPMENT FAILURES OR INADVERTANT EQUIPMENT OPERATION:
OPERATIONAL TRANSIENT UP/DOWN STREAM MAX D/P LIMIT PSIC NOTES FOR ABBREVIATIONS:
NAV - NOT AVAILABLE NAP - NOT APPLICABLE OTHER IF DEFINED PREPARED BY:
- DATE f
PROCEDURE EO ?!Mo CONTINUATION SHEET '
sus 4Ec7 tstactLsh U/P Limits EPPECTIVE DATE PAGE NO.
and Tests For MOVs 04/07/86 12 ,, 22 NEP-092 Exhibit II Sheet 2 of 2 D/P LIMIT REVIEW RECORD Rrmw l
(
. [0 :l T0llAIT FINES D/F VALUE FSIC PitIVIOUS TED D/F VALUE PSIC
, PRA'tICUS TID ESTIMATED CONDITIONS:
FitIFAAID BYt
,DATI l
I
PROCEDURE CONTINUATION SHEET t o 71714 svenct t.stablish D/P Limits e * **ctive D ATE ' AGE No-and Tests For MOVs 04/07/86 13 ,, 22 NEP-092 Exhibit IIT CAI.CULATION SHEET h
CALCULATiCas SHttT Valve Category 5o:
so vissa stateo ew=it c atcw6 a o= =o- ae visio= *o ~
Wh*C' or Forn Flowforoperation Review of Valve Limiting Conditions for & Testing of Press ure ****8'" i oneinavoa cave oe caecuso ears Do test conditions or limiting D/P conditions exceed vendor rating? Yes if yes. identify valve No.(s).: No 1 Ve19el Valve Operator T No. Site Type Valve /Oper.
Manufacturer Manufacturer Sise Ave 114Lle E Design D/P Ratina M Torque Ft-Lbs. PSIC 'F Il 8
Or mr-- ? -,
W /A ,ri u; ~
q 6
CUint U .
1 C
7 w
9 to It 12 I '
Valve .
Valve / Operator Lietting Condition Test Categorization T No. For Design Review & Test Catesorization E D/P Flow Direction Desire M PSIC CPM
- ressure Required Torque Ratio Achievable To le Tested Close/Open Up/Down Torque Avail./ Req. Test Plant Tes/No Stresa Ft-Lbe. Method Mode t
> I i I S '
6 7 h e
9 to II
$3
~
PROCEOURE CONTINUATION SHEET '
to sitio sussacy EstaD11sh D/t' Limits EFFECT:ve omit PAQs NQ.
and Tests For MOVs 04/07/86 14 22 NEP-092 or
- CONFIRMATORY TEST CATEGORY RECORD Exhibit IV FOR TORQUE SEATED VALVES Revision No._ Confirmatory Test Category Record Rev. Date For Torque Seated Valves PREPARED BY DATE CHECKED BY DATE TORQUE VALVE VALVE VALVE RANGE OF TEST CATEGORY SEATED SIZE, CAT. QUANTITY TORQUE RATIO VALVE IN. (EXH. #1) AVAILABLE/ NO.
TYPE QTY. 1 (NPS) REQUIRED TESTED GLOBE 1 8 1.5 8 2.5 6 l
......... 8.................. 2 ,,,,,,,,,,,,,,,_,,,,,,,,,,___,,,,,,,,,,,,,,,, I
SUMMARY
24 TOTAL -
1 GATE .75 2 i
1 12 1.s 3 WlA)
WL/ll V. J h L 5 2 1 3 *3 2.5 11 3 8 4 11 f................. 12 ,,,_,,,,,,,,,,,,_,,,,,,,,,,,___,,,,,,_,,,_,,,
{ 8 2 Sp,qggi, _ ,,:,_ ,,,,,,:,,,,,,,,g 2,Igig_ _,,,,,,,,:, _,,_,,,,,2,,,,,,,,,,,,,_ _ _ ,,
GATE 10 2 12 6 14 6 16 2 18 6 20 2 S129fARY - -
24 TOTAL -
3
1 PROCEDURE CONTINUATION SHEET E O 717 t A susJecT Establish D/P Limits errecTive oAre race No.
and Tests For 110Vs 0/./07/86 15 ,, 22 NEP-092 Exhibit V D/P TEST CONDITIONS REVIEW RECORD D/F TEST CONDITIONS RD IEW RICORD Valve No.
