Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20216E6117 September 1999Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases
ML20210H07328 July 1999Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 FUltimate heat sink
ML20210G43127 July 1999Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, OdcmOffsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML20210G48026 July 1999Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases
ML20210G91626 July 1999Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen MonitorPressure Boundary Leakage
ML20210G53926 July 1999Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate TestingOffsite Dose Calculation Manual
Process Control Program
ML20195F93510 June 1999Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, CrevsUltimate heat sink
ML20207E79421 May 1999Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage CapabilityShutdown Margin
ML20205E50319 March 1999Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 ApplicationPressure Boundary Leakage
ML20204F1829 March 1999Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A
ML20155E49728 October 1998Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance
ML20197G55228 October 1998Rev 8 to Dbnps,Unit 1 Technical Requirements Manual
ML20155E32328 October 1998Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
Fire Protection Program
ML20155D77927 October 1998Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject DefinitionProcess Control Program
Pressure Boundary Leakage
ML20155D85227 October 1998Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS BasesSafe Shutdown
ML20155E07227 October 1998Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000Aging Management
ML20151W3078 September 1998Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer GridsFuel cladding
ML20151W2998 September 1998Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated BasesUltimate heat sink
ML20206D27228 August 1998Rev 11,change 1 to OdcmGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Deep Dose Equivalent
ML20217P83524 April 1998Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves
ML20217P88124 April 1998Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual
ML20217C48820 March 1998Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG
ML20217N44727 February 1998Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431Ultimate heat sink
ML20203L11126 February 1998Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube SheetShutdown Margin
Operating Basis Earthquake
ML20197J26223 December 1997Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,includedSafe Shutdown
Boric Acid
Shutdown Margin
Packing leak
Ultimate heat sink
Pressure Boundary Leakage
ML20197J59723 December 1997Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal SleevesShutdown Margin
Operating Basis Earthquake
Earthquake
ML20217M5605 September 1997Rev 11.0 to Davis-Besse Odcm
ML20217R28226 August 1997Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.cShutdown Margin
ML20217R28726 August 1997Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs
ML20217G59829 July 1997Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating
ML20141F11024 June 1997Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation MonitorsShutdown Margin
ML20138C32618 April 1997Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes InoperableUltimate heat sink
ML20138A68918 April 1997Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-monthsCondition Adverse to Quality
ML20140D9489 April 1997ODCM, Rev 10Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Deep Dose Equivalent
ML20138M12814 February 1997Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance RequirementsEnforcement Discretion
ML20134L05613 February 1997Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve
ML20134F18130 January 1997Proposed Tech Specs Re Possession & Use of SNM as Reactor FuelTornado Generated Missile
Earthquake
ML20134D76230 January 1997Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String ErrorSafe Shutdown
Grab sample
Post Accident Monitoring
Condition Adverse to Quality
Earthquake
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
Unidentified leakage
ML20134B05920 January 1997Proposed Tech Specs 3/4.5.3 Re ECCS SubsystemsUltimate heat sink
Stroke time
Condition Adverse to Quality
ML20132B70311 December 1996Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3Safe Shutdown
Anticipated operational occurrence
Condition Adverse to Quality
Earthquake
ML20134F18928 October 1996Proposed Tech Specs 3/4.8 Re Electrical Power SystemsSafe Shutdown
Condition Adverse to Quality
Fuel cladding
Offsite Circuit
ML20117P53117 September 1996Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel CycleUltimate heat sink
Scaffolding
ML20117N85312 September 1996Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling SystemsBoric Acid
Shutdown Margin
ML20117M2204 September 1996Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours
ML20116K2637 August 1996Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel CycleBoric Acid
Stroke time
VT-2
Design basis earthquake
Grace period
ML20117K19128 May 1996Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval
ML20101M19229 March 1996Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs
ML20101C6966 March 1996Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408
ML20100E0105 February 1996Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays
ML20107C31021 December 1995Rev 9 to OdcmGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent