|
---|
Category:STANDARD WORK ORDER
MONTHYEARML20127N1191983-10-20020 October 1983 Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents:Operating Reactor Reviews for Indian Point & Zion, Issued to BNL ML20127M8561983-09-0202 September 1983 Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents:Operating Reactor Reviews for Indian Point & Zion, Issued to BNL ML20127A8291983-08-0404 August 1983 Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents;Operating Reactor Reviews for Indian Point & Zion, Awarded to BNL ML20127A4531983-01-24024 January 1983 Std Order for DOE Work: Safety Evaluation of Core Melt Accidents:Indian Point-OR & Zion-OR, Issued to BNL ML20127M3211982-12-30030 December 1982 Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor 1983-09-02
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20101S4391992-06-30030 June 1992 Pump & Valve Inservice Testing Program for Indian Point 3 Nuclear Power Plant, Technical Evaluation Rept ML19332B6141989-10-31031 October 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components:Quad Cities 1 & 2, Final Technical Evaluation Rept ML19351A2461989-09-30030 September 1989 Evaluation of Max Density Spent Fuel Rack Structural Analysis for Indian Point Station Unit 3, Technical Evaluation Rept ML20248E2191989-08-16016 August 1989 Mod 16,reflecting Return of Equipment to Tva,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20248E2121989-08-16016 August 1989 Notification of Contract Execution,Mod 16,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20247R3941989-05-16016 May 1989 Mod 15,extending Period of Performance,Providing Addl Work Re Training for NRC Inspectors & Supervisors,Changing NRC Project Officer & Adding TVA Project Manager & Increasing Contract Ceiling & Funding to Use of TVA Reactor.. ML20247R3851989-05-16016 May 1989 Notification of Contract Execution,Mod 15,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn,For Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20246B9731989-03-31031 March 1989 Conformance to Reg Guide 1.97:Byron 1/2 & Braidwood 1/2, Technical Evaluation Rept ML20236B8051989-03-13013 March 1989 Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files ML20235B0231988-12-31031 December 1988 TMI Action,NUREG-0737 (II.D.1),Relief & Safety Valve Testing,Zion Units 1 & 2, Technical Evaluation Rept ML20245F3021988-12-31031 December 1988 Technical Evaluation Rept,Conformance to Generic Ltr 83-28, Item 2.1 (Part 2) Reactor Trip Sys Vendor Interface,Zion Nuclear Generating Station,Units 1 & 2 ML20205N9431988-10-31031 October 1988 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-1 ML20069N2031988-10-31031 October 1988 Rev 1 to, Conformance to Reg Guide 1.97:Indian Point-3, Technical Evaluation Rept ML20244E4191988-07-31031 July 1988 Technical Evaluation Rept,Conformance to Reg Guide 1.97, Zion 1 & 2 ML20155B7531988-06-0101 June 1988 Corrected Mod 1,restoring Funds That Was Deobligated & Providing Final Increment of Funding to Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee, Pilgrim & Seabrook Resident Sites ML20155B7391988-06-0101 June 1988 Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co ML20150D9091988-03-17017 March 1988 Mod 1,deobligating Funds from Total Obligated Amount of Contract & to Correct FIN Number,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites ML20150D9001988-03-17017 March 1988 Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co ML20196F9771988-03-0202 March 1988 Proposed Amend to Facility OLs DPR-39 & DPR-48 to Allow Steam Generator Tube Sleeving ML20196C1641988-02-0404 February 1988 Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 ML20205N9531988-01-31031 January 1988 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-3 ML20205N9481988-01-31031 January 1988 Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components - Millstone-2 ML20149F1691988-01-11011 January 1988 Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20149F1311988-01-11011 January 1988 Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee & Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co ML20236T7461987-11-24024 November 1987 Mod 7,extending Period of Performance Through 880930,adding Addl GE Simulator to Contract & Scheduling Four Simulator Courses Through FY88,to Dresden & Perry Simulator ML20236T7371987-11-24024 November 1987 Notification of Contract Execution,Mod 7,to Dresden & Perry Simulator. Contractor:Ge ML18040B1891987-08-31031 August 1987 Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. ML20237A5461987-08-31031 August 1987 Reactor Coolant Pump Seal Evaluations ML20235V1521987-08-31031 August 1987 Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 ML20235M3591987-08-31031 August 1987 Preliminary Conformance to Reg Guide 1.97:Byron Units 1 & 2 & Braidwood Units 1 & 2, Technical Evaluation Rept ML20237J0621987-08-19019 August 1987 Technical Evaluation Rept on Duke Power Co McGuire & Catawba Nuclear Stations Spds ML20237J1411987-08-17017 August 1987 Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 ML20236P2181987-08-10010 August 1987 Mod 1,increasing Total Amount of Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee, Pilgrim & Seabrook Resident Sites ML20236P2051987-08-10010 August 1987 Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Bell Telephone Co ML20236D9181987-07-31031 July 1987 Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs ML17347A5931987-07-31031 July 1987 Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept ML20236P6401987-07-31031 July 1987 Review of Recirculation Pump Trip Design for Brunswick Steam Electric Plants, Informal Rept ML18052B1931987-06-30030 June 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept ML20214R1481987-05-29029 May 1987 Notification of Contract Execution,Mod 12,to Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators. Contractor:Tva ML20214R1561987-05-29029 May 1987 Mod 12,providing Incremental Funds & Increasing Ceiling,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML18152A5831987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2. ML20214Q8981987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept ML20214R0681987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Arnold,Brunswick-1 & 2, Informal Rept ML18150A1191987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept ML18150A1881987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept ML20206S7871987-04-0808 April 1987 Mod 1,changing Billing Address as Result of NRC Reorganization,To Local Telephone Svc for Yankee Rowe, Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites ML20206G6381987-04-0808 April 1987 Mod 11,recognizing Administrative Changes Due to NRC Reorganization,To Use of TVA Reactor Simulator Facilities at Chattanooga,Tn for Training on Browns Ferry,Sequoyah & Bellefonte Simulators ML20206G0811987-04-0808 April 1987 Notification of Contract Execution,Mod 6,to Dresden & Perry Simulator. Contractor:Ge ML20206F0711987-04-0808 April 1987 Flow-Pattern Results for Tmlb' Accident Sequence in Surry Plant Using Melprog 1992-06-30
[Table view] |
Text
- - -- -- - - -- - - - - - - - - - - - -
..a
'1 . .
}
w ...
j NRC PORu 173 u.s. NUCLEAR RaGULATORY COMMISSION ORDERNUMSER 20-83-602
^
STANDARD ORDER FOR DOE WORK AUG 41983 IBUED TO: (DOE Office) . ISSUED SY: (NRC Officol ACCOUNTING CITATION. ;
Brookhaven Area Offf'ce Office of Nuclear Reactor ^"ao'a '^7'oa 5""-
Regulation, DSI 3U0200.203 esR NumesR
. PERpORueNo ORoANizaTION ANO LOCATION 20-19-10-11-3 Brookhaven National Laboratory Fia aumasa
.Upton, NY ,
A3712 3 WOR K PERIOD . THIS OR DE R
! fin TITLE Safety Evaluation of Core-Melt Accidents Indian a ESmATED o 1
Point - OR and Zion - OR 31 yxEDb3 0 /31 /84 OBLIGATION AVAILABILITY PROVIDED BY:
S A. THis ORDER 10,000
[.fNIlER' THUSu"E
-lifeRopEll? ION SY 80 AN
"' "" " ^ ' "
1 E IR FOUR 130 THE S
. "S&R NUM8ER" CITED A80VE. 5.052_045 ,
C. TOTAt. ORDERS To DATE (TOTAL A & B) 3 D. AMOUNT INCLUDED IN "C" APPLICA8LE TO THE " FIN NUMBER" CITED IN THIS ORDER. 5 FINANCIAL FLEX tSILITY:
I C FUNDS WILL NOT BE REPROGRAMMED SETWEEN FINS. UNE D CONSTITUTES A LIMITATION ON 08LICATIONS AUTHORIZED.
FUNOS MAY BE REPROGRAMMED NOT TO EXCEED 210% OF FIN LEVEL UP TO $50K. LINE C CONSTITUTES A LIMITATION 4 @ ON OWLIGATlONS AUTHORIZED.1/ SEE BELOW -
STANCARD TERMS AND CONDITIONS PROVIDED DOE ARE CONSIDERED PART OF THIS oROER
- UNLESS OTHERWISE NOTED.
ATTACHMENTS:
THE FOLLOWING ATTACHMENTS ARE HERE8Y SECURITY:
MADE A PART OF THIS ORDER: Q WORK ON THIS ORDER 13 NOT CLASSIFIED.
O STATEMENT OF WORK Q WORK CN THtS ORDER INVOLVES CLASSIFIED O ADDITIONALTERMS ANO CONDITIONS INFORMATION. NRC FORM 187 IS ATTACHED.
. O OTHER REMARKS inererence the oroneseo by numeer and date. and indicate at the attached statement of work modoties the 00Eprooosati:
- This order provides incremental funds for continuation of work in accordance with the BNL proposal dated December 2, 1982.
e
! After acceptance, please send to the NRC Office of Resource Management, ATTN: D. Dandois ,
and provide a copy to the Office of Nuclear Reactor Regulation, ATTN: C. Paugh.
ISSUING AUTHORITY , ACCEPTING ORGANIZATION Eg'[r"J.Mattson, Director
/
b tetos ( 7. T'f'E
~
L)J dfdGORY J. OGEXA, CHIEF Division of Systems Integration, RRR Anurwr<TnTive no m-u 1 limited to ^"
changes NRc rO on N s7swit is 7
$1n/ the Reprograminkumber same B&R and the 6 O(QNTRASTING OFFiqM
'same Appropriation Symbol. In order for l to b e fect ye this ffi notified within 5 days so that an approprkhis ate NrN locatiN' Form I can be ssue and counker ce mustto signed be i complete the action prior to receipt of any bills.
N
..', . R?. TECHNICAL ASSISTANCE ?R0"'AM ..
- s. . . - ,-
??AS ACTION SUM..:.RY SHEET DATE ?.ECEIVED BY ??AS: ' $ jb / P7 .
FIN (5): /9J7/4 .
TY?E OF ACTION:
??AS ?.9' ARKS, COMMENTS, IDENTIFI'0ATION OF DEFICIENCIES: OUW COCUMENT(S) MISSiliG FROM FILE .
L D,
DATE ACTION CC:1?LETED BY ' ??AS:
- s. ..
NRC comu 173 u s.Nucte An neoutATony couMissioN omosR NuueEm 15-79) 20-83-602
^"
STANDARD ORDER FOR DOE WORK -
AUG 4 1983 ISSUED TO: IOCE Office) ISSUED 8Y: (NRC Of fice) ACCOUNTING CITATION Brookhaven Area Office Office of Nuclear Reactor ^ " a o"a'AT'ou s m oo u Regulation, OSI 3U0200.203 samuuueca PuRPORMiNG ORGANIZATION AND LOCATION 20-19-10-11-3 Brookhaven National Laboratory em auussa Upton, NY A3712.3 WOR K PERIOD . THIS ORDE R FIN TITLE Safety Evaluation of Core-Melt Accidents Indian FIXED 25 ESTIMATED O Point - OR and Zion - OR
]lgb3 0 /31 /84 08 LIGATION AVAILABILITY PROVIDED BY:
A. THis ORDER S 10.000
- 8. TOTAL OF ORDERS PLACED PRaOR TO THis OATE WsTH THE PERFORMING ORGANIZATION An NSw8 L AN me FiRST FouR OiGiTS Os mE S T[d"Nu'MIiEA"$iNI[ISOS'E g0, e, C. TOTAL ORDERS TO DATE (TOTAL A & 8) g5.062.045 D. AMOUNT INCLUDED IN "C" APPUCASLE TO THE " FIN NUM8ER" CITED IN THIS ORDER. S PINANCIAL PLEX 18tLITY:
C $UNDS WILL NOT BE REPROGRAMMED SETWEEN FINS. UNE D CONSTITUTES A UMITATION ON 08 LIGATIONS AU THORIZED.
FUNOS MAY BE REPROGRAMMED NOT TO EXCEED
- 10% OF FIN LEVEL UP TO $50K. LINE C CONSTITUTES A UMITATION
@ ON OduGATIONS AUTHORIZED. If SEE BELOW _
STANDARD TERMS AND CONDITIONS PROVIDED DOE ARE CONSIDERED PART OF THIS ORDER UNLESS OTHERWISE NOTED.
ATTACHMENTS:
THE FOLLOWING ATTACHMENTS ARE HERE8Y SECURITY: ,
MADE A PART OF THl3 CRCER: Q WORK ON THIS ORDER IS NOT CLASSIFIEO.
O STATEMENT OF WOR K O WCRK CN THl3 OPCER INVOLVES CLASS! PIED C ADDITIONALTERMS AND CONDITIONS INFORMATION. NRC FORM 187 IS ATTACHED.
OOTHER REMARKS (Reference the proposal by number and date. and indicate of the artsched sistement of work modifies the DOE proposat):
This order provides incremental funds for continuation of work in accordance with the BNL proposal dated December 2,1982.
After acceptance, please send to the NRC Office of Resource Management, ATTN: D. Dandois ,
and provide a copy to the Office of Nuclear Reactor Regulation, ATTN: C. paugh.
ISSUING AUTHORITY j ACCEPTING ORGANIZATION smNarvat fI ~ 'cN A rva t RogerJ.Mattson,DirectorId //
i v.n r / ( 77 tirLc .
Division of Systems Integration, MRR /I,J N n is ;gi 1/ Reprogramming limited to ^"
3hanges:c,0N,dson within the same B&R Number and the Jame Appropriation Symbol. In order for this reallocation to be effective this office must be n3tified within 5 days so that an appropriate NRC Form 173 can be issued an,d counter-signed to complete the action prior to receipt of any bills. _
/ '
+ o
, i g .
+
.