A. Max Pressure to Frevent Lifting Safety Valves:
- 8. Suggested Equivalent Alternative Valves:
C.
If Flow Test. Test Conditione During Valve Opening:
PSIG - GFM - *F -
and During valve Closing:
PSIG - GPM - 'F -
D.
If Hydropump Test. Test Conditione During Valve Opening:
PSIG - GPM - 'T-E. Plant Configuration for Test:
Mode 5 - Cold Shutdown Mode 3 - Hot Standby Mode 1 - Operating I F. If open testing is recommended:
1.
Should valve be closed prior to test with Max D/F or at least D/P?
- 2. Should valve be closed prior to testing cold condition and then heated to system condition prior to opening? '
FRZFARID BY:
MTE:
l
PROCEDURE CONTINUATION SHEET - -
to it 7so sussect tstaD11sh U/f Limits EPPECTIVE DATE PAGE NO.
and Tests For MOVs 04/07/86 16 22 NEP-092 OF Exhibit VI SLHMARY CHART FOR MOTOR OPERATED VALVES TO TEST 8 8
.i. i I8 .
va g
AI*
2 4.:-
a a
- .8 bD gg 23 s 3-f Jea g
~~~g -
, m iaio vive g 5 l< 1-T C
l T$~4 ames b
s.:2 -
4a22 2
-t" 2 i; a
ed um....
a vi
- sI.r 0 0 *g e a
48 2
ata
- )
! 1 ,. .
E1E"3:
t
.l .: a ao n, 3 a '
h.:4:J;i b 1
PROCEDURE CONTINUATION SHEET e O 7171 A sveaect Establish D/P Lietts E**ecTive care ' ace No.
and Tests For MOVs O'./07/86 17 o, 22 NEP-092 Exhibit VII <
Sheet 1 of 2
, FIAW CHART FOR ESTABLISHING D/P LIMITS AND TESTS FOR MOVS
====s ==mm um.mnm am = .as, Mmm as W SWFIN. SW H& M Eaas I 1 N M. W LMT.
W ms m j ese sturge
.B.6 W n.Ra.m i.
mia es m sm ear news a j .= ,J resums. I
- 8. ASTts tem FILN. stLT aessestma m staLahtles Matmas actssa 5W-004. Cafmita ALL WUs a as ser w 6 reste mI3s SETRAF CATERER 133 L3st w maars. me..
- 3. IBet1FT LMTIDs metT1m ffffEB 3833m "8"8" *
- 8
- 8 E'habas 8 M ML4 m qp. l {l un == == u. ==r. e e rarusur .
ll ,i 4 {.3 H l a_ _
g samap D/P W fim LIMmgs g Guommes r 9
. .. . a a a I
db l
I u ....:
, Vs = c i
mv Pecctss assWLf1M IE s i 3
Lintit*: C.1 halt!cs g 9 i g g
. .i . : u ! i 'I u <l 5 l asaresIsta SCIME " / asspess:
Sectuum i
- 3. SEXT taLets Me m PER M M 3 teL98 af4RT Tuffus mim samum pus.
N* W 88MES M M 8MB " """ 06 6.3.4 tit & IT
- 4. SEUEN 1W OmtTmt STWitt 1I EB M ISUEm m ist MtTIM k 6.3.2 T if
. JL orema en asTIS S db 6.3.3 15 iP Balmerr fetus ansattus a 1Et M 6.3.4 9 MIES m
- M 43.4 m
- , . . . _ , ..- . A
PROCEDURE CONTINUATION SHEET EO 7171A Sv8 JECT tSLdD11Sh U/f Lim 1LS E FFECTIVE D ATE PAGE NO.
and Tests For MOVs 04/07/86 18 22 OF NEP-092 Exhibit VII Sheet 2 of 2
. FLOW CHART FOR ESTABLISHING D/P LIMITS AND TESTS FOR MOVS M
PROCCUtt DEFDIT!s 12SPouS!BittTT P90CI' DIRE Fultf GAST l g
~
g l5 V
tas m stu s WCBM ,,,y,,,,,,,,,,g,,,
6.3.7 !!!
