MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20046D0941993-08-12012 August 1993 Informs That Encl Ltrs Re Plant Being Placed on Docket for Proceeding.W/Certificate of Svc.Served on 930812 ML20046B9281993-07-30030 July 1993 Forwards NRC Testimony for Hearing to Commence in San Luis Obispo,Ca on 930817.Prof Qualifications Statement of P Maddon Not Available But Will Be Provided on 930802. Related Correspondence ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20029C1781991-03-18018 March 1991 Summarizes Five Workshop Meetings Held in 1990 in Denver,Co to Discuss Ground Motion Aspects of Facility long-term Seismic Program ML20067A9501990-09-21021 September 1990 Advises That No Contractor Costs Records Located for Period 680423-810922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20033E2411990-03-0505 March 1990 Notification of 900307 Meeting W/Ge in Rockville,Md to Discuss Potential Power Reactor Upgrades ML20011F7171990-03-0202 March 1990 Notification of 900313 Meeting W/Util in Rockville,Md to Discuss Plans by Util to Request Tech Spec Change to Increase Allowable Unidentified RCS Leakage Rate from 1 Gpm to 3 Gpm ML20012A9351990-02-28028 February 1990 Advises That Ja Hammer Sucessfully Completed All Requirements for Certification as Operator License Examiner & Is Qualified to Perform Operator Licensing Exams at GE BWR Facilities ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20011E6591990-02-12012 February 1990 Forwards AEOD/E90-02, Crosby Low Pressure Relief Valves Nozzle Ring Problems, & Proposed Info Notice Recommended to Be Sent to All Licenseees to Inform of Benefits of Proper Maint of Valves ML20006D7831990-02-0808 February 1990 Advises That Board Concluded That Holding Prehearing Telcon Re Scheduling Considered Premature Due to Lack of Record,Per .Request for Future Scheduling Suggested to Be Submitted.W/Certificate of Svc.Served on 900209 ML20043D7431990-02-0707 February 1990 Comments on 900129-30 Nrc/Pg&E Geophysical Data Meeting of Plant long-term Seismic Program.To Extent of Representing Flattening of Faults in Ductile Region Below Brittle Upper Crust,Hosgri Fault Do Not Present Direct Seismic Hazard ML20006C4491990-02-0101 February 1990 Requests Telephone Conference Be Set Up at Board Convenience Due to Author Not Being Able to Reach Licensee Counsel ML20006C7501990-02-0101 February 1990 Notification of Significant Licensee Meeting 90-13 on 900208 W/Licensee in Region I Ofc to Discuss Nuclear Safety Concerns Program Enhancements ML20006C7931990-02-0101 February 1990 Documents Verification of Close Out of Multi-Plant Action G-01, Reactor Coolant Pump Trip, for Plants,Per 891219 Memo ML20006C4621990-01-26026 January 1990 Responds to 900117 Joint Request on How NRC & Applicant Counsel Expect to Move Proceeding on Hearing Calendar in New Yr.Applicant Has Expressed Desire to Have Proceeding Held in Abeyance Indefinitely Although NRC Does Not Agree ML20006A0231990-01-17017 January 1990 Requests Info,Within 10 Days,On How to Move Proceeding on Hearing Calendar in New Yr.Certificate of Svc Encl.Served on 900118 ML20005G2241990-01-0404 January 1990 Notification of Significant 900130 & 31 Meetings W/Util in Huntersville,Nc & York,Sc to Discuss SALP Assessments ML20005E6701989-12-29029 December 1989 Forwards Technical Review Rept AEOD/T927, Followup on Steam Binding of Auxiliary Feedwater Pumps (Afw). No Backleakage Events That Occurred After Issuance of Bulletin 85-001 Resulted in Steam Binding of AFW ML19332D8801989-11-30030 November 1989 Notification of 891218 Meeting W/Util in Rockville,Md to Discuss Plans to Integrate Living Schedules for Plants ML19324C5081989-11-0303 November 1989 Notification of Significant Licensee Meeting W/Util on 891130 to Discuss Recent Changes in Operator Licensing Program ML19327B6891989-10-30030 October 1989 Forwards Order,Converting Case Under Chapter 11 to Case Under Chapter 7 Entered on 891020 