Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl 1999-09-20
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20205B9601999-03-24024 March 1999 Seventh Partial Response to FOIA Request for Documents. Records in App N Already Available in Pdr.App O Records Being Released in Entirety & App P Records Being Withheld in Part (Ref FOIA Exemptions 7C,2 & 5) ML20205A2771999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Vogtle PPR on 990208.PPR for Plant Involved Participation of All Technical Divs in Evaluating Insp Results & Safety Performance Info for Period of Dec 1997 - Jan 1999 ML20207L8281999-03-0808 March 1999 Forwards Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 & Notice of Violation ML20207J0431999-03-0303 March 1999 Forwards Insp Repts 50-424/98-10 & 50-425/98-10 on 981227- 990213.No Violations Noted.Licensee Conduct of Activities at Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices ML20203G5691999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Ltr Indicating No Candidates or Ltr Listing Names of Candidates for Exam ML20202H9691999-01-29029 January 1999 Forwards Safety Evaluation Authorizing Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant, Unit 1 ML20199J7931999-01-20020 January 1999 Forwards Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226 at Vogtle Units 1 & 2.No Violations Were Identified.Conduct of Activities at Vogtle Was Generally Characterized by safety-conscious Operations ML20199K1381999-01-12012 January 1999 Informs That on 990117,Region II Implemented Staff Reorganization as Part of agency-wide Streamlining Effort, Due to Staffing Reductions in FY99 Budget.Organization Charts Encl ML20198S1601998-12-31031 December 1998 Forwards SER of Licensee Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Vogtle Electric Generating Plant Submitted on 970529. INEEL/EXT-98-01007 Rept Also Encl ML20199E4741998-12-23023 December 1998 Provides Summary of 981105 Training Managers Conference Held in Atlanta,Georgia.Conference Agenda,List of Conference Attendees,Presentation Slides & Preliminary Schedule for FY99 & FY00 Encl ML20199J9781998-12-22022 December 1998 Responds to 981209 Meeting Re Installation of Seismic Clips on Cutler Hammer Electrical Circuit Breakers.Forwards List of Attendees & Handouts ML20198F6711998-12-11011 December 1998 Forwards Insp Repts 50-424/98-08 & 425/98-08 on 980927-1114. No Violations Identified ML20198N9431998-12-10010 December 1998 Ack Receipt of Response, to NOV Issued on 980112 Re Surveillance Testing of Reactor Trip Sys P-4 Interlock Feature at Licensee Facility.Nrc Agrees That Surveillance Testing Not Required ML20196J2181998-12-0101 December 1998 Advises of Planned Insp Effort Resulting from 981102 Insp Planning Meeting.Historical Listing of Plant Issues Called Plant Issues Matrix & Insp Plan,Including Specific Insps Such as in Security & Radiological Protection Areas Encl ML20196J2581998-12-0101 December 1998 Confirms Arrangements Made Between J Bailey & B Holbrook, Re Info Meeting Scheduled for 990210 to Discuss Licensee Performance,New Initiatives & Other Regulatory Issues Pertaining to Listed Facilities ML20196B1231998-11-23023 November 1998 Confirms Telephone Conversation Between J Bailey & P Skinner on 981120 Re Info Meeting Which Has Been Scheduled for 981209 in Atlanta,Ga,To Discuss Issues Re Seismic Retainer Clips ML20196D4981998-11-13013 November 1998 Informs That on 981007,NRC Administered Gfes of Written Operator Licensing Examination.Copy of Answer Key & Master Bw/Pwr GFE Encl,Even Though Facility Did Not Participate in Exam.Without Encl ML20195B3391998-11-0909 November 1998 Forwards Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21).No Violations Noted.Conduct of Activities Generally Characterized by safety-conscious Operations & Sound Engineering ML20155H2501998-10-21021 October 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-424/98-05 & 50-425/98-05 Issued on 980723.Concluded for Reasons Stated That Example 2 Violation Occurred as Stated in NOV ML20155A7491998-10-15015 October 1998 Forwards Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926 & Nov.Insp Generally Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML20155B7771998-10-0909 October 1998 Extends Invitation to Attend Training Manager Conference on 981105 in Atlanta,Georgia.Conference Designed to Inform Regional Training & Operations Mgt of Issues & Policies That Effect Licensing of Reactor Plant Operators ML20155B4621998-09-25025 September 1998 Discusses