1F I "
a.ori a n.I.=T rm l SAIRS POWS
- g l gG 6.3.8 17 1V estum ist Tas? suonar E
=
I 6.3.9 T1 l Ed L
i 1 P i
g 5- = ca = u =
=
CISCIER
-+ ETm s 4.4.1 I se 9111 ,,
U I >
B
. E.
-l 5
- 3
- 6. .a m -
E a
- 6. FILE Cat 4ULAftGBS AND TRANSEIT SWWIART D&TA POR tetserrafts BSSPONSIBLE ENGIN m TRApertT Cat 4UuT105 TO Pitt & Ofun APPtort1 Aft A*i $3 d
6.4 6.. ..3
\ P l 7. 32TIEW TALTE DESIS RAftNCS l MI "N*
EIC Yt3 M la!?S 11 Da T 4.6.5 qr
"# I " tutTIATE 000ASCTITE ACTION f 6.A.) utF-OSS 519F 1
t l
l 0
- mD 7 02 tQ p" 3m y >0 C
b m m am Q. r* O List of Seiety Related festerised Lietterque es O Operated Velves to be Set Up with IIDVATS yf Z mr. -
re m Z se cr C Velve Semeery , ege h r
oN -
73 Queetter Safety functies Key M N
& :r e-h Cete (CT) 46 A - Active M Oe .
flake (GB) g Elephrega (Bli) 25 --- til Subtetel 2
P - Pesolve 0 - Opening $ <%
m m
Deeper (BA) 9 C - Closing O m H Bell (SL) It u - Ilese M Buttsafty (BF) 32 --- 54 Suhtetal 7 - Throttle m 6 Types 165 Total units m4 Velve me. Safety Functies Act. Sise volve Tyne velve Stee Sveten Perseen er Fumettee Ce E y stN Hies m E' AF360 SIS-ee GT 6" AFP (Ple-l) Slecharge P O NN m AF3ee AF599
-Se
-1 GT CT 6"
6" AFP (Pl4-2) Discherse CIV to OTSG E24-2(A) A P 0 0&C
$ql'8D 0 3 AF600 AF3069
-I
-se GT CT 6"
6" CIV te OFSG E24-l(B)
AFW Crees-Tie to OTSG E24-2(A)
A A
0&C 0&C C t4 MM hh N 2 AF3070 -se AF3471 -Se CT GT 6"
AFW Crose-fie to OTSC S24-l(3)
A A
0&C 0&C h%H gmO AFC72 -Se ,
CT i CCl32e SIEB-ees GT 6"
3" AFW Nie to 0T84 E24-2(A)
CBDC Beester P g (FI7e-l) Sectise A
A 0&C C
gO gy $
m CCl338 -400 GT 3" CBBC Beester Pumpe (PI70-2) Sectice A C CCl407A -Se BF 82" CIV - C B C Letdeum & SCP Seel Dischstge A C l> g CClee78 -Se BF 12" CIV - CBBC latdeve & BCP Seel Discharge A C CCleet -800 GT Intdeum Coelete Supply 4 CClel*J -400 CT 4"
4" Intdeve Coolere Supply A
A C
C g
- CClellA -se $
CCIlllt -se BF BF 82" 12" CIV - Intdeum & BCP Seel Supply CIV - Intdeum & BCP Seal Supply A
A C
C m h m CCI56FA -se CT 3" CIV - CBBC Supply ~
CCl5675 -se GT 3" CIV - CM C Supply A
A C
C "r k c
fe cr e
CC2645 -e GT 16" 2 Train Isolettee end Crees-Tie A C 9 M*
CC2649 $
CC4tes
-0
-se GT ce te" 2 Troie Iselettee med Crees-Tie A C g5 I.5" BCP Seele Discherse (P36-1) A C W t' CC4200 -ee GB I,5" BCP Seele Dierherge (P36-2) A C CC*,3ee -se Ce 1.5" BCP Seels Discharge (P36-3) A o4 y CC6400 -80 Ge C mm w 3.5" BCP Seele Discharge (P36-4) A C M CC5095 -e GT 2e* 2 Train Iselettee A C DM 2 CC5096 -e GT 2e" 2 Train Isolettee A C 9
