Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20216E611 | 7 September 1999 | Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases | |
ML20210H073 | 28 July 1999 | Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F | Ultimate heat sink |
ML20210G431 | 27 July 1999 | Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20210G480 | 26 July 1999 | Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases | |
ML20210G916 | 26 July 1999 | Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor | Pressure Boundary Leakage |
ML20210G539 | 26 July 1999 | Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing | Offsite Dose Calculation Manual Process Control Program |
ML20195F935 | 10 June 1999 | Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs | Ultimate heat sink |
ML20207E794 | 21 May 1999 | Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability | Shutdown Margin |
ML20205E503 | 19 March 1999 | Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application | Pressure Boundary Leakage |
ML20204F182 | 9 March 1999 | Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A | |
ML20155E497 | 28 October 1998 | Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance | |
ML20197G552 | 28 October 1998 | Rev 8 to Dbnps,Unit 1 Technical Requirements Manual | |
ML20155E323 | 28 October 1998 | Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Fire Protection Program |
ML20155D779 | 27 October 1998 | Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition | Process Control Program Pressure Boundary Leakage |
ML20155D852 | 27 October 1998 | Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases | Safe Shutdown |
ML20155E072 | 27 October 1998 | Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 | Aging Management |
ML20151W307 | 8 September 1998 | Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids | Fuel cladding |
ML20151W299 | 8 September 1998 | Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases | Ultimate heat sink |
ML20206D272 | 28 August 1998 | Rev 11,change 1 to Odcm | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Deep Dose Equivalent |
ML20217P835 | 24 April 1998 | Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves | |
ML20217P881 | 24 April 1998 | Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual | |
ML20217C488 | 20 March 1998 | Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG | |
ML20217N447 | 27 February 1998 | Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 | Ultimate heat sink |
ML20203L111 | 26 February 1998 | Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet | Shutdown Margin Operating Basis Earthquake |
ML20197J262 | 23 December 1997 | Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included | Safe Shutdown Boric Acid Shutdown Margin Packing leak Ultimate heat sink Pressure Boundary Leakage |
ML20197J597 | 23 December 1997 | Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves | Shutdown Margin Operating Basis Earthquake Earthquake |
ML20217M560 | 5 September 1997 | Rev 11.0 to Davis-Besse Odcm | |
ML20217R282 | 26 August 1997 | Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c | Shutdown Margin |
ML20217R287 | 26 August 1997 | Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs | |
ML20217G598 | 29 July 1997 | Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating | |
ML20141F110 | 24 June 1997 | Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors | Shutdown Margin |
ML20138C326 | 18 April 1997 | Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable | Ultimate heat sink |
ML20138A689 | 18 April 1997 | Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months | Condition Adverse to Quality |
ML20140D948 | 9 April 1997 | ODCM, Rev 10 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Deep Dose Equivalent |
ML20138M128 | 14 February 1997 | Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements | Enforcement Discretion |
ML20134L056 | 13 February 1997 | Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve | |
ML20134F181 | 30 January 1997 | Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel | Tornado Generated Missile Earthquake |
ML20134D762 | 30 January 1997 | Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error | Safe Shutdown Grab sample Post Accident Monitoring Condition Adverse to Quality Earthquake Fuel cladding Pressure Boundary Leakage Pressure boundary leak Unidentified leakage |
ML20134B059 | 20 January 1997 | Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems | Ultimate heat sink Stroke time Condition Adverse to Quality |
ML20132B703 | 11 December 1996 | Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 | Safe Shutdown Anticipated operational occurrence Condition Adverse to Quality Earthquake |
ML20134F189 | 28 October 1996 | Proposed Tech Specs 3/4.8 Re Electrical Power Systems | Safe Shutdown Condition Adverse to Quality Fuel cladding Offsite Circuit |
ML20117P531 | 17 September 1996 | Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle | Ultimate heat sink Scaffolding |
ML20117N853 | 12 September 1996 | Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems | Boric Acid Shutdown Margin |
ML20117M220 | 4 September 1996 | Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours | |
ML20116K263 | 7 August 1996 | Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle | Boric Acid Stroke time VT-2 Design basis earthquake Grace period |
ML20117K191 | 28 May 1996 | Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval | |
ML20101M192 | 29 March 1996 | Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs | |
ML20101C696 | 6 March 1996 | Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 | |
ML20100E010 | 5 February 1996 | Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays | |
ML20107C310 | 21 December 1995 | Rev 9 to Odcm | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent |