ML20127A453

From kanterella
Jump to navigation Jump to search
Std Order for DOE Work: Safety Evaluation of Core Melt Accidents:Indian Point-OR & Zion-OR, Issued to BNL
ML20127A453
Person / Time
Site: Indian Point, Zion, 05000000
Issue date: 01/24/1983
From: Mattson R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20127A418 List: ... further results
References
CON-FIN-A-3712-3, FOIA-84-243 20-83-218, NUDOCS 8302020229
Download: ML20127A453 (2)


Text

. -

. .' S -

, 4 .- ..

NRC P%u 173 U.S. NUCLE AD RECULATORY COMMISSION ORIER NUM;EQ

't5-79) '

20-83-218 ,

^"

STAf!DARD ORDER FOR DOE WORK g (2 s, m. -

ISSUED TO: (DOE Of fice) ISSUCD BY: (NRC Of fice) ACCCUNTING CITATIOtt Brookhaven Area Office Office of Nuclear Reactor APPROPRIATION SYMBOL Regulation , OSI 31X0200.203 B4R NUMBER PERFORMING ORGANt:ATICN AND LOCATION 20-19-10'11-3 Brookhaven National Laboratory Upton, New York }"{'"

WCR K PERICD . TNtS OROER FIN TITLE FIXE 0 C ' ESTIM ATE:: C Safety Evaluation of Core-Melt Accidents: Indian Point-OR FRCM: TO:

and Zion-0R 01/14/83 07/31 /S4 OSLIGATION AVAILABILITY PROVIOED BY:

A. THIS ORDER S 50.000

8. TOTAL OF CROERS PLACED PRIOR TO THis DATE WITH THE PERFORMING ORGAtwlZATION 4Tl N Swe L~ AN me FiRSnova OiGin OF mE S

'EN5u'M!$"$iNSIffS'e 1.781.000 C. TOTAL ORCERS TO DATE (TOTAL A & 8) g ,_

O. AMOUNT INCLUCEO IN "C" AFPLICAeLE TO THE " FIN NUMBER" CITED IN THIS OR DER. 5 FINANC!AL FLEXtBILITY:

O FUNCS WILL NOT BE REPROGRAMMED BETWEEN FINS. LINE D CCNSTITUTES A LIMITATICN ON OSLIGATICNS AUTHCRIZ E D.

[ FUNCS MAY SE RE8ROGRAMMED NOT TO EXCEED 210% OF FIN LEVEL UP TO SECK. LINE C CCNSTITUTES A LtMITATION CN CetiGATicNS AUTHCMZEO.1/ $EE @ELOW STANCARD TERMS AND CONDITIONS PROVICED DOE ARE CONSIDERED PART OF THIS ORCER UNLESS OTHERWISE NOTED.

ATTACHMENTS:

THE FCLLOWING ATTACHMENTS ARE HERESY SECURITY:

MACE A PART OF THIS ORCER: QWCRK ON THIS CROER IS NOT CLAS$1FIEO.

CSTAT*cMENT OFWORK (godification) . O WORK CN TwiS CsoER invCLves CLAS$;FiE3 C ADDITIONAL TERMS AND CCNCITIONS INFORMATICN. NRC FCRM 187 l$ ATTACHEO.

O OTHER RE!.1 ARgs (ste'erence :he ;rcpossi by number and date. and ondscate of the st: ached s:stement of work mothes the DCZ pic:: scil:

This order provides incremental funds for continuation of work in accordance with the BNL proposal dated December 3, 1982 as modified by adding the attached revised monthly business letter format.

After acceptance, please send to the NRC Office of Resource Management, ATTN- D. Dandois ,

and provide a copy to the Office of Nuclear Reactor Regulation, ATTil: D. Corley.

ISSUING AUTHORITY s ACCEPTING ORGANIZATION sac- TumE SIGNATURE l

RoQer J. Mattson. Ofrector / fI 0-Ts TL E h TITLE Division of Systems Inteqration I/2Nf3 ^"

N:C FO 7si.Jf Reprogramming limited to ganges on ?u instn wi es. thin the same B&R Number and the e Appropriation Symbol.

tificd within 5 days so thatInan order for thisflN r llocatb l this office nu appropriate Form to can be effective,d be issued ancounter-signebt be to plete the action prior to receipt of any bills. -

3d2426. 2 W7 Xs i fG

y.

  • r N AC n=M 173 u.s.Nucta An rsCutarw.y c:a gaON cman Nuuien is 7m . ~

s *-

20-83-218 -

- ^

STANDARD ORDER FOR DOE WORK JAM 2 41983 ISSUEO TO: (00E offleel ISSUEO SY: (NRC Offical ACCOUNTING CITATION.

Brookhaven Area Office Office of Nuclear Reactor APPROPRI ANON 5W808.

Regulation, DSI 31X0200.203 B&R NuMSER PERFORMING ORGANIZATION AND LOCATION 20-19-10-11-3 Brookhaven National Laboratory FIN NUMSER Upton, New York A3712-3 FIN TITLE WOR K PERICO . THIS ORDER FIXf O O Safety Evaluation of Core-Melt Accidents: Indiaa Point-0R FROu:

' ESTIMATED O TO:

and Zion-0R 01/14/83 07/31/84 OBLlGATION AVAILABILITY PROVIDED BY:

A. THIS ORDER 5 50,000 8.

TOTAL OF ORDERS PLACEO PRIOR TO THIS DATE WITH THE PERFORMING ORGANIZATION S

"Ea$"Nu'Ni$"$iWcI"eS'anE N Sm80L" AND THE FIRST FOUR OlGITS OF THE 1.781.000 C. TOTAL ORDERS TO DATE (TOTAL A & B) 81, 31,000

- D-~AMOUNTTNCLtTOEUTTmPFUCABLE TO THE " FIN NIJMBER" ClYED IN THIS ORDER. 3 FINANCIAL FLEXf 81LITY:

C FUNOS AUTHORIZEO. WILL NOT BE REPROGRAMMEO BETWEEN FINS. LINE O CONSTITUTES A LIMITATtON ON OBLIGATIONS Q FUNOS MAY BE REPROGRAMMED NOT TO EXCEEO 210% OF FtN LEVEL UP TO SSOK. LINE C CONSTITUTES ON OBLIGATIONS AUTHORIZEO.1/ SEE BELOW STANDARO TERMS AND CONDITIONS PROvtOED DOE ARE CONSIDEREO PART OF THIS ORDER UNLESS OTHERWISE NOTEO.

ATTACHMENTS:

THE FOLLOWING ATTACHMENTS ARE HERE8Y SECURITY:

MADE A PART OF THIS ORDER:

QWORK ON THIS ORDER IS NOT CLASSIFIEO.

USTATEMENT OFWORK (mod j fica tion) .

O WORK ON THIS ORDER INVOLVES CLASSIFIED C ACOITIONAL TERMS AND CONDITIONS INFORMATION. NRC FCAM 187 IS ATTACHEO.

O OTHER

~

REM ARKS (Reference the proposal by number and date. and ondocate of the attached statement of work modifies the DOC proposall:

This order provides incremental funds for continuation of work in accordance with the BNI. proposal dated December 3,1982 as modified by adding the attached revised monthly business letter format.

After acceptance, please send to the NRC Office of Resource Management, ATTN: D. Dandois, and provide a copy to the Office of Nuclear Reactor Regulation, ATTN: D. Corley.

ISSUING AUTHORITY v , ACCEPTtNG ORGANIZATION Rooer . Mattson. Director R A M rift y ( n ret Q O Division of Systems Integration I/zt/F3 GREGORY J. OGEKA, CHIEF NnC FO 73 If Reprogrammin limited to ^

/ / ADMINISTRATIVE BRANCH anges on 7 Ids w:s.798ithinthesameB&Rhumberandthe M/M/ h 3 CONTD art!Nn nrrte co me Appropriation Symbol. In order for this r tified within 5 days so that an appropriate NNllocat effective this ff Form 'to'bbe can issued arid counkerice signed mustto be mplete the action prior to receipt of any bills.

~ - - . . . .4 -- - - .

. ~ ~ ~ .- -