-e CC5e97 CC5494 -e GT GT 82" 82" 2 Train feelettee 2 Trete Iselettee A
A C
C g
CFil -3 GT I4" Teek Discharge u 9
P o CFIB -3 GT 84" Teek Discherse P W O CF2A -e00 C8 I" Test Fluid Crose-Tie P u
- CF2B -ees CS I" Teek Fluid Crees-Tse w
P u b
mm 7 0 33 e
- :R 2m G 90 C
23 V- t wo Ile. Act. Stae Velve Type Velve Stae Sefety Functier se P m System Purpose er Functies Catenary Directaea $ ,", o CFSA -000 CS I" e* O CF5s CSl530
-000 Ce l" Took VePor SP ace Crees Tie Task VePer Space Crees-Tie P
P y
N py 2
-0 Ca 8" CS Pimy Discharge se e -
C38533 -0 A O.C t' 88 2 CS 8" CS Pumy Discharge '" #
CV6245 -000 A 0,C CV6458 -000 GT .75" Leak Test CIV P N ews c h4 GT .75" Leek Test CIV CV20008 CW200lg
-000
-000 GT GT I"
I" SFAS CIV P
P N
N OQ 6 z CV20028 SFAS CIV P N 2 l'
-000 GT la un SFAS CIV CV20038 CV5010A
-000
-000 GT BL I" SFAS CIV P
P N
N O$
sa e<
I CV50108 -000 I" CIV CTIfT Coe Aselyste A C,0 CW5010C -000 SL l" CIV CTtff Gee Amelysis A C,0 [ -t BL 1" CIV CTIff Ces Amelyste CV50800 -000 A C,0 SL I" Civ CT1tf Ces Amelyste CV5050s -000 A C,0 DN I.5" Civ CTIff Can Analysse CV50llA -000 SL L" A C,0 CV50llt -000 CIV CTtti Ces Amelysis A C,0 BL I" Civ CTtff Ces Amelyste CV50 llc -000 SL A C,0 CV50llD -000 l" CIV C1tff Coe Aselyste A C,0 SL I" CIV CTIfr Ces Amelyste CV5ollt -000 DN l.5" A C,0 CV5017 -000 Civ CTWF Gee Amelyste A C,0 DR --
CV5013 -000 DR --
EVB Fee Secties Isolaties A C m CV5024 EWS Fee Secties leeletion A CV5025
-000 DR --
BUS Fee Secties Iseleties A C
C o
-000 DR -- D m CV5037 -000 BF IVS Fee Secties Isolettaa A C yQ 4"
CV5030 -000 W CTIff Bs Purse A C,0 CV5056 4" CTNT Na Purge A C,0 u 2
-000 BR -- N m EWS Fee Section Crose-Tie CV5057 CV5065
-000 000 SR --
EVS Fee Secties Crose-Tie A
A C
C
$0 BF 4" CTIff 5 Dilettoe $
CV5070 -000 W 8" A C,0 m CV5078 -000 Anselme Vacuum Relief A C,0 ar 8" Anselme Vacuum Sellef CV5072 000 N 4" A C,0 CV5073 -000 SF Anmelus Vacuum Relief A C,0 8" Aamules Vacuum Relief CV5074 -000 SF A C.O i 8" Amaules Vacuan Relief CV5075 A C,0
-000 SF 8" Ammeslas Vacueen Relief A CV5076 -000 SF 8" C,0 m CV50 7 7 ' -000 Anselme Vecussa Relief A C,0 BF 8" Amantes Vecuem Relief CV5078 CV5079
-000
-000 SF SF 8" Amaulme Vermeen Relief A
A C,0 C,0 h
mh $
8" Anselme Vacuan Relief Cv5090 -000 BF A C,0 mr py O e
8" Bill A -3 CTIff Na Diluttoe A C,0 p.