OI Investigation Which Completed on 980728. Investigation Reviewed Circumstances Surrounding Apparent Disabling of Fire Computer Trouble Alarm by Unit Shift Supervisor.Concludes Enforcement Discretion Warranted ML20153B0401998-09-17017 September 1998 Responds to 980904 e-mail Message Making Certain Observations Re Apparent Increase in Reactor Trips at Plant, Units 1 & 2.NRC Concluded That Licensee post-trip Reviews Adequately Conducted & That No Adverse Trends,Apparent ML20153B9311998-09-16016 September 1998 Forwards RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations, Responses for Plant,Units 1 & 2 ML20153F7081998-09-11011 September 1998 Provides Summary of 980909 Meeting Held to Discuss TS & Other Regulatory Issues Re Vogtle Electric Generating Plant. List of Meeting Attendees & Copy of Presentation Slides Encl ML20154C4871998-09-10010 September 1998 Forwards Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815 & Nov.One Violation Involved Failure to Implement Adequate C/As for Repeated Failures to Enter Applicable TS Limiting Conditions for Operation ML20151U7901998-09-0909 September 1998 Discusses 980615 Request for Exemption from Requirement of 10CFR73.55(e)(1) & (f)(1) to Provide Continuous Staffing of Plant CAS During Contingency Events.Request Denied ML20151S7291998-09-0202 September 1998 Discusses Evaluation of Util Response to GL 97-05 for Plant, Units 1 & 2.NRC Did Not Identify Any Concerns W/Sg Tube Insp Techniques Employed at Plant ML20239A4251998-08-27027 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Nov.Nov Responses Will Be Formally Ack as Part of Periodically Issued Integrated Insp Repts 1999-09-01
[Table view] |
Text
... . - . .-
h l
. ,- msg yngyg gyaygg
/
it k 4 NUCL. EAR REGULATORY COMMISSION neoloN N l
! # 101 MAnNTTA STRET, N.W., SulTE 300 <
Ts , ATLANTA, GeOnGRA 31m350183 )
M..... May 29. 1996 l
i l
l l
EA 95-171 and EA 95-277 Georgia Power Company ATTN: Mr. W. George Ha'irston, III ,
Executive Vice President Post Office Box 1295 Birmingham, Alabama 35201
SUBJECT:
NOTICE OF VIOLATION (DEPARTMENT OF LABOR CASE NOS. 90-ERA-30, 91-ERA-001, AND 91-ERA-011)
Dear Mr. Hairston:
On August 4, 1995, the Secretary of Labor issued a Decision and Remand Order in Department of Labor (00L) Case No. 90-ERA-30, Marvin B. Hobby v. Georgia Power Company. The Secretary of Labor found that, in 1990, senior managers of Georgia Power Company (GPC or licensee) discriminated against Mr. Hobby, former General Manager of GPC's Nuclear Operations Contract Administration (NOCA), when Mr. Hobby's position was eliminated and he was forced to resign from GPC. In addition, the Secretary of Labor found that other acts of ,
discrimination occurred such as relocation of Mr. Hobby's office, restrictions on his access to the building, and revocation of his executive parking j
privileges. The Secretary of Labor determined that GPC terminated Mr. Hobby i for engaging in protected activities, which included his raising safety :
concerns related to the operation of the Vogtle Electric Generating Plant in l an April 27, 1989 memorandum that Mr. Hobby provided to GPC's Vice President of Bulk Power. In the memo and during meetings, Mr. Hobby expressed concerns .
that the actual organizational structure governing operation of the licensee's !
nuclear facilities violated NRC requirements. This Decision and Remand Order i rejected the Department of Labor's Administrative Law Judge's Recommended i Decision and Order issued on November 8, 1991, which found that actions taken against Mr. Hobby were not motivated by his engaging in protected activity.
Our concerns regarding the apparent violation of NRC requirements and a copy of the Secretary of Labor's Decision and Remand Order were transmitted to you i by letter dated September 1, 1995. l A predecisional enforcement conference regarding this matter was conducted in i the Region 11 office on October 4, -1995, to discuss the apparent violation, j the root cause,.and your corrective actions to preclude recurrence. This '
conference was open for public observation in accordance with Section V of the j NRC Enforcement Policy, NUREG-1600. A report summarizing the conference was ,
sent to'you by, letter dated October 11, 1995, j By Decision and Remand Order, dated November 20, 1995, in DOL Case Nos.
ERA-001 and 91-ERA-011, Allen L. Mosbaugh v. Georgia Power Company, the 9610030043 960529 I PDR ADOCK 05000424 i G PDR
_--.,--,-,e. -. .----z-.< w . ~. . - . . - < ~ ~
Georgia Power Company !
Secretary of Labor concluded that GPC discriminated against Mr. Mosbaugh when '
GPC terminated him. In his decision, the Secretary of Labor concluded that '
. Mr. Mosbaugh had engaged in protected activity "by making lawful tape i recordings that constituted evidence gathering in support of a nuclear ;
complaint" and that other employees' potential unwillingness to communicate ;
with Mr. Mosbaugh was not a legitimate reason for discharging him. This ,
Decision and Romand Order rejected the DOL Administrative Law Judge's l
-Recommended Decision and Order issued on October 30, 1992, which found that i Mr. Mosbaugh did not establish that GPC violated the Energy Reorganization Act. A copy of the Secretary of Labor's decision was sent to you under separate cover on December 12, 1995.
On December 11, 1995,- during a telephone conversation between you and-Messrs. Ellis Merschoff and Bruno Uryc of my staff concerning Mr. Mosbaugh's case, you advised that a predecisional enforcement conference was not required at that time. On December 12, 1995, a letter was sent to you requesting that
-you provide an explanation of your views on the apparent violation, its root causes, and a description of planned corrective actions. In addition, you were given an opportunity to point out any disagreement with the facts and/or findings presented in the Secretary of Labor's decision. You also were asked to address the potential chilling effect that Mr. Mosbaugh's termination may have had on other employees. On December 13, 1995, GPC filed a Motion to Reopen the Record and for Further Hearings with DOL in this case . In your December 21, 1995 response to the NRC's December 12 letter, you requested that the NRC allow GPC to defer its response to the apparent violation until its Motion to Reopen is ruled upon. After review of GPC's Motion to Reopen and the December 21, 1995 request, the NRC concluded that deferral of the response !
to the apparent violation was not warranted. By letter dated January 12, '
1996, the NRC reauested that you provide a full response to the apparent violation and potential chilling effect by January 19, 1996. Your response of January 19, 1996 denied the apparent violation and addressed the potential chilling effect associated with the Secretary of Labor's findings.
Based on the Decision and Remand Orders issued by the Secretary of Labor, the 1
We note that, in the Motion to Reopen, GPC has argued that Mr. Mosbaugh deliberately violated NRC requirements and that, as a consequence, pursuant to Section 211(g) of the Energy Reorganization Act, the protections of section 211 do not apply to Mr. Mosbaugh. The NRC recognizes that it found that Mr. '
Mosbaugh was involved in some of the performance failures that resulted in the submittal of inaccurate or incomplete information to the NRC -- see Modified 1 Notice of Violation C.3 (EA 93-304, NRC letter dated March 13, 1995): " . . . ;
the Acting Assistant General Manager - Plant Support, the General Manager for Plant Support, and the Technical Support Manager failed to clarify and verify the starting point of the' successful consecutive DG starts reported in the April 19, 1990 LER'. . . ." However, the NRC did not there find that Mr.
Mosbaugh deliberately violated any requirement. It is the NRC's view that, '
but for Mr. Mosbaugh's activities in raising concerns and taping meetings and conversations among GPC personnel, the evidence to support the enforcement actions with regard to GPC's submittals of inaccurate and incomplete information would not have been obtained.
j - !
s
- Georgia Power Company <
- violations involve the failure to adhere to the requirements of 10 CFR 50.7, '
i Employee Protection, which prohibits discrimination against employees engaging in protected activities. During the predecisional enforcement conference and
- in your letter of January 19, 1996, GPC denied the violations involving i Messrs. Hobby and Mosbaugh. Despite those denials, it is our view, based on i the Secretary of Labor's decisions, that the facts support the conclusion that GPC violated the regulations applicable to employee protection as stated above. Therefore, the NRC adopts the Secretary of Labor's decisions in these i cases and finds that the, actions taken against Messrs. Hobby and Mosbaugh were acts of discrimination for their having engaged in protected activities.
i' These violations are of very significant regulatory concern because they involved acts of discrimination by senior corporate management. The NRC 1 places a high value on the freedom provided to nuclear industry employees to raise potential safety concerns to licensee management or to the NRC. Section i 210 (now 211) of the Energy Reorganization Act and 10 CFR 50.7 establish 1 strict requirements for the protection of employees against discrimination for l raising nuclear safety issues and the NRC Enforcement Policy calls for 1
significant enforcement action in cases where senior corporate management i violate these requirements. Therefore, these violations have been categorized in accordance with the " General Statement of Policy and Procedure _for NRC Enforcement Actions" (Enforcement Policy), NUREG-1600, at Severity Level I.
i In accordance with the Enforcement Policy, a base civil penalty in the amount
- of $100,000 is considered for Severity Level I violations. Because the 4
Statute of Limitations for imposing a civil penalty has expired, no civil penalty is being proposed for the violations. Had the Statute of Limitations i not expired, we would have considered the circumstances surrounding these
- matters, including corrective actions and efforts to avoid a chilling effect, ,
to determine whether to impose civil penalties to the full extent of NRC's J j statutory authority in these cases.
