ML20127L888

From kanterella
Jump to navigation Jump to search
Std Order for DOE Work: Determination of Event Sequences Contributing to Overall Frequency of Core Melt, Issued to Sandia Natl Lab
ML20127L888
Person / Time
Issue date: 02/10/1983
From: Speis T
Office of Nuclear Reactor Regulation, SANDIA NATIONAL LABORATORIES
To:
Shared Package
ML20127A418 List: ... further results
References
CON-FIN-A-1298-3, FOIA-84-243 20-83-192, NUDOCS 8505230113
Download: ML20127L888 (5)


Text

'

.. ['RC P3:u 173 u.s.stuCLEAA RERULAYonY COMM6886.4 GKot R NuugE 2 20-83-192 ,

^"

STANDARD ORDER FOR DOE WORK FEB 1 1983 ISUED 70; (DOE Offleel BSUEO SY: (NAC Officol ACCOUNTING CITATION.

AlbuquerqueOperationsOfffee Office of Nuclear Reactor apRo*ReaTion smoi.

Regulation, DST 31X0200.203 asA avueER PERpORuiNo OmeANizATION ANO LOCATION 20-19-50-53-5 Sandia National Laboratory ""u"***

Albuquerque, New Mexico A1298-3 WORx PERiOo . TwiS ORDER FIN TITLE FINED G ESTIMATED O Determination of Event Sequences Contributing to Overall PROM: To:

Frequency of Core Melt 1 0/01/81 11/30/83 08 LIGATION AVAILABILITY PROVIDED BY:

A. THisORDER S 15.000

' *^ ' '* *' ' '" " * * * * ' "

u3iDERTHN!b"E AreEEPEs"$s"oEv'Me'OS.ANoNE EiRSYFOS R $G8S or TEE s esR suMsER c TEo aaOvE 570.000 C. TOTAL ORDERS TO DATE (TOTAL A & 51 g 605.000 D. AMOUNT NCLUDED IN C'* APPLICABLE TO THE " FIN NUMSER" CITENN THIS ORDER. S ,

FINANCI AL PLEXISILITY:

Q PUNDS WILL NOT BE REPROGRAMMED SETWEEN FINS. LINE D CONSTITUTES A LIMITATION ON OSLIGATIONS AUTHORIZED. . .

OL Tl SAUT ORI .

SE[BYlN-STANDARD TERMli AND CONDITIONS PROVIDED DOE ARE CONSIDERED PART OF THIS ORDER UNLESS OTHERWISE NOTED.

ATTACHMENTS:

THE FOLLOW NG ATTACHMENTS ARE HEREBY -

SECURITY:

MADE A PART OF THIS ORDER: D WORK ON THIS ORoER 15 NOT CLASSIFIED.-

O STATEMENT OP WOR K O WORK ON THIS ORDER INVOLVES CLASSIFIED C ADDITIONALTERMS AND CONDITIONS INFORMATION. NRC FORM 157 IS ATTACHED.

O OTHER REuARn3 inermace une preoeset by numser and oore. and inescere or the erreened erstement er work medities the not swooseen:

This order orovides incremental funds "or continuation of work in accordance with the l SNL proposal dated May 14 1982 as mod fied by DOE Work Order Number 20-82-708 dated September 29 1982, extends the period of performance to November 30 1983 and re-queststhat$NLsubmittherevisedproposal20-82-567 Numbers 29 (8/18/82) and 20-82-708 (9/previ pro 1 d NRR/PPAS. Pursu/82) to ant to M J. Ve111ette, NRR/ DSTthwith a l

I cop'1 sh u s1 ,a ress theB. L. Gr n;or,in o , ow subcon ractor informaknual ion- Ch $teha-1102,k l

w t wor wkl$rp- De i

rm J e cost n L3 wh t work b en rform d by ' ubcontractor in e hbnd[,'%EltYe SEdt)bUth1NR0 t oYR u IEah ry

, ATTN: D. Dandois ,

, and provide a copy to the Office of Nuclear Reactor Regulation, ATTN: D. Corley.

I ISSUING AUTHORITY ACCEPTING ORGANIZATION '

I sicNafunt sacNafunt I

Themis P. Spets, Director TetLE TITLE Division of Safety Technology

"^"

tang;s NRCr onTAsrawithin/

ts.7ei 1 Reprogramming the same B&R Number limited andtothe ime Appropriation Symbol. In order for llocati effective this mu

)tified within 5 days so that an approprkhis ate hN Form IN tocan bbe issued and counkfficIgnebt er-s be to maplete the action prior to receipt of any bills.

8505230113 841002 PDR FOIA SHOLLYB4-243 PDR

1 F.... m - '

\ . . ; .. .

- )

l l

4

).

MODIFICATION TO FIN A1298 CHANGE Technical Monitor:

Sarah Davis FTS 492-7546 CHANGE Business Letter Report:

DELETE M. Ernst, DST A00 F. Rowsome, DST O

I l

I

e

,i A/ %

M -

d

- % . M h. M AL.Ala- (

uut hue h Muuut/hr SAat Garuul A 09/ u.1 L A & W j 8xe*. $d Ord &&ly

+o oesq q nua

% N , k ti l A tt d u.)i m M h & A dw a a f 2 a wva j u iu w m cam W, wtk. . Yu. M kHL.4-) d dd etu.cwu-cla.tL amapy Y 5" udm a u. q m my I N'num - c m t

& uA.1 d FWL Am h pompwd

/

a41 col D bs' AL!butuvL uul qw y m p -gp y ,w.

4.uJL A.

.C ifG- Wa . zec,- .. .yncau ,,

p:. .e

.s-  : -

c; A..:.. .

. .4, /fY s.

t

- . 3 - c, *

..n s

NflC rwM 173 u.s. NUCLEAR RESULATOM COMMISSION Of.C E D NuMSE R

"' 20-83-192 ,

^"

STANDARD ORDER FOR DOE WORK FEB 1 1983 ISSUED TO: (DOE Offleel ISSUED SY: (NRC Of fical ACCDUNTING CITATION.

Albuquerque Operations Offlce Office of Nuclear Reactor **aoaaiaTion smooi.

Re9ulation, DST 31X0200.203 ean avMesR esLFORMING ORGANIZATION AND LOCATION 20-19-50-53-5 ria avMesR Sandia National Laboratory Albuquerque, New Mexico A1298-3 WORK rERiOD TwiS ORDER FIN TITLE FIXED G ESTIMATED D Determination of Event Sequences Contributing to Overall FROM: TO: i Frequency of Core Melt 1 0/01/81 11/30/83 08 LIGATION AVAILABILITY PROVIDED BY:

. A. THiS ORDER S 15.000 IfNDE'RTHES!uSS "'i^pE'oSEi$ioEN'*OS*'AND NE EiRUr"/OSIR $c8S 0F TA*E

" " ^~ * ' ' "

S A s saR NUuSER CITED A80VE. 570.000

.C TOTAL ORDERS TO DATE _ -

(TOTAL A & B1 3 605.000 D. AMOUNT INCLUDED IN "C" APPLICABLE TO THE " FIN NUMSER" CITED IN THIS ORDER. S g

FINANCI AL PLEXISILITY:

C FUNDS WILL NOT SE REPROGRAMMED BETWEEN FINS. LINE D CONSTITUTES A LIMITATION ON OSLlGATioNS AUTHORIZED. .

%"A"o^lTf!#SSIM ff"sd"s's s"' "'" """ " * """ "'"""'* ^ "^" "

STANDARD TERMS AND CONDITloNS PROVIDED DOE ARE CONSIDERED PART OF THIS ORDER UNLESS OTHERWISE NOTED.

ATTACHMENTS:

THE FOLLOWING ATTACHMENTS ARE HERESY SECURITY:

MADE A PART OF THIS ORDER: U WORK ON THIS ORDER l$ NOT CLASSIFIED.

. O STATEMENT OF WOR K O WORK ON THIS ORDER INVOLVES CLASSIFIED INFORMATION. NRC FORM 187 IS ATTACHED.

O ADDITIONALTERMS AND CONDITIONS

O OTHER REMARKS (Reference the proposal by number and date. and indreste if the attached statement of work modifies the doe poposed:

This order provides incremental funds for continuation of work in accordance with the SNL proposal dated May 14 1982 as modified by DOE Work Order Number 20-82-708 dated September 29 1982,extendstheperiodofperformancetoNovember30 1983, and re- +

r quests that $NL submit the revised proposal previously requested in 60E Work Order '

l Numbers 20-82-567 (8/18/82) and 20-82-708 (9/29/82 to J. Veillette, NRR/ DST wit'i a -

pr0ui d a ress B. L. Gr n:- , NRR/PPAS. Pursuan to M 1102 th -

win subcon ractor i forma $nual 1on- Ch $tehat wor,k wIlfrO-e ,

l I

cosyls the o <

w i wh t work ubcontractor in i

oq'grmgd ecostgn s bgYRubuM Eahengrformydby< #

l eP'Ec n8[.'% dye M tb0tINRO o ,# ATTN: D. Dandois,

( and provide a copy to the Office of Nuclear Reactor Regulation. ATTN: D. Corley.

l ISSUING AUTHORITY ACCEPTING ORGANIZATION sIG N AT E I sicNarumE i Themis P. Speis, Director r mM7-ivision of Safety Technology l limited to I tangas NRC FO on N$s7s i > 1 Reprogransninkumber wIth,in/ the same B&R and the #' 2//6 /83 i ime Appropriation Symbol. In order for this reallocation to be effective this office mu to

)tifiedwithin5dayssothatanappropriateNRCForm173canDeissuedandcounter-signebtbe j wiplete the action prior to receipt of any bills. l

m, '~,

. U.S. DEPARTMENT OF ENERGY AI.BUQUERQUE OPERATIONS OFFICE DATE. ((S .) 7 1883

$N ETD:BJY(0076)

UaJECT: FY 1983 NRC Authorization: Determination of Event Sequences Contributing to Overall Frequency of Core Melt (A1298-3)

To. A. W. Snyder, Organization 9400, Sandia National Laboratories Thrus G. E. Cordova, Area Manager, Sandia Area Office The attached NRC Standard Order No. 20-83-192 has been accepted by the Albuquerque Operations Office. This order provides $15K in incremental funds for continuation of work and requests a revised proposal be submitted.

Sandia National Laboratories is authorized to provide this assistance, with-out interference to DOE programs, as Reimbursable Work for Other Federal Agencies (Limitation 93). The DOE B&R Classification for this project is 40100102.

For a project anticipated to be supported by NRC beyond this authorization, please advise me when the accrued costs approach 90% of the authorized fund-ing level. Certain projects may require notification before the 90% level is reached in order to assure an orderly closeout. In these cases, based on your advice, we will make an early determination of NRC intent with respect to project continuation. Please assure that actual costs for this project do not exceed the total NRC obligation authority.

ORIGINAL SIGNED BY y C. B. QUINN Dennis L. Krenz s Director, Energy Technologies arg:02-14/3201C -

Division Attachment 2/1/83 Ltr, Speis/Romatowski, w/encis.

ec w/Att:

M. G. Carlyon, Dir., PPBD, AL L. A. Traver, Dir., FMD, AL H. A. Romme, Org. 0143, SNLA E. E. Ritterbush, Org. 3255, SNLA T.*P. Speia, NRR, NRC (173 only)

Corley, NRR, NRC (173 only)

D. Dandois, ORM, NRC cc w/o Att:

  • R. W. Barber, Dir., EV-141, HQ 4

. . - - , , . . , , . , - - . , _ . _ .-- - ,. , - - - , _ .- , , . _ , _ , . ,