by Us Bankruptcy Judge for Eastern District of State of Tn Re Alchemie,Identified in Author to Board ML19327B6721989-10-27027 October 1989 Forwards Us Bankruptcy Court for Eastern District of State of Tn Notice to Parties in Interest,For Info.Notice Advises of 891019 Hearing to Consider Two Matters Granted on 891019.W/o Encl ML19325E1471989-10-26026 October 1989 Forwards Fr Notice Re Request for Amends to Designate New Operating Company Time for Filing Antitrust Comments,For Filing & Publication ML19325D9261989-10-23023 October 1989 Advises That Util 891006 Response to Generic Ltr 89-07 Re Safeguards Contingency Planning for short-term Actions Taken to Protect Against Radiological Sabotage Involving Land Vehicle Bomb,Acceptable ML19327B2561989-10-17017 October 1989 Submits Daily Highlight Re Notification of 891019 Meeting W/ Entergy Operations,Inc Concerning Antitrust Provisions & License Conditions for Consolidation of Operations for Arkansas Nuclear One,Waterford & Grand Gulf ML19327B3901989-10-16016 October 1989 Notification of Significant Licensee Meeting 89-166 W/Util on 891023 in King of Prussia,Pa to Discuss Site Health Physics & Emergency Preparedness Programs ML19325D5691989-10-13013 October 1989 Forwards Mi Lewis Requesting That NRC Allow Alchemie to Keep Licenses,For Possible Consideration,Per 10CFR2.715(a).W/Certificate of Svc.Served on 891019 ML19327A6991989-10-11011 October 1989 Notification of 891031 Meeting W/Util in Waynesboro,Ga to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Agenda Encl ML20006F4741989-10-0404 October 1989 Submits Summary of Actions Discussed at ACRS 353rd Meeting on 890907-09,including Repts & Ltrs,Other Actions, Agreements,Assignments & Requests & Future Agenda ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20046D0941993-08-12012 August 1993 Informs That Encl Ltrs Re Plant Being Placed on Docket for Proceeding.W/Certificate of Svc.Served on 930812 ML20046B9281993-07-30030 July 1993 Forwards NRC Testimony for Hearing to Commence in San Luis Obispo,Ca on 930817.Prof Qualifications Statement of P Maddon Not Available But Will Be Provided on 930802. Related Correspondence ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20029C1781991-03-18018 March 1991 Summarizes Five Workshop Meetings Held in 1990 in Denver,Co to Discuss Ground Motion Aspects of Facility long-term Seismic Program ML20067A9501990-09-21021 September 1990 Advises That No Contractor Costs Records Located for Period 680423-810922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20042D6881990-03-29029 March 1990 Staff Requirements Memo Re 900322 Affirmation/Discussion & Vote in Rockville,Md on SECY-90-069 Concerning Fitness for Duty Stay Request Filed by Several Plant Employees ML20033E2411990-03-0505 March 1990 Notification of 900307 Meeting W/Ge in Rockville,Md to Discuss Potential Power Reactor Upgrades ML20011F7171990-03-0202 March 1990 Notification of 900313 Meeting W/Util in Rockville,Md to Discuss Plans by Util to Request Tech Spec Change to Increase Allowable Unidentified RCS Leakage Rate from 1 Gpm to 3 Gpm ML20012A9351990-02-28028 February 1990 Advises That Ja Hammer Sucessfully Completed All Requirements for Certification as Operator License Examiner & Is Qualified to Perform Operator Licensing Exams at GE BWR Facilities ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20011E6591990-02-12012 February 1990 Forwards AEOD/E90-02, Crosby Low Pressure Relief Valves Nozzle Ring Problems, & Proposed Info Notice Recommended to Be Sent to All Licenseees to Inform of Benefits of Proper Maint of Valves ML20006D7831990-02-0808 February 1990 Advises That Board Concluded That Holding Prehearing Telcon Re Scheduling Considered Premature Due to Lack of Record,Per .Request for Future Scheduling Suggested to Be Submitted.W/Certificate of Svc.Served on 900209 ML20043D7431990-02-0707 February 1990 Comments on 900129-30 Nrc/Pg&E Geophysical Data Meeting of Plant long-term Seismic Program.To Extent of Representing Flattening of Faults in Ductile Region Below Brittle Upper Crust,Hosgri Fault Do Not Present Direct Seismic Hazard ML20006C7501990-02-0101 February 1990 Notification of Significant Licensee Meeting 90-13 on 900208 W/Licensee in Region I Ofc to Discuss Nuclear Safety Concerns Program Enhancements ML20006C4491990-02-0101 February 1990 Requests Telephone Conference Be Set Up at Board Convenience Due to Author Not Being Able to Reach Licensee Counsel ML20006C7931990-02-0101 February 1990 Documents Verification of Close Out of Multi-Plant Action G-01, Reactor Coolant Pump Trip, for Plants,Per 891219 Memo ML20006C4621990-01-26026 January 1990 Responds to 900117 Joint Request on How NRC & Applicant Counsel Expect to Move Proceeding on Hearing Calendar in New Yr.Applicant Has Expressed Desire to Have Proceeding Held in Abeyance Indefinitely Although NRC Does Not Agree ML20006A0231990-01-17017 January 1990 Requests Info,Within 10 Days,On How to Move Proceeding on Hearing Calendar in New Yr.Certificate of Svc Encl.Served on 900118 ML20005G2241990-01-0404 January 1990 Notification of Significant 900130 & 31 Meetings W/Util in Huntersville,Nc & York,Sc to Discuss SALP Assessments ML20005E6701989-12-29029 December 1989 Forwards Technical Review Rept AEOD/T927, Followup on Steam Binding of Auxiliary Feedwater Pumps (Afw). No Backleakage Events That Occurred After Issuance of Bulletin 85-001 Resulted in Steam Binding of AFW ML19332D8801989-11-30030 November 1989 Notification of 891218 Meeting W/Util in Rockville,Md to Discuss Plans to Integrate Living Schedules for Plants ML19332D5781989-11-16016 November 1989 Forwards Significant Intergovernmental Activities & Issues Rept for Oct 1989 ML19324C5081989-11-0303 November 1989 Notification of Significant Licensee Meeting W/Util on 891130 to Discuss Recent Changes in Operator Licensing Program ML19327B6891989-10-30030 October 1989 Forwards Order,Converting Case Under Chapter 11 to Case Under Chapter 7 Entered on 891020 by Us Bankruptcy Judge for Eastern District of State of Tn Re Alchemie,Identified in Author to Board ML19327B6721989-10-27027 October 1989 Forwards Us Bankruptcy Court for Eastern District of State of Tn Notice to Parties in Interest,For Info.Notice Advises of 891019 Hearing to Consider Two Matters Granted on 891019.W/o Encl ML19325E1471989-10-26026 October 1989 Forwards Fr Notice Re Request for Amends to Designate New Operating Company Time for Filing Antitrust Comments,For Filing & Publication ML19325D9261989-10-23023 October 1989 Advises That Util 891006 Response to Generic Ltr 89-07 Re Safeguards Contingency Planning for short-term Actions Taken to Protect Against Radiological Sabotage Involving Land Vehicle Bomb,Acceptable ML19327B2561989-10-17017 October 1989 Submits Daily Highlight Re Notification of 891019 Meeting W/ Entergy Operations,Inc Concerning Antitrust Provisions & License Conditions for Consolidation of Operations for Arkansas Nuclear One,Waterford & Grand Gulf ML19327B3901989-10-16016 October 1989 Notification of Significant Licensee Meeting 89-166 W/Util on 891023 in King of Prussia,Pa to Discuss Site Health Physics & Emergency Preparedness Programs ML19325D5691989-10-13013 October 1989 Forwards Mi Lewis Requesting That NRC Allow Alchemie to Keep Licenses,For Possible Consideration,Per 10CFR2.715(a).W/Certificate of Svc.Served on 891019 ML19327A6991989-10-11011 October 1989 Notification of 891031 Meeting W/Util in Waynesboro,Ga to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Agenda Encl ML20006F4741989-10-0404 October 1989 Submits Summary of Actions Discussed at ACRS 353rd Meeting on 890907-09,including Repts & Ltrs,Other Actions, Agreements,Assignments & Requests & Future Agenda ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed 1999-08-27
[Table view] |
Text
),,
UNITED STATES ~
b N^ ' ~
,p.f, 44 g
?