CT 10" CIV D1183 -3 A O.C N rt CT 10" CIV DEFA -00 4 0,C GT 84" Bed 8T Isolaties o4 y 01173 -00 GT I4 A O&C eg >-e M BidBT Isolettee 0&C DIISA -00 GT 84" CTNT Barra. Semy A
A 0&C p[
DII93 -00 CT I4" CTttf Emers. Semy 01:11 -3 GT 12" A 0&C ACS ISI Coeldeem DNI2 DII63
-3
-000 CT 82" RCS LPI Caeldewe A
A O&C 0&C h
'O GT 4" LPI/IIPI Piggy Beck D1864 -000 GT 4" A 0&C $
des 30 -00 l#I/IIPI Piggy Sack A 0&C e GT 8" DIIS31 -00 2 Trele Crose-Tie A OC N
. e a ,
e mv E 0 :D e 28 e ~a Valve lle. Act. Siae Valve Type Valve Stae System Purpose or Functaea Sj eg Fuey see Category Directeos Q ;"O C
0181514 -2 GT 82" CIV and 2 Troie Isolation D112733 -l GT 18" DIE Pump Secties Free BWST A
A C,0 C,0
$h Q. O DIl27% -1 GT Del Puey Secties Free BWST DII2735 -000 It" A C,0 g h h GT 3.5" CIV to Par. Spray A C,0 ft r y DII23M -000 GB CIV to Pa:r. Spray DR2012A -00 GT 3.5" 4" CTiff Ilermal Sump Pump Discharge A
A C,0 "
g[ g DR20128 C m cr C
-00 GT 4" CTNT Ilermal Simp Pump Discharge Mel -4 CT 18" A C D FW Mete Step to OTSG E24-2(A)
W612 -4 CT IS" PW Main Step to OTSC E24-1(B) A A C C
[k d es et O (W779 -3 CT IS" Main Coetrole A C Z EW780 -3 CT 18" Main Centrole
<b ym A C o FW 5867 SNC-1 C5 6" leFP Discharge $leck N 7 IRA 5261A -000 DR --
Centrol Sames IVS Istake Isoletten Deepera A " "
NA5262A -800 C m BR --
Centrol Reem IVS !stehe Isolettee Despero A H ILA5305A -000 C m DR --
Lou Veit thest. Supply Despero A ltA53058 C
-000 BR Lau Veit le r. e Supply Dampero A C llA5314A -000 DR --
Lou Volt Bluer. Supply Dampero A C 1845439 -000 BF 12" Red Weste, Fuel tidig and RACA Vestilaties A MAS 440 C
-000 tr 36" Red Weste, Fuel Ildla med RACA Ventilaties A C HA5441 -000 SF 20" liAS442 Red Weste Fuel 19453 med RACA Ventilaties A C
-000 SF 20" Red Weste, Fuel NdIg and RACA Ventilettee A C NP24 -00 GB 2.5" CIV (P54-2) A O&C IIP 28 -00 C8 2.5 .CIV (P58-2) A DEC MP2C -00 G8 2.5" CIV (P58-1) A OEC
- NP2D -00 GB 2.5" CIV (P58-3) A 06C O
- ItP38 -000 GB 1 5" IIP 32 Mio. Socire. Sles Reture Isolaties (P58-2) A C,0 %
-000 G8 8.5" Ilia. Sectac. Bee Reture Isolettee (P58-l) A C,0 OO MB106 -0 GT 6" CIV & AFFT E3-3 flein Block A 0&C 195l064 IESle7
-0 GT 6" CIV & AFFT E3-8 Crees-Tie A 0&C [co"2
-4 CT 6" CIV & AFFT E3-2 Mein Block
- Male 7A -0 A 0&C $
GT 6" CIV & AFFT E3-2 Crose-Tie 188603 -000 A 0&C 4 GT 4" OTSC E24-2(A) Sloudeue A C M56tl -000 GT 4" OTSC E24-I(B) Bloudeus A C lallA -000 GT 2.5" I4tdeve Isolettee and CIV A C lallt -80 GT 2.5" Intdeue Ieeleties med CIV A C MU2A -00 CT 2.5" htdeve Isolaties med Civ A C MU2B +00 GT 2.5" Letdeue feelettee and CIV D lale A C
-80 CS l.5" Letdeve throttle "
N C Mul0A -000 CT 2.5" Somineraliser Stock N C us tw3 N lalles -000 GT 2.5" Domineraliser Stock *""
lelli -000 GB 2.5" Dante. Purify 18 N
C C&O
{g g, p. O ltal2A -000 GT 2.5" Chemical Treataeet
- N C t' CY tell2B 2.5" Muse
-000
-000 GT GT 2.5" Chemical Treatment Desie, u no Supply N
A 0 O g "'p IRf59A -000 GB I" RCP Seal CIV (Pl6-3) A O <*
C N 1R1598 -000 CS N lel59C -000 I" SCP Seal CIV (PM-4) A C *M GB MU590 -000 GB I" RCP Seel Clv (PM-l) A C ew y MU63
-000 GT 2.5" Filter typees '
N O .y 3C2 .00 G8 2.5 Par. Spray Isolation RCIO -00 18 T td GT 2.5" Par. Spray Isoletten A C *0 BCl3 -00 GT 2.5" PORY glock ,