To emphasize the importance of ensuring that employees who raise real or
, perceived safety concerns are not subject to discrimination for raising those
- concerns and that every effort is made to provide an environment in which all employees may freely identify safety issues without fear of retaliation, harassment, intimidation, or discrimination, I have been authorized, after j consultation with the Commission, to issue the enclosed Notice which includes two violations, each categorized at Severity Level I.
You are required to respond to the enclosed Notice and should follow the instructions specified in the enclosed Notice when preparing your response.
i In your response, you should document the specific actions taken and any
,- additional actions you plan to prevent recurrence. Although we recognize that the U.S. District Court for the Northern District of Georgia recently ruled
~
that the Secretary's Order with regard to Mr. Hobby is not final or now immediately enforceable, we are, nevertheless, concerned that your decision in
- the Hobby and Mosbaugh cases -- that GPC would not immediately reinstate Messrs. Hobb) and Mosbaugh as stated in the Decision and Remand Orders of the SOL -- may itself have a chilling effect on other employees. Therefore, in-your response to this letter, you should describe any steps you intend to take to ensure that this decision by GPC will not create a chilling effect. After e
4 Georgia Power Company reviewing your response to the Notice, including any actions you have taken to address the potential chilling effects, and the results of future inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosure and your response will be placed in the NRC Public Dccument Room. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the POR without redaction.
Sincerely, i Stewart D. Ebneter Regional Administrator Docket Nos. 50-424, 50-425 License Nos. NPF-68, NPF-81
Enclosure:
Notice of Violation cc w/ encl: (See next page)
l .
Georgia Power Company cc w/ encl:
Mr. C. K. McCoy Office of the County Commissioner Vice President Burke County Commission Vogtle Electric Generating P1 ant Waynesboro, GA 30830 Georgia Power Company P. O. Box 1295 Harold Reheis, Director Birmingham, AL 35201 Department of Natural Resources 205 Butler Street, SE, Suite 1252 J. D. Woodard Atlanta, GA 30334 Senior Vice President Georgia Power Company Thomas Hill, Manager P. O. Box 1295 Radioactive Materials Program Birmingham, AL 35201 Department of Natural Resources 4244 International Parkway J. B. Beasley Suite 114 General Manager, Plant Vogtle Atlanta, GA 30354 Georgia Power Company P. O. Box 1600 Attorney General Waynesboro, GA 30830 Law Department 132 Judicial Building J. A. Bailey Atlanta, GA 30334 Manager-Licensing Georgia Power Company Ernie Toupin P. O. Box 1295 Manager of Nuclear Operations Birmingham, AL 35201 Oglethorpe Power Corporation 2100 E. Exchange Place ;
Nancy G. Cowles, Counsel Tucker, GA 30085-1349 I Office of the Consumer's Utility Council Charles A. Patrizia Esq. ;
84 Peachtree Street, NW, Suite 201 Paul, Hastings, Janofsky & Walker Atlanta, GA 30303-2318 10th Floor 1299 Pennsylvania Avenue Office of Planning and Budget Washington, D. C. 20004-9500 ,
Room 6158 , )
270 Washington Street, SW l Atlanta, GA 30334
i Georgia Power Company Distribution w/ enc 1:
PUBLIC JTaylor, EDO JMilhoan, DEDR SEbneter, RII LChandler, OGC JGoldberg, OGC EJulian, SECY BKeeling, CA Enforcement Coordinators' RI, RIII, RIV JLieberman, OE JGray, OE OE:EA File (B. Summers, OE) (2)
DRosano,'OE EHayden, OPA DDandois, OC LTemper, OC GCaputo, 01 EJordan, AE00 LNorton, 0IG 0 Wheeler, NRR DHood, NRR RWright, RII CEvans, RII BUyrc, RII KClark, RII RTrojanowski, RII CCasto, RII PSkinner, RII IMS:RII NRC Senior Resident Inspector
U.S. Nuclear Regulatory Commission 8805 River Road Waynesboro, GA 30830