, LEAR REGULATORY COMMISSIO:
- E WASHIN3 TON. D. C< 20555 I
?
\\-% = * *,6 d
lNC-JAN 2 619g3 MEMORAf[DUMFOR:
Jesse L. Funches, Acting Director Planning 'and Program Analysis Staff -
FROM:
Richard H. Vollmer; Director
?
Division of Engineering
~
SUBJECT:
REVISION TO DE FIN PLAN In accordance.with the procedures for processing modifications to approved FIN plans, I am providing a justification for adding a new program to the DE technical assistance plan (FIN A3720).
This program will provide assistance in conducting the Independent Design Verification Program (IDVP) of the Diablo Canyon Nuclear Power Plant.
Specifically, BNL will provide the NRC staff
.with the results of detailed calculations on seismic response of various structures, systems and components.
BNL will also evaluate technical reports and particip' ate in meetings concerning the IDVP.
~
~
The.FY-83' funds for this program should be reprogrammed as.follows:
FIN Current Amount Revised FY-83 Budget From:
$88k S38k 174k 124k To:
A3720 Ok 100k The impact of reprograming these funds is minimal since some of the work on both of the new centracts (A3723 and A3710) vd11 slip into FY-84 due to de-layed start. dates.
As a result, we request reprograming of the identified funds _to this new program.
Attached are revised PIDS to document the actions.
If you have any questions, please call E. Frigi11ana on X28377.
f&.'
Richard H. Vollmer, Director Division of Engineering
Attachment:
Revised FIDS 8505230016 841002
~
NLL 243 PDR 9
. ~ -.., -. - -
.,.-_-m v.---,,--,-.,_.--.,-.--,..-,,---,s, m,-c
.-4, -,y
- .f -
m.
i
' Reliability and Probablistic Assessnents for. Fire Events p]n.
!! UMBER (Non-DOE):
B&R N, UMBER:
NRR OPERATING PLAN 20-19-10-lh-2 INDEX NO.:
ION: Engineering. BRANCH: Chemical Engineer.ingPROJECT MANAGER: F. Nolan
CONTRACT METHOD.: DOE /NRR Brookhaven National Laboratory STATE (Ron-DOE):
SMALL BUSINESS / MINORITY CONTRACT 'Non-DO DNTRACTOR(S):
YES / /
NO /XX/
AMOUNT S UTEDPERIODOFPERFORMANCE
, START:
11/1/82 END:
10/30/85 bTEDFINANCIALDATA(000's).,
PROJECT FY 1983 10TAL TOTAL CARRY fY 83 FY 84 FY 85 OBLIG COSTED OVER
- BUDG, BUDG BUDG
.3eet /2.t/jQ, -
W 200k 2.7c k CATION (RELATE THE PROJECT TO A. SPECIFIC PLANNE'D ACC0!iPLISHMENT) blistic safety studies have been perfomed on several plants and are being performed on all
- ing reactors.
Fire events have been assessed in a few of these studies and these assessments demonstrated :the need for the dev'elopment of a methodology and a data base to red 0ce the l' uncertainties in such assessments.
Similar submittals are expected to be made' by other se;;s.
Attached are proposals we reviewed from BNL and SNL.
NEOUIREMENTS(DESCRIBEWHATISTOBEPERFORMED) ntractor will:
aluate the NRC requirements regarding protection against fire events and for its potential tr either creating or avoiding adverse system interactions during fire and non-fire design -
- ses events:
tabTish a methodology and data ~tiase for pr'obablistic assessment of. fire 'pvents';' ant
.tablish %uidance for the staff's evaluation of probablistic and reliability assessments epared by others.
e G
ICATIO"S (DESC'NISE MAJOR EHA!:GES TO THE PROJECT)
e
- te.
- .. sit m
i.; A r.:.
- 6.,::.v. n..
00:. sct :CE SE!.ECT:0N.'.s
- C/,E:4
- . - ?.
1 staut::.:..cz Relf ability and Probabilistic Assessments for Brookhaven National Laboratory Fire Events (A3710)
. x,.:ce oc.. a.~.... s..
Office of Nuclear Reactor Regulation / Division of Engineering / Chemical Engineering Branch L 14=sppg aC.1M waaa. En e :471 l
/
/
r'
~.n..
...e e= u., w Frank Nolan L m s;n t,i.L.~.:ra r:escase on.ossrso*ss es.e ra tost @
- e eeres t:r ss.ect:en. zee gene:.n es:t.ru Probabilistic safety studies of fire events have been performed on several plants.
Our evaluation of these studies have demonstrated the need for the development of a methodology and a data base to reduce the large uncertainties in such assessments.
. Few organizations have personnel with the. combined required background and i
experience in fire analysis, nuclear st.fety and NRC fire protection guidelines.
In addition, we do not know of any private organizations that have experience
~
in PRA and fire protection ' activities that wouldnot have a conflict of interest.
- The-fire" risks are concerned with safety and shutdown systems-tosses ~that-result from potential fires at nuclear facilities.
Brookhaven has performed fire protection and alternate shutdown rev'iews for us in the past and is one of the DOE organizations that has PRA experience. Therefore, Brookhaven was selected for this effort.
e i
L r.... :m,,..-....,
1 :. t Will'iam V. Johnston, Assistant Director, MQE
-..,.. m:,s.,-,
.,, c.,. e.,.,:,.., c..y.
e
,e i:m Richard H XoiLlmer, Director, DE,$
t,([.
yb/7 3
j O
m
("
, K_ _
3 k,:
Reliability and Probablistic Assessments for. Fire Events.
p}g. New l
R3G)O EtACT NUMBER (Non-DOE): -
B&R N, UMBER:
NRR OPERATING PLAN-
~
,-.. a
')
INDEX NO.:
SION: Engineering. BRANCH: Chemical EngineeringPROJECT MANAGER: F. Nolan
- T-l kACTOR: Brookhaven National Lab.cr.Sandia CONTRACT METHOD.: DOE /NRR National Lab.
o STATE (Non-DOE):
SMALL BUSINESS / MINORITY CONTRACT (Non-D E):
'ONTRACTUR(S):
YES. /
/
NO /
/
AMOUNT 5 C
XCTED PERIOD OF PERFORMANCE START:
11/1/82 END:
1.0/30/85 l
l l
ECTED FINANCIAL DATA (000's),
PROJECT FY 1983
.L TOTAL
-TOTAL CARRY FY 83 FY 84 FY 8S
- E OBLIG COSTED OVER BUDG BUDG BUDG 200k 200k 200k c
ICATION (RELATE THE PROJECT TO A. SPECIFIC PLANHED ACCOMPLISHMENT) j 2ablistic safety studies have been performed on several plants and are being performed on ;allk ating reactors.
Fire events have been assessed in a few of these studies and these assessments a demonstrated :the need for the development of a methodology and a data base to red 0ce the
- c ' uncertainties in such assessments.
Similar submittals are expected to be made' by other ense::s.
Attach ~ed are proposals we reviewed from BNL and SNL.
< REOUIREMENTS (DESCRIBE WHAT IS TO BE PERFORMED) contractor will:
Evaluate the NRC requirements regarding protection against fire events and for its potential for either creating or avoiding adverseriystem interactions during fire and non-fire design bases events:
Establish a methodclogy and data tiase for probablistic assessment of fire'pveht'sliande Establish %uidance for the staff's evaluation of probablistic and reliability assessments prepared by others.
e g
e IFICATIONS (DESCRIBE MAJOR CHANGES TO THE PROJECT)
,