A C,0 o e
N W - ._ _ _ - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ . - - _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ -
m3 7 0 :D e 28 n" Im y >0 C
Velve No. Act. Site Velve Tyg Velve Stae Systes Purvese er Functies Safety Functi.e CetenerY Directice as tv $
n 9C200 -000 GT I" Par. Vest Ber. Stock A 0 (HU".Z e O BC239A -000 CT I* Par. El-Point Yeat 0 RC2398 -000 GT B" Per. Ni-Feint Yeat A
A 0
0 re u
[ d Z BC240A -000 GT B" Ni-Peint Vest i:lV A 0,C m C7 C BC2408 SWIM 6 SWIM F
-000
-000
-000 GT BL SL B"
8
Ni-Fotet Vest i:lV C1NT Air Cooles talet - CIV A
A 0.C C,0
,,3 e 0N
(-
8" CTNT Air Cooler Inlet CIV A C,0 "N SWIMS W1379
-000 BL 8" C1NT Air Cooler Inlet CIV A C,0 lK t~
h
-000 GT 4" Pump Strainer Elowdeus m A 06C Oe4 x SWl380 -000 GT 4" Pump Strainer &lowdeus < h SWl381 -800 A
- 06C gn m GT 4" Fney Streiser tiewdeus SWl382 SNC-04 BF 6* AFW Isolation A
A 06C 0
ev W1383 SNC-04 BF 6" AFW Isolaties A 0 SWl395 See-00 BF 20" TPCW teetation SW1399 A C
-00 SF 20" TPCW Isolaties SW2927 A C
-000 GT 3.5* BWS Castrel Room SW2924 -000 A 0 GT I.5" EWS Centrol Been SW2929 A 0
-00 SF 20" C1dB Discharge Deeder A 0 SW2930 -00 SF 20" SWB Discharge heeder A 0 SW2931 -00 tr 30" SWE Discharge Needer A C SW2932 -80 BF 30" SWE Discherse Needer SW5067 -000 r u .
GT l" Na Dilation Systee Blower A 0
- sW5064 -000 GT I" No Diluttee Systen Blever SW5421 -000 A 0 GT 3" ECCS Reen C%ler Cell Discharge N T $ n' s
Temy. Centrol O -,
SW5422 -000 GT 3" ECCS Reen Coeles Cell Discherse Temp. Centret N T UN SW5423 -000 GT 2" ao o ECCS Seen Cooler Cott Discherse N T
- Dy Temp. Castrel m SW5424 -000 GT 3" ECCS Room Cooler Coil Discharge N T Temp. Centrol SW5425 -000 GT 3" ECCS meam Cooler Coi! Discherse M T Temy. Centrol 3 O
se e/55 m ut t'l N CT M N N CT
- p. O re rt U
- e."
D fT O < N
%H N H
VH y 9
5 m
a O
- D N e
- 1 f
i N __
i Question No. 2.
Confirm that the torque and limit switch adjustments for each nuclear safety related motor operated valve take into account the limiting
.; requirements of Item 1 above.
Response to Question No. 2.
The limiting requirements referred to in Question No. I are taken into account in the torque switch setting. Confirmation is assured by procedure. Nuclear Engineering Procedure-091 (NEP-091), attached, accomplishes this confirmation in two steps:
Step 1 - Paragraph.B.2.b compares the limiting conditions (Question 1) with the manufacturers D/P. If the limiting D/P
- exceeds the manufacturers rated D/P, corrective action is required.
Step 2 - Paragraph B.6 requires evaluating the thrust requirement.
The "as left" torque switch setting will result in available thrust
.., equal to or greater than the thrust required for operation under the- l j '~ limiting D/P and flow condition.
The limit switch is set.to bypass the torque switch during unseating to allow the actuator to develop full thrust during unseating (see response to Question 5). ,
4 l
1 1
1
_ _ - _ _ - - _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ - _ - _ _ _ . _ _ _ - - - _ _ _ _ _ _ _ - _ _ _ _ - _ - _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ -