MONTHYEARML20141N1721980-01-31031 January 1980 Rev 0 to Procedure RES-OPS-006.00, Operator Training: Draeger Gas Analyzer Use,Function & Applicable Procedure Review. Marked-up AB 1203.14.3 & Ch 4025.01.0 Encl Project stage: Other ML20141N1801985-12-31031 December 1985 Rev 0 to Procedure GOP-OLC-001.00, Operator Licensed Candidate Abnormal Operating Procedures,Loss of Nni Power AB 1203.41 Project stage: Other ML20141N1791985-12-31031 December 1985 Rev 0 to Procedure GOP-OLC-001.00, Operator License Candidate:Abnormal Operating Procedures,Loss of Ac Bus Power Sources AB 1203.28 Project stage: Other ML20141N1631985-12-31031 December 1985 Rev 1 to Procedure GOP-OLC-001.01, Operator Licensed Candidate:Procedures Normal,Abnormal & Emergency,Loss of Instrument Air Project stage: Other ML20141N1601985-12-31031 December 1985 Rev 0 to Procedure RES-OPS-007.00, Operator Training: Infrequent Operations Project stage: Other ML20141N1471985-12-31031 December 1985 Rev 0 to Procedure RES-OP-002,0 Operator Training:Rapid Feedwater Reduction Project stage: Other ML20141N1761986-01-31031 January 1986 Rev 0 to Procedure GOP-OLC-001.00, Operator License Candidate:Abnormal Operating Procedures,Serious Control Room Fire AB-1203.26 Project stage: Other ML20141N1681986-01-31031 January 1986 Rev 0 to Procedure RES-OPS-008.00, Operator Training: Starting of Primary H2O Storage Tank Transfer Pumps Project stage: Other ML20141N1561986-02-26026 February 1986 Procedure Fcr 85-200, Main Feedwater Pumps Rapid Feedwater Reduction Speed Setpoint Project stage: Other ML20141N1531986-02-26026 February 1986 Procedure Fcr 85-201, Steam Generator Level Setpoint Project stage: Other ML20141N1501986-02-26026 February 1986 Procedure Fcr 85-227, Main Feedwater Block Valve Interlock Project stage: Other ML20141N1441986-02-26026 February 1986 Forwards Training Matls in Response to 851030 Request for Addl Info Re Course of Action & Draft SER (NUREG-1177).Matl Meets Commitment Made in Rev 4 of Course of Action Project stage: Draft Request ML20212G6021986-08-0404 August 1986 Safety Evaluation Accepting Util Response to NRC Request for Addl Info Re Question 29 Concerning Training for Infrequent, Critical & Difficult Tasks Project stage: Approval ML20212G5341986-08-0404 August 1986 Forwards SER W/Recommendations Re Util 851116 Response & 860226 Submittal in Response to NRC 851029 Request for Addl Info on Question 29 Concerning Training for Infrequent, Critical & Difficult Tasks Project stage: Approval 1986-01-31
[Table View] |
Text
_-
S/G LOW ' LEVEL SETPOINT y:R 85-201 I.
PURPOSE A.
Reduce possibility of actuating SFRCS on 26.5 in. low level trip.
II.
DESCRIPTION A.
Increase low level setpoint to 40 inches.
1.
Raises power level at which Tave reaches 582 degrees F to approximately 28.5%.
3.
Change the integrated master control low limit from 25%
to 28.S%.
1.
Cause the " Limited S/G Rx demand to Rx control" signal to be above 28.5%.
c.
Change the low limit in the Rx control from 20% to 23.5%.
1.
Prevent Tave control from driving the Rx demand signal below 23.5%.
III.
SUMMARY
This change raises the OTSG low level control setpoint A.
in the Integrated Control System (ICS) from 35" to 40" on the startup OTSG level measurement B.
This change requires no ICS hardware change C.
Changes the operating primary temperature profiles versus load for the NSS 2
D.-
- Effects the Post trip response of the NSS 1.
Results in a slightly increased rate of heat transfer from Primary to Secondary 2.
Results in slightly greater outsurge from the pressurizar G603040422 860226 PDR ADOCK